Letter Sequence Draft RAI |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, ... further results|Request]]
- Acceptance...
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
- Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval
Other: ML20246G698, ML20258A284, ML20269A465, ML20274A111, ML20274A198, ML20276A192, ML20303A199, ML20307A177, ML20322A052, ML20337A022, ML20351A388, ML21025A340, ML21036A060, ML21067A504, ML21067A507, ML21084A182, ML21091A004, ML21097A027, ML21145A217, ML21181A186, ML21217A187, ML21239A064, ML21239A066, ML21239A068, ML21256A067, ML21256A069, ML21312A002, ML21312A003, ML21312A007, ML23062A466, ML24206A043, PMNS20211071, Discussion Between NRC and Dominion Regarding the North Anna Subsequent License Renewal - Safety Issue - Cyclic Fatigue, PMNS20211128, Discussion Between NRC and Dominion Regarding the North Anna Subsequent License Renewal - an Inconsistency in Documentation Regarding Reactor Coolant Pump Code Case N 481, TLAA 4.7.6
|
MONTHYEARML20246G6982020-08-24024 August 2020 Appendix E: Applicants Environmental Report Subsequent Operating License Renewal Stage North Anna Power Station Units 1 and 2 Project stage: Other ML20246G6972020-08-24024 August 2020 Application for Subsequent Renewed Operating Licenses Project stage: Request ML20269A4652020-10-0606 October 2020 SLRA - Portal Letter Project stage: Other ML20276A1922020-10-0909 October 2020 Subsequent License Renewal Aging Management Audit Plan Project stage: Other ML20258A2842020-10-13013 October 2020 SLRA - Acceptance and Opportunity for Hearing Letter Project stage: Other ML20274A1112020-10-19019 October 2020 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process (EPID No. L-2020-SLE-0000) - Letter to Applicant Project stage: Other ML20274A1982020-10-19019 October 2020 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process (EPID No. L-2020-SLE-0000) - Federal Register Notice Project stage: Other PMNS20201188, Environmental Scoping Meeting Related to the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application2020-10-28028 October 2020 Environmental Scoping Meeting Related to the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application Project stage: Meeting ML20303A1992020-10-29029 October 2020 Subsequent License Renewal Safety Project Management Assignment Project stage: Other ML20307A1772020-11-0404 November 2020 NRC Presentation North Anna Power Station, Units 1 and 2 Subsequent License Renewal Review Project stage: Other ML20317A2062020-11-12012 November 2020 Environmental Scoping Meeting Related to the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application Project stage: Meeting ML20324A6792020-11-13013 November 2020 Comment (1) of Kevin Quigley on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20324A6832020-11-13013 November 2020 Comment (5) from Joseph Sucha on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20324A6822020-11-13013 November 2020 Comment (4) from Keith Scott on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20324A6812020-11-13013 November 2020 Comment (3) from Frederick Gerloff on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20324A6802020-11-13013 November 2020 Comment (2) from Luther Jones on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0512020-11-14014 November 2020 Comment (8) of Lisa Hicks-Thomas on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Units 1 and 2 Project stage: Request ML20324A6862020-11-14014 November 2020 Comment (7) from Nancy Ashberry on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20324A6852020-11-14014 November 2020 Comment (6) from Thomas Owens on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0532020-11-15015 November 2020 Comment (9) of Martin Blough on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0582020-11-16016 November 2020 Comment (12) from Melissa Haley on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0572020-11-16016 November 2020 Comment (11) of Lauren Lopez on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Units 1 and 2 Project stage: Request ML20325A0542020-11-16016 November 2020 Comment (10) of Michael Hamby on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0602020-11-17017 November 2020 Comment (13) of Terry Clouthier on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20329A4392020-11-17017 November 2020 Pamunkey Consultation Request_North Anna Power Station_17NOV20 Project stage: Request ML20325A0662020-11-18018 November 2020 Comment (18) from Jim Norvelle