Other: ML20258A284, ML20269A465, ML20276A192, ML20303A199, ML21036A060, ML21067A504, ML21067A507, ML21084A182, ML21091A004, ML21097A027, ML21145A217, ML21217A187, ML21239A064, ML21239A066, ML21239A068, ML21256A067, ML21256A069, ML21312A002, ML21312A003, ML21312A007, PMNS20211071, Discussion Between NRC and Dominion Regarding the North Anna Subsequent License Renewal - Safety Issue - Cyclic Fatigue, PMNS20211128, Discussion Between NRC and Dominion Regarding the North Anna Subsequent License Renewal - an Inconsistency in Documentation Regarding Reactor Coolant Pump Code Case N 481, TLAA 4.7.6
|
MONTHYEARML20246G6972020-08-24024 August 2020 Application for Subsequent Renewed Operating Licenses Project stage: Request ML20269A4652020-10-0606 October 2020 SLRA - Portal Letter Project stage: Other ML20276A1922020-10-0909 October 2020 Subsequent License Renewal Aging Management Audit Plan Project stage: Other ML20258A2842020-10-13013 October 2020 SLRA - Acceptance and Opportunity for Hearing Letter Project stage: Other ML20303A1992020-10-29029 October 2020 Subsequent License Renewal Safety Project Management Assignment Project stage: Other ML21035A3032021-02-0404 February 2021 (Naps), Units 1 and 2 - Update to Subsequent License Renewal Application (SLRA) Supplement 1 Project stage: Supplement ML21063A5602021-03-0404 March 2021 Final Request for Additional Information Set 1 - North Anna SLRA Safety Review (EPID L-2020-SLR-0000) - Enclosure Project stage: RAI ML21063A5522021-03-0404 March 2021 Final Request for Additional Information Set 1 - North Anna SLRA Safety Review (EPID L-2020-SLR-0000) - Email Project stage: RAI ML21067A5042021-03-0808 March 2021 Final Request for Confirmation of Information (RCI) Set 1 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email Project stage: Other ML21067A5072021-03-0808 March 2021 Final Request for Confirmation of Information (RCI) Set 1 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure Project stage: Other ML21076B0252021-03-17017 March 2021 Update to Subsequent License Renewal Application, Supplement 2 Project stage: Supplement ML21084A1822021-03-24024 March 2021 Subsequent License Renewal Application Response to NRC Requests for Confirmation of Information for the Safety Review - Set 1 Project stage: Other ML21091A0042021-04-0101 April 2021 SLRA Safety Review - Withdrawn Requests for Information (EPID No. L-2020-SLR-0000) - Enclosure 2 Project stage: Other ML21091A1872021-04-0101 April 2021 Response to NRC Request for Additional Information Regarding Safety Review - Set 1 & Clarification to Aging Management of Fire Protection System Lined Ductile Iron Valves Project stage: Supplement ML21091A0022021-04-0101 April 2021 Final Request for Additional Information Set 2 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email Project stage: RAI ML21091A0032021-04-0101 April 2021 Final Request for Additional Information Set 2 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure 1 - RAIs Project stage: RAI ML21036A0602021-04-0808 April 2021 Report for the Aging Management Audit Regarding the Subsequent License Renewal Application Review Project stage: Other ML21097A0272021-04-14014 April 2021 Request for Withholding from Public Disclosure Regarding Subsequent License Renewal Application Project stage: Other ML21104A0372021-04-15015 April 2021 Request for Withholding Information Regarding Subsequent License Renewal Application Project stage: Withholding Request Acceptance ML21119A2872021-04-29029 April 2021 (Naps), Unit 1 and 2 - Subsequent License Renewal Application (SLRA) Response to NRC Request for Additional Information Safety Review - Set 2 and Flow Accelerated Corrosion Program Enhancement Completion Project stage: Response to RAI ML21123A2972021-05-0303 May 2021 Final Request for Additional Information Set 3 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - E-mail Project stage: RAI ML21123A2982021-05-0303 May 2021 Final Request for Additional Information Set 3 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure Project stage: RAI PMNS20210548, Discussion of Dominions Response to Select Staff RAIs on North Anna Subsequent License Renewal Application2021-05-12012 May 2021 Discussion of Dominions Response to Select Staff RAIs on North Anna Subsequent License Renewal Application Project stage: RAI ML21132A2892021-05-13013 May 2021 SLRA RAI Response Public Meeting Project stage: RAI ML21145A2172021-05-13013 May 2021 Discussion on May 13, 2021 with Dominion on Select Staff RAIs on North Anna Subsequent License Renewal Application - Dominion Slides Project stage: Other ML21221A1542021-05-27027 May 2021 Meeting Summary: Discussion of Dominions Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Dominion Slides Project stage: Meeting ML21147A2932021-05-27027 May 2021 (Naps), Units 1 and 2 Subsequent License Renewal Application (SLRA) Response to NRC Request for Additional Information Safety Review - Set 3 and Administrative Change to