Letter Sequence Other |
---|
EPID:L-2020-SLE-0000, Comment (1) of Kevin Quigley on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, ... further results|Request]]
- Acceptance...
- Supplement
Results
Other: ML20246G698, ML20258A284, ML20269A465, ML20274A111, ML20274A198, ML20307A177, ML20322A052, ML20337A022, ML20351A388, ML21025A340, ML21181A186, ML23062A466, ML24206A043
|
MONTHYEARML20246G6982020-08-24024 August 2020 Appendix E: Applicant'S Environmental Report Subsequent Operating License Renewal Stage North Anna Power Station Units 1 and 2 Project stage: Other ML20269A4652020-10-0606 October 2020 SLRA - Portal Letter Project stage: Other ML20258A2842020-10-13013 October 2020 SLRA - Acceptance and Opportunity for Hearing Letter Project stage: Other ML20274A1112020-10-19019 October 2020 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process (EPID No. L-2020-SLE-0000) - Letter to Applicant Project stage: Other ML20274A1982020-10-19019 October 2020 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process (EPID No. L-2020-SLE-0000) - Federal Register Notice Project stage: Other PMNS20201188, Environmental Scoping Meeting Related to the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application2020-10-28028 October 2020 Environmental Scoping Meeting Related to the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application Project stage: Meeting ML20307A1772020-11-0404 November 2020 NRC Presentation North Anna Power Station, Units 1 and 2 Subsequent License Renewal Review Project stage: Other ML20317A2062020-11-12012 November 2020 Environmental Scoping Meeting Related to the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application Project stage: Meeting ML20324A6792020-11-13013 November 2020 Comment (1) of Kevin Quigley on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20324A6802020-11-13013 November 2020 Comment (2) from Luther Jones on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20324A6812020-11-13013 November 2020 Comment (3) from Frederick Gerloff on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20324A6822020-11-13013 November 2020 Comment (4) from Keith Scott on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20324A6832020-11-13013 November 2020 Comment (5) from Joseph Sucha on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20324A6852020-11-14014 November 2020 Comment (6) from Thomas Owens on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20324A6862020-11-14014 November 2020 Comment (7) from Nancy Ashberry on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0512020-11-14014 November 2020 Comment (8) of Lisa Hicks-Thomas on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Units 1 and 2 Project stage: Request ML20325A0532020-11-15015 November 2020 Comment (9) of Martin Blough on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0542020-11-16016 November 2020 Comment (10) of Michael Hamby on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0572020-11-16016 November 2020 Comment (11) of Lauren Lopez on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Units 1 and 2 Project stage: Request ML20325A0582020-11-16016 November 2020 Comment (12) from Melissa Haley on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20329A4392020-11-17017 November 2020 Pamunkey Consultation Request_North Anna Power Station_17NOV20 Project stage: Request ML20325A0602020-11-17017 November 2020 Comment (13) of Terry Clouthier on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0652020-11-18018 November 2020 Comment (17) of Tommy Flynn on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1242020-11-18018 November 2020 Comment (42) of Edmond Longest on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1202020-11-18018 November 2020 Comment (41) of Robert Fleshman on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1182020-11-18018 November 2020 Comment (40) of Donald Sharp on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1172020-11-18018 November 2020 Comment (39) from Carl Aimee Newcomb of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1152020-11-18018 November 2020 Comment (38) of Eric Hendrixson on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1132020-11-18018 November 2020 Comment (37) of Shawn Williams on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Units 1 and 2 Project stage: Request ML20325A1122020-11-18018 November 2020 Comment (36) from Robert George on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1112020-11-18018 November 2020 Comment (35) of Greg Boutchyard on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1102020-11-18018 November 2020 Comment (34) of Terrance Perrone on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1092020-11-18018 November 2020 Comment (33) of Adam Perry on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Units 1 and 2 Project stage: Request ML20325A1072020-11-18018 November 2020 Comment (32) of Angela Baker on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1052020-11-18018 November 2020 Comment (31) from Carl Eng on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1042020-11-18018 November 2020 Comment (30) of David Strole on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1012020-11-18018 November 2020 Comment (28) from Ralph Joyce