on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0612020-11-18018 November 2020 Comment (14) of Kevin Cordray on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0622020-11-18018 November 2020 Comment (15) from Jason Evans on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0632020-11-18018 November 2020 Comment (16) of Tracy Gill on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0652020-11-18018 November 2020 Comment (17) of Tommy Flynn on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1012020-11-18018 November 2020 Comment (28) from Ralph Joyce on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0682020-11-18018 November 2020 Comment (19) of Ronald Buchanan on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0712020-11-18018 November 2020 Comment (20) of Harold Vaughan on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0722020-11-18018 November 2020 Comment (21) of Mel Holley on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0732020-11-18018 November 2020 Comment (22) of Sarah Marshall on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0742020-11-18018 November 2020 Comment (23) of Andrew Moncol on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0752020-11-18018 November 2020 Comment (24) of Richard Zuercher on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Units 1 and 2 Project stage: Request ML20325A0922020-11-18018 November 2020 Comment (25) of J. Crouch on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0942020-11-18018 November 2020 Comment (26) from J. Crouch on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0972020-11-18018 November 2020 Comment (27) from Jenna Brown on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1132020-11-18018 November 2020 Comment (37) of Shawn Williams on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Units 1 and 2 Project stage: Request ML20325A1242020-11-18018 November 2020 Comment (42) of Edmond Longest on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1172020-11-18018 November 2020 Comment (39) from Carl Aimee Newcomb of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1152020-11-18018 November 2020 Comment (38) of Eric Hendrixson on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1042020-11-18018 November 2020 Comment (30) of David Strole on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1112020-11-18018 November 2020 Comment (35) of Greg Boutchyard on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1052020-11-18018 November 2020 Comment (31) from Carl Eng on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1072020-11-18018 November 2020 Comment (32) of Angela Baker on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1102020-11-18018 November 2020 Comment (34) of Terrance Perrone on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1122020-11-18018 November 2020 Comment (36) from Robert George on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request 2020-11-13
[Table View] |
|
---|
Category:Request for Additional Information (RAI)
MONTHYEARML24087A0112024-03-23023 March 2024 NRR E-mail Capture - Draft RAIs for Reactor Coolant Pump (RCP) Relief Request (L-2024-LLR-0022) ML23318A1172023-11-13013 November 2023 NRR E-mail Capture - Formal Issuance of RAIs for North Anna Technical Support Center (TSC) License Amendment Request (LAR) (L-2023-LLA-0006) ML23257A2092023-09-14014 September 2023 NRR E-mail Capture - Formal Issuance of 2nd Round RAIs for Surry Units 1&2 and North Anna Units 1&2 Emergency Plans LAR ML23243A9862023-08-31031 August 2023 NRR E-mail Capture - Draft RAIs for EP Staff Augmentation Times LAR (L-2022-LLA-0166) ML23219A1602023-08-0707 August 2023 003 Radiation Safety Baseline Inspection Information Request ML23171B0522023-06-20020 June 2023 NRR E-mail Capture - RAI for Review of Appendix F to DOM-NAF-2-P (Redacted) ML23081A5282023-04-26026 April 2023 Request for Additional Information - North Anna Subsequent License Renewal Application Environmental Review ML23075A0232023-03-15015 March 2023 NRR E-mail Capture - RAI - License Amend Req (LAR) to Revise Tech Spec (Ts) 3.6.8 Limiting Condition for Operation to Remove Refueling Water Chemical Addition Tank and Replace the Containment Sump Buffer North Anna, 1 and 2 (L-2022-LLA-0162 ML23060A0932023-03-0101 March 2023 NRR E-mail Capture - Formal Issuance of RAIs for Surry/North Anna Emergency Plans LAR ML23059A2282023-02-28028 February 2023 NRR E-mail Capture - Draft RAIs for Containment Buffer Change to Natb (L-2022-LLA-0162) ML22251A1292022-09-0909 