SLRA Table A4.0-1, Item 25 Project stage: Response to RAI ML21221A1482021-05-27027 May 2021 Meeting Summary: Discussion of Dominions Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - NRC Slides Project stage: RAI PMNS20210666, Discussion of Dominions Response to Select Staff RAIs on North Anna Subsequent License Renewal Application2021-05-27027 May 2021 Discussion of Dominions Response to Select Staff RAIs on North Anna Subsequent License Renewal Application Project stage: RAI ML21145A2122021-06-0909 June 2021 Meeting Summary: Discussion of Dominions Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Memoranda Project stage: RAI ML21145A2152021-06-0909 June 2021 Meeting Summary: Discussion of Dominions Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Enclosure 2 - List of Attendees Project stage: RAI ML21145A2132021-06-0909 June 2021 Meeting Summary: Discussion of Dominions Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Enclosure 1 - Summary Project stage: RAI PMNS20210777, Discussion of Dominions Response to Select Staff RAIs on North Anna Subsequent License Renewal Application - Topics to Be Determined2021-06-15015 June 2021 Discussion of Dominions Response to Select Staff RAIs on North Anna Subsequent License Renewal Application - Topics to Be Determined Project stage: RAI ML21166A3512021-06-15015 June 2021 Safety RAIs - Set 4 - Draft Project stage: Draft RAI ML21174A3042021-06-23023 June 2021 SLRA RAI Response Public Meeting - 21-06-24 Project stage: RAI PMNS20210778, Discussion of Dominions Response to Select Staff RAIs on North Anna Subsequent License Renewal Application - Topics to Be Determined2021-06-23023 June 2021 Discussion of Dominions Response to Select Staff RAIs on North Anna Subsequent License Renewal Application - Topics to Be Determined Project stage: RAI ML21174A1952021-06-23023 June 2021 Safety RAIs - Set Y - Draft - Enclosure Project stage: Draft RAI ML21188A1632021-07-0707 July 2021 Final Request for Additional Information Set 4 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email Project stage: RAI ML21188A1652021-07-0707 July 2021 Final Request for Additional Information Set 4 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure Project stage: RAI ML21210A3962021-07-29029 July 2021 (Naps), Units 1 and 2 - Subsequent License Renewal Application (SLRA) Response to NRC Request for Additional Information Safety Review - Set 4 and Supplement 3 Project stage: Supplement ML21217A1872021-08-0505 August 2021 (Naps), Units 1 and 2 - Subsequent License Renewal Application First 10 CFR 54.21 (B) Annual Amendment Project stage: Other ML21221A1362021-08-10010 August 2021 Meeting Summary: Discussion of Dominions Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application Project stage: RAI ML21221A1412021-08-10010 August 2021 Meeting Summary: Discussion of Dominions Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Attendees Project stage: RAI ML21221A1382021-08-10010 August 2021 Meeting Summary: Discussion of Dominions Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Meeting Summary Project stage: RAI ML21225A5642021-08-13013 August 2021 Discussion Point for Public Meeting Regarding Fire Protection Piping Cyclic Loading - Presentation Project stage: Meeting PMNS20211071, Discussion Between NRC and Dominion Regarding the North Anna Subsequent License Renewal - Safety Issue - Cyclic Fatigue2021-08-13013 August 2021 Discussion Between NRC and Dominion Regarding the North Anna Subsequent License Renewal - Safety Issue - Cyclic Fatigue Project stage: Other ML21225A5512021-08-13013 August 2021 Discussion Point for Public Meeting Regarding Fire Protection Piping Cyclic Loading - Transmittal E-mail Project stage: Meeting ML21238A0982021-08-25025 August 2021 Draft Request for Additional Information Set Z - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure Project stage: Draft RAI ML21238A0942021-08-25025 August 2021 Draft Request for Additional Information Set Z - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email Project stage: Draft RAI ML21238A2972021-08-26026 August 2021 Subsequent License Renewal Application Supplement 4 Project stage: Supplement 2021-04-08
[Table View] |
Text
Enclosure 1 U.S. Nuclear Regulatory Commission Public Meeting Summary
Title:
Discussion between Nuclear Regulatory Commission (NRC) and Dominion re:
Subsequent License Renewal - Safety Issue - Cyclic Fatigue Date of Meeting: August 16, 2021, 1:00 pm - 2:00 pm Location:
Webinar Type of Meeting: This is an Observation Meeting. This is a meeting in which attendees will have an opportunity to observe the U.S. Nuclear Regulatory Commission (NRC) performing its regulatory function or discussing regulatory issues. Attendees will have an opportunity to ask questions of the NRC staff or make comments about the issues discussed following the business portion of the meeting; however, the NRC is not actively soliciting comments toward regulatory decisions at this meeting.