on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0972020-11-18018 November 2020 Comment (27) from Jenna Brown on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0942020-11-18018 November 2020 Comment (26) from J. Crouch on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0752020-11-18018 November 2020 Comment (24) of Richard Zuercher on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Units 1 and 2 Project stage: Request ML20325A1032020-11-18018 November 2020 Comment (29) of Steven Eisenrauch on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0612020-11-18018 November 2020 Comment (14) of Kevin Cordray on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0622020-11-18018 November 2020 Comment (15) from Jason Evans on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0632020-11-18018 November 2020 Comment (16) of Tracy Gill on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0662020-11-18018 November 2020 Comment (18) from Jim Norvelle on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0712020-11-18018 November 2020 Comment (20) of Harold Vaughan on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0922020-11-18018 November 2020 Comment (25) of J. Crouch on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0742020-11-18018 November 2020 Comment (23) of Andrew Moncol on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0732020-11-18018 November 2020 Comment (22) of Sarah Marshall on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0722020-11-18018 November 2020 Comment (21) of Mel Holley on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request 2020-11-14
[Table View] |
|
---|
Category:Letter
MONTHYEARML24302A2402024-10-28028 October 2024 CFR 21 Report 1-BY-BC-1-LV Battery Charger IR 05000338/20240032024-10-28028 October 2024 – Integrated Inspection Report 05000338-2024003 and 05000339-2024003 ML24302A2342024-10-23023 October 2024 Request for Project Number Related to Dominion Energy Services New Nuclear Program at North Anna Power Station ML24283A0392024-10-0909 October 2024 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.D ML24281A1372024-10-0707 October 2024 ISFSI - Submittal of Cask Registration for Spent Fuel Storage 05000338/LER-2024-001-01, Automatic Reactor Trip Due to Prni High Negative Rate2024-09-24024 September 2024 Automatic Reactor Trip Due to Prni High Negative Rate IR 05000338/20244202024-09-23023 September 2024 Security Baseline Inspection Report 05000338/2024420 and 05000339/2024420, Cover Letter ML24243A0872024-09-20020 September 2024 Response to EPA Comments Regarding the Final Site Specific Supplement to the Generic Eist for License Renewal North Anna Power Station, Units 1 and 2 IR 05000338/20244022024-09-17017 September 2024 Security Baseline Inspection Report 05000338/2024402 and 05000339/2024402 ML24215A2622024-08-28028 August 2024 Transmittal Letter for Subsequent Renewed License IR 05000338/20240052024-08-27027 August 2024 Updated Inspection Plan for North Anna Power Station, Units 1 and 2 (Report 05000338/2024005 and 05000339/2024005) 05000339/LER-2024-001-01, Loss of Generator Field for 2J Eog During 2-PT-82.282024-08-20020 August 2024 Loss of Generator Field for 2J Eog During 2-PT-82.28 ML24234A0742024-08-15015 August 2024 Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Letter OG-23-63, NEI 03-08 Needed Guidance: PWR Thermal Shield Flexure Inspection Requirements ML24221A1932024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Upper Mattaponi Tribe ML24221A1882024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Monacan Indian Nation ML24206A0052024-08-0808 August 2024 SLR Final EIS Letter to Achp ML24221A1842024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Delaware Nation, Oklahoma ML24221A1912024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Rappahannock Tribe, Inc ML24221A1942024-08-0808 August 2024 Tribal Section 106 Letters-North Anna-United Keetoowah Band of Cherokee Indians in Oklahoma ML24221A1922024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Tuscarora Nation of New York ML24221A1852024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Delaware Tribe of Indians ML24221A1832024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Chickahominy Indian Tribe-Eastern Division ML24206A0062024-08-0808 August 2024 Notice of Availability of the Final Environmental Impact Statement for the North Anna Nuclear Power Station Unit Numbers 1 and 2 Subsequent License Renewal (Docket Numbers: 50-338 and 50-339) ML24163A3002024-08-0808 August 2024 Request for Relief Request N1-I5-NDE-007 Inservice Inspection Alternative ML24208A0142024-08-0808 August 2024 Tribal Section 106 Letters-North Anna-Absentee-Shawnee Tribe of Indians of Oklahoma ML24221A1872024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Eastern Shawnee Tribe of Oklahoma ML24221A1862024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Eastern Band of Cherokee Indians ML24221A1812024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Catawba Indian Nation ML24221A1822024-08-0808 August 2024 Tribal Section 106 Letters - North Anna - Chickahominy Indian Tribe ML24221A1902024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Pamunkey Indian Tribe ML24221A1892024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Nansemond Indian Nation