September 2022 Request for Additional Information Related to Response to Generic Letter 2004-04 ML22242A0452022-08-23023 August 2022 NRR E-mail Capture - Dominion GL 04-02 Response Draft RAIs (L-2017-LRC-0000) ML22083A2102022-03-24024 March 2022 NRR E-mail Capture - Draft RAI - Relief Request N2-14-LMT-003 Fourth Ten Year Inservice Inspection Interval ML21327A3652021-11-23023 November 2021 NRR E-mail Capture - Draft RAI for TSTF-577 LAR ML21322A0962021-11-18018 November 2021 Final Request for Additional Information Set 5 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21322A0992021-11-18018 November 2021 Final Request for Additional Information Set 5 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure ML21256A0672021-09-13013 September 2021 Final Request for Confirmation of Information Set 2 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21256A0692021-09-13013 September 2021 Final Request for Confirmation of Information Set 2 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Request for Confirmation of Information ML21238A0942021-08-25025 August 2021 Draft Request for Additional Information Set Z - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21238A0982021-08-25025 August 2021 Draft Request for Additional Information Set Z - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure ML21225A5022021-08-13013 August 2021 Request for Additional Information for North Anna Power Station, Units 1 and 2, Surry Power Station, Units 1 and 2, and Millstone Power Station, Units 2 and 3, Appendix E of Fleet Report Com-Naf-2 (EPID:L02021-LLT-0000) Public Version ML21195A2442021-07-13013 July 2021 NRR E-mail Capture - Draft RAI Appendix E to Topical Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code ML21188A1632021-07-0707 July 2021 Final Request for Additional Information Set 4 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21188A1652021-07-0707 July 2021 Final Request for Additional Information Set 4 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure ML21174A1952021-06-23023 June 2021 Safety RAIs - Set Y - Draft - Enclosure ML21166A3512021-06-15015 June 2021 Safety RAIs - Set 4 - Draft ML21123A2972021-05-0303 May 2021 Final Request for Additional Information Set 3 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - E-mail ML21123A2982021-05-0303 May 2021 Final Request for Additional Information Set 3 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure ML21091A0032021-04-0101 April 2021 Final Request for Additional Information Set 2 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure 1 - RAIs ML21091A0042021-04-0101 April 2021 SLRA Safety Review - Withdrawn Requests for Information (EPID No. L-2020-SLR-0000) - Enclosure 2 ML21076A4622021-03-17017 March 2021 NRR E-mail Capture - Draft RAI for Versatile Internals and Component Program for Reactors Vipre Code Review (L-2021-LLT-0000) ML21075A0032021-03-12012 March 2021 Emergency Preparedness Exercise Inspection Request for Information for - Brunswick, Catawba, North Anna, Oconee, Vogtle 1 & 2 ML21063A5602021-03-0404 March 2021 Final Request for Additional Information Set 1 - North Anna SLRA Safety Review (EPID L-2020-SLR-0000) - Enclosure ML21049A0212021-02-17017 February 2021 Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000338/2021012 and 05000339/2021012) and Request for Information (RFI) ML21028A3902021-01-29029 January 2021 Request for Additional Information - North Anna Subsequent License Renewal Application Environmental Review (EPID Number: L-2020-SLE-0000) (Docket: 50-338 and 50-339) ML21028A4352021-01-28028 January 2021 Notification of Target Set Inspection and Request for Information (NRC Inspection Report No. 05000338/2021404 and 05000339/2021404) ML21012A3412021-01-22022 January 2021 Requests for Confirmation of Information for the Environmental Review of the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application (EPID Number: L-2020-SLE-0000) (Docket: 50-338 and 50-339) ML21019A4512021-01-19019 January 2021 Notification of Inspection and Request for Information ML20316A0422020-11-10010 November 2020 NRR E-mail Capture - FW: Draft RAI for North Anna Unit 2 Steam Generator Tube Inspection Report (ML19179A075) ML20223A3412020-08-10010 August 2020 003 Radiation Safety Baseline Inspection Information Request ML20218A4282020-08-0505 August 2020 Notification of Inspection and Request for Information ML20125A0762020-05-0101 May 2020 NRR E-mail Capture - Draft RAI Related to Revised Reactor Vessel Material Surveillance Capsule