Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - NRC Slides
ML21221A033
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 06/17/2022
From:
NRC/NRR/DNRL/NLRP
To:
James L, NRR/DNRL/NLRP, 301-415-3306
Shared Package
ML21221A024&amp, #65533 List:
References
L-2020-SLR-0000
Download: ML21221A033 (6)


Text

North Anna Units 1 and 2 SLRA Discussion of Dominion's Response to Select Staff RAIs on Subsequent License Renewal Application June 17, 2021

Agenda

  • Introduction
  • Ground Rules
  • RAI Response Discussion

- B2.1.35-1, RG 1.127, Inspection of Water-Control Structures Associated with Nuclear Power Plant

  • Public Comment
  • Wrap-up 2

Ground Rules

  • Observational Meeting

- Technical Discussion between NRC and Dominion regarding request for additional information (RAI) responses

- The public will have an opportunity at the end of the meeting to make comments or ask the NRC staff questions.

  • RAI Response Discussion

- Dominion will explain what current situation for each item

- NRC staff will ask questions and seek information and understanding

- Each item has been allotted 25 minutes

  • Public Comment

- One member of the public will speak at a time.

- If you want to speak, raise your hand in Teams

- Each member will have three minutes. After which, the individual will be muted 3

B2.1.35-1, RG 1.127, Inspection of Water-Control Structures Associated with Nuclear Power Plants Request:

1. Update the SLRA to include recent settlement related operating experience for the Service Water Valve House.
2. Provide updated acceptance criteria with basis (or process for determining conditional acceptance criteria to ensure intended function) against which the need for corrective actions are evaluated, and/or appropriate enhancement(s) to the program that clearly describe the specific actions that will be taken if the settlement for the water-control structures exceeds the settlement limit specified in the TRM.

4

Public Comment

  • The staff cannot address questions associated with the pending litigation
  • Ground Rules

- Comments/questions should be directed to the NRC staff

- One member of the public will speak at a time.

- If you want to speak, raise your hand in Teams

- Each member will have three minutes. After which, the individual will be muted 5

Wrapup/Adjourn

  • Thank you to all who participated and listened.

6