Purpose of the Meeting(s):
To understand how Virginia Electric and Power Company (Dominion Energy) will age manage cracking due to cyclic loading in fire water piping at North Anna.
General Details:
The NRC staff held a public, observational meeting with Dominion Energy to discuss responses to select NRC requests for additional information associated with the safety review of the North Anna Power Station Subsequent License Renewal Application (SLRA). The meeting began at 1:00 pm and ended approximately at 2:00 pm. There were six NRC staff members and eleven applicant staff and contractor. No members of the public were in attendance. The meeting began with introductions of the NRC staff, Dominion Energy staff and contractor, and members of the public who wished to introduce themselves.
Summary of Meeting:
B2.1.27-1, Cyclic Fatigue of Buried Gray Cast Iron To ensure a constructive discussion, Dominion Energy provided a draft of their proposed changes to the SLRA for managing cracking due to loading in fire water piping at North Anna (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21225A564).
Dominion Energy explained that the proposed supplement would revise the SLRA to also require inspections of buried gray cast iron fire protection piping for detection and evaluation of cracking due to cyclic loading. Specifically, visual (VT), magnetic particle (MT), and radiographic nondestructive examination (NDE) methods will be used on the excavated gray cast iron fire protection piping to inspect for cracking due to cyclic loading. The NDE examination results will be evaluated by a Level II or III examiner qualified in accordance with American Society of Mechanical Engineers Code,Section XI requirements to identify the presence of cracking. If cracking is not identified using the NDE techniques then a 1-foot axial piece of the fire protection piping will still be destructively examined for the loss of material due to selective leaching as described in Generic Aging Lessons Learned for
Subsequent License Renewal (GALL-SLR) Report (NUREG-2191),Section XI.M33, Selective Leaching Program. If cracking is identified, then a 1-foot axial piece of fire protection piping will be selected for further examination for cracking due to cyclic loading and the loss of material due to selective leaching using destructive examination methods.
The 1-foot axial piece of fire protection piping will be selected from a bounding location based on the crack size and characterization provided by the NDE techniques.
The staff and Dominion discussed why Dominion Energy would only be looking at the inner diameter and not the outer diameter. The results of the discussion are that Dominion will explain the logic behind their selection whether just the inner diameter or both the inner and outer diameter so the staff can understand the decision.
The NRC staff noted that only five of the six excavations would be looking for fatigue and asked which type of evaluation would be conducted on the sixth. Dominion Energy explained that the fatigue program and the selective leaching program are working together so the sixth excavation would inspect for selective leaching, but may not be a piping segment, and instead could be another component type, such as a hydrant.
The NRC staff also noted there was no clarifying discussion regarding the rationale for six excavations and the appropriateness of that sample size, given that cyclic loading is not specifically discussed in the GALL. Dominion Energy stated that the supplement will include discussion regarding the rationale for the six excavations.
The staff asked if the MT testing would be fairly routine implementation of MT or whether would it be more difficult to perform. Dominion Energy explained that it would be fairly routine, with nothing special necessary for qualifications or procedures.
The NRC staff and Dominion Energy next discussed how the crack growth analysis and fracture analysis evaluations would be accomplished. Dominion explained that it had available test data from industry to establish fracture data for fracture analysis. For crack growth analysis, Dominion has identified how to get the information to complete the analysis, which could include tracking pressure cycles of the fire water piping and testing.
Dominion stated that additional work may be needed prior to entering the subsequent period of extended operation, including engaging Electric Power Research Institute.
The NRC staff noted that prior corrective action determined that the fire water piping should be replaced, but this effort was halted. Dominion Energy explained that the replacement effort was initiated, and the piping removed was examined and found to be in good condition or fully intact. Therefore, Dominion Energy discontinued the replacement around 2013.
Dominion Energy reiterated the takeaways from the discussion:
Summarize in a paragraph why the proposed NDE methods are appropriate based on operating experience.
o Address whether outer diameter also needs to be examined (in addition to inner diameter) o Address whether subsurface flaws need to be considered
Summarize in paragraph why six excavations are appropriate - designed from the category F from GALL-SLR AMP XI.M41, Buried and Underground Piping and Tanks program.
Further explain why one of the six excavations will be different.
Specifically cite the corrective action program.
Public Participation Themes:
No members of the public were in attendance.
Action Items/Next Steps:
The NRC staff will prepare and issue a meeting summary.
Attachments:
Meeting description and agenda - ADAMS Accession No. ML21225A567 Dominion presentation - ADAMS Accession No. ML21225A564