ML24241A0692024-08-0606 August 2024 ISFSI, Submittal of Cask Registration for Spent Fuel Storage IR 05000338/20240022024-08-0202 August 2024 Integrated Inspection Report 05000338/2024002 and 05000339/2024002 ML24206A0432024-07-26026 July 2024 Feis - Letter to the Applicant 05000338/LER-2024-001, Automatic Reactor Trip Due to Prni High Negative Rate2024-07-25025 July 2024 Automatic Reactor Trip Due to Prni High Negative Rate ML24206A0902024-07-24024 July 2024 Owners Activity Report ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24143A1622024-06-12012 June 2024 – Correction to Issuance of Amendment Nos. 297 and 280 and Surry Units 1 and 2, Correction to Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML24165A1462024-06-0505 June 2024 Loss of Generator Field for 2J EDG During 2-PT-82.28 05000339/LER-2024-001, Loss of Generator Field for 2J EDG During 2-PT-82.282024-06-0505 June 2024 Loss of Generator Field for 2J EDG During 2-PT-82.28 IR 05000338/20240012024-05-10010 May 2024 Integrated Inspection Report 05000338/2024001 and 05000339/2024001 IR 05000338/20244032024-04-30030 April 2024 – Security Baseline Inspection Report 05000338-2024403 and 05000339-2024403 ML24054A0142024-04-22022 April 2024 Issuance of Amendment Nos. 297 and 280, and Surry Power Station Unit Nos. 1 and 2, Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24110A1502024-04-18018 April 2024 Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report ML24110A1392024-04-18018 April 2024 Annual Environmental Operating Report ML24110A1462024-04-18018 April 2024 Independent Spent Fuel Storage Installation (Sfsi) - Annual Radiological Environmental Operating Report ML24087A0572024-04-16016 April 2024 Correction to Issuance of Amendment Nos. 296 and 279 ML24088A2692024-03-27027 March 2024 Core Operating Limits Report Cycle 31 Pattern Sos Revision 0 2024-09-24
[Table view] |
Text
Eric S. Carr, President - Nuclear Operations and Chief Nuclear Officer Innsbrook Technical Center 5000 Dominion Boulevard P.O. Box 1002 Glen Allen, VA 23060-6711
SUBJECT:
NOTICE OF AVAILABILITY OF THE FINAL SITE-SPECIFIC, ENVIRONMENTAL IMPACT STATEMENT FOR SUBSEQUENT LICENSE RENEWAL OF NORTH ANNA POWER STATION, UNITS 1 AND 2 (EPID NUMBER: L-2020-SLE-0000)
(DOCKET NUMBERS: 50-338 AND 50-339)
Dear Eric S. Carr:
The U.S. Nuclear Regulatory Commission (NRC) staff has completed the final site-specific Environmental Impact Statement (EIS) (Supplement 7a, Second Renewal, to NUREG-1437) for subsequent license renewal of renewed Facility Operating License Nos. NPF-4 and NPF-7 for an additional 20 yea rs of operation for North Anna Powe r Station, Units 1 and 2, respectively (NAPS). The NRC staff has prepared a Federal Register (FR) Notice of Availability (NOA)
(Agencywide Documents Access and Management System (ADAMS) (ML24208A020) to advise the public that the site-specific EIS is publicly available from ADAMS. The final site-specific EIS is ML24204A104. ADAMS is accessible from the NRC website at https://www.nrc.gov/reading-rm/adams.html/.
As discussed in Chapter 4 of the plant-specific EIS, the NRC staffs recommendation is that the environmental impacts of subsequent license renewal for NAPS are reasonable for the license renewal action, preserving the option of license renewal for energ y plannin g. This recommendation is based on: (1) the Dominio n Environmental R eport; (2 ) the NRC staffs consultation with Federal, State, local, and Tribal government agencies; (3) the NRC staff's independent environmental review; and (4) the NRC staff's consideration of public comments.
A separate NOA of the final supplemental EIS was placed in the FR through the U.S.
Environmental Protection Agen cy (EPA) and published on July 26, 2024. The 30-day public review period end d ate is calculated from the date on which the EPA notice is published in the FR and it is scheduled for August 26, 2024.July 26, 2024 E. Carr 2 Should you have any questions concerning the staffs environmental review of this license renewal application, please contact the Project Manager, Tam Tran at 301-415-3617 or via email at Tam.Tran@nrc.gov.
Sincerely, John M. Moses, Deputy Director Division of Rulemaking, Environmental, and Financial Support Office of Nuclear Material Safety and Safeguards Docket Nos. 50-338 and 50-339 Signed by Moses, John on 07/26/24 E. Carr 3
SUBJECT:
NOTICE OF AVAILABILITY OF THE FINAL SITE-SPECIFIC, ENVIRONMENTAL IMPACT STATEMENT FOR SUBSEQUENT LICENSE RENEWAL OF NORTH ANNA POWERSTATION, UNITS 1 AND 2 (EPID NUMBER L-2020-SLE-0000)
(DOCKET NUMBERS: 50-338 AND 50-339)
DATED:
DISTRIBUTION:
PUBLIC RidsNrrDnrl Resource RidsNrrPMNorth Anna Resource LGibson, NRR/DNRL SLingam, NRR/DNRL EMiller, NRR/DORL MMcCoppin, OEDO SBurnell, HQ/OPA DMcIntyre, HQ/OPA LWilkins, OCA DGasperson, RII/OPA JPelchat, RII/ORA BDesai, RII/DRS KCarrington, RII/DRP MThomas, RII/DRP MTobin, RII/DRP PCooper, RII/DRS SDowney, RII/DRS JDozier, NRR/DRA Keith.j.miller@dominionenergy.com Kathryn.h.barret@dominionenergy.com ADAMS Accession No: ML24206A043 (LTR) *via email OFFICE NMSS/REFS NMSS/REFS NMSS/REFS NAME TTran AWalker-Smith SKoenick DATE 07/25/2024 7/26/2024 07/26/2024 OFFICEOGC/NLO on FSEIS/FRN*NMSS/REFS FSEIS/LTR/FRN:DD NAME STurk JMoses DATE 07/25/2024 7/26/2024 OFFICAL RECORD ONLYJuly 26, 2024