Withdrawal Schedule Dominion Energy Virginia North Anna Power Station Units 1 and 2 (L-2020-LLL-0038) ML20113A5792020-04-21021 April 2020 NRR E-mail Capture - Draft RAI North Anna Fifth 10-year Interval Relief Request (L-2020-LLR-0023) ML19354B6142019-12-20020 December 2019 NRR E-mail Capture - Draft RAI for North Anna Relief Request P-9 ML19317F1042019-11-0707 November 2019 NRR E-mail Capture - Draft RAIs for SB LOCA LAR (Non Prop) ML19191A2512019-07-10010 July 2019 NRR E-mail Capture - Request for Additional Information Open Phase Condition LAR ML19169A0962019-06-17017 June 2019 NRR E-mail Capture - Request for Additional Information Emergency Action Level Scheme Change for Millstone Power Station - Units 1, 2, and 3, North Anna Power Station - Units 1 and 2, and Surry Power Station - Units 1 and 2 ML19162A0052019-06-10010 June 2019 NRR E-mail Capture - Draft RAIs for Dominion EAL Scheme Change ML19108A1902019-04-18018 April 2019 Emergency Preparedness Program Inspection Request for Information ML19060A2432019-03-0101 March 2019 Related to License Amendment Request to Address Open Phase Conditions 2024-03-23
[Table view] |
Text
- 1 -
NORTH ANNA POWER STATION, UNITS 1 AND 2 (NAPS)
SUBSEQUENT LICENSE RENEWAL APPLICATION (SLRA)
REQUESTS FOR ADDITIONAL INFORMATION (RAIS)
SAFETY - SET Z
- 1. Reactor Coolant Pump Code Case N 481, TLAA 4.7.6 Regulatory Basis:
Pursuant to 10 CFR 54.13, Completeness and accuracy of information, Information provided to the U.S. Nuclear Regulatory Commission (NRC or staff) by an applicant for a renewed license must be complete and accurate in all material respects.
Background:
The staff reviewed the Dominion Energys TLAA for the reactor coolant pump casing integrity and supporting documents, and the corresponding disposition of 10 CFR 54.21(c)(1)(i),
consistent with the review procedures in NUREG 2192, Standard Review Plan for Review of Subsequent License Renewal Applications for Nuclear Power Plants (SRP-SLR)
Section 4.7.3.1.1 and the acceptance criteria in SRP-SLR Section 4.7.2.1.1.
In conducting this review, the staff noted an inaccuracy between the information provided in the subsequent license renewal application (SLRA) and Dominions supporting documents. The supporting document of interest are:
topical report PWROG 17033-NP-A (Update for Subsequent License Renewal: WCAP-13045, 'Compliance to [American Society of Mechanical Engineers] ASME Code Case N-481 of the Primary Loop Pump Casings of Westinghouse Type Nuclear Steam Supply Systems,' November 2019),
WCAP-18503-P Rev. 1 (Resolution of North Anna Power Station Units 1 & 2 Time-Limited Aging Analyses for Subsequent License Renewal, July 2020).
RAI 4.7.6-1 Issue:
SLRA Section 4.7.6 states:
As discussed in Section 5.4 of WCAP-18503-P, the plant-specific loadings for the reactor coolant pump casing are bounded by the screening loads implemented in the generic analysis performed in PWROG-17033-P-A.
However, Table 5-11 of WCAP-18503-P Rev. 1 shows that the force for the NAPS outlet nozzle exceeds that of the generic approved analysis in WCAP-17033-P-A Rev. 1 (which references WCAP-13045), by a small amount, <2 percent. WCAP-18503-P states that the faulted condition loads for the outlet nozzle exceed the screening loads in WCAP-13045.
- 2 -
WCAP-18503-P also states that the calculations include conservatively large loads and identifies an ASME Code case that could be used in future evaluation efforts to reduce conservatism in the load magnitudes. However, neither the SLRA nor WCAP-18503-P provide evaluations to show either that the loads are bounded or a plant-specific crack stability analysis, as specified in condition 3 of the safety evaluation (SE) for PWROG-17033-NP-A.
Thus the SLRA does not accurately convey the messaging in WCAP-18503-P, and the applicant has not demonstrated that the the plant-specific loads for the reactor coolant pump casing are bounded by the screening loads implemented in the generic analysis performed in PWROG-17033-P-A.
Request:
Please explain and correct the inconsistency. In addition, either:
a) provide a justification for the acceptability of the force for the NAPS outlet nozzle even though it exceeds that of the generic approved analysis in WCAP-17033-P-A (which is contrary to condition 3 of Section 5 of the SE for the report), or b) submit a plant-specific crack stability analysis to demonstrate structural integrity of the reactor coolant pump casing, as specified by condition 3 of Section 5 of the SE for PWROG 17033-NP-A.