Letter Sequence Acceptance Review |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance
- Supplement
|
MONTHYEARLR-N20-0010, License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology2020-04-24024 April 2020 License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology Project stage: Request ML20302A2012020-10-22022 October 2020 NRR E-mail Capture - Surry Power Station, Units 1 and 2 - Acceptance Review (L-2020-LLA-0219) Project stage: Acceptance Review ML20296A6232020-10-22022 October 2020 Request for NRC Approval to Apply Leak-Before-Break Methodology to Reactor Coolant System Branch Piping Project stage: Request ML20338A5422020-12-0303 December 2020 Proposed License Amendment Request, Update of the Loss of Coolant Accident Alternate Source Term Dose Analysis Project stage: Request ML20346A1032020-12-11011 December 2020 NRR E-mail Capture - Surry Power Station, Units 1 and 2 LBB LAR - Acceptance Review (L-2020-LLA-0255) Project stage: Acceptance Review ML20364A0172020-12-28028 December 2020 NRR E-mail Capture - Surry Power Station, Units 1 and 2 AST LAR - Acceptance Review (L-2020-LLA-0258) Project stage: Acceptance Review ML21084A2732021-03-24024 March 2021 License Amendment Request - Application of Leak-Before-Break Methodology to Reactor Coolant System Branch Piping - Response to Request for Additional Information and Clarification Project stage: Response to RAI ML21127A1362021-05-13013 May 2021 May 13, 2021 NRC Pre-Submittal Meeting - Surry Power Station New Fuel Storage and Spent Fuel Pool Criticality Analysis Proposed License Amendment Request Project stage: Meeting ML21133A4212021-05-13013 May 2021 Response to NRC Request for Additional Information Regarding Proposed License Amendment Request Update of LOCA Alternative Source Term Dose Analysis Project stage: Response to RAI ML21270A0232021-07-0707 July 2021 State of Virginia Notification of Pending Amendment Issuance Ref: Surry Power Station, Units 1 and 2 - Request to Revise Technical Specifications 2.1.A.1.b Project stage: Other ML21175A1852021-08-20020 August 2021 Issuance of Amendment Nos. 304 and 304 Leak-Before-Break for Pressurizer Surge, Residual Heat Removal, Safety Injection Accumulator, Reactor Coolant System Bypass and Safety Injection Lines Project stage: Approval ML21272A0622021-09-28028 September 2021 NRR E-mail Capture - (External_Sender) Surry Fuel Melt Safety Limit (SL) LAR Question Project stage: Other ML21277A0652021-09-30030 September 2021 Proposed License Amendment Request Removal of Refueling Water Chemical Addition Tank and Replacement of Containment Sump Buffer Project stage: Request ML21286A7372021-10-13013 October 2021 Additional Element Included in the Implementation Plan for the Surry Fuel Melt Safety Limit (SL) LAR Project stage: Request ML21292A3022021-10-19019 October 2021 Response to Question on License Amendment Request to Revise Reactor Core Safety Limit Project stage: Request ML21294A3382021-10-21021 October 2021 Proposed Amendment to Relocate Unit Staff Qualification Requirements from Technical Specifications to Nuclear Facility Quality . Project stage: Request ML21188A1742021-10-26026 October 2021 Issuance of Amendment Nos. 305 and 305 Revised Reactor Core Safety Limit to Reflect Topical Report WCAP-177642-P-A, Revision 1 Project stage: Approval ML21307A4302021-11-0909 November 2021 Supplemental Information Needed for Acceptance of Requested Licensing Action Surry Post LOCA Buffer Change Project stage: Acceptance Review ML21253A0632021-11-19019 November 2021 Issuance of Amendment Nos. 306 and 306 to Update of the Loss of Coolant Accident Alternate Source Term Dose Analysis Project stage: Approval ML21326A1502021-11-22022 November 2021 NRR E-mail Capture - Acceptance Review for Relocation of Unit Staff Requirements to the QAPD LAR (L-2021-LLA-0195) Project stage: Acceptance Review ML21334A1692021-11-29029 November 2021 Proposed License Amendment Request Removal of Refueling Water Chemical Additional Tank and Replacement of Containment Buffer Supplemental Information Project stage: Supplement ML21340A1642021-12-0606 December 2021 Acceptance of Requested Licensing Action Amendment Project stage: Acceptance Review ML22004A2872022-01-14014 January 2022 Technical Specification Section 3.4.A.4 Change of Post Loss-of-Coolant Accident Chemical Buffer Audit Plan Project stage: Other ML22077A0542022-03-18018 March 2022 Change in Engineering Hours Estimate Surry Ph Buffer LAR Acceptance Project stage: Approval ML22089A0092022-04-13013 April 2022 Regulatory Audit Summary Related to the License Amendment Request to Change Loss-Of-Coolant Accident Chemical Buffer Project stage: Other ML22153A1352022-06-0202 June 2022 Proposed License Amendment Request (LAR) - Removal of Refueling Water Chemical Addition Tank and Replacement of Containment Sump Buffer - Response to Request for Additional Information Project stage: Response to RAI ML22164A8532022-06-13013 June 2022 Proposed License Amendment Request Removal of Refueling Water Chemical Addition Tank and Replacement of Containment Sump Buffer - Response to Request for Confirmation Project stage: Request ML22164A9252022-06-13013 June 2022 Page Substitutions to ADAMS Accession Number ML21294A338 Project stage: Request ML22095A1072022-07-11011 July 2022 Issuance of Amendment Nos. 120, 344, & 284, 293 & 276, & 307 & 307 to Relocate Requirements to the QAPD Project stage: Approval ML22193A2952022-08-26026 August 2022 Issuance of Amendment Nos. 308 and 308 License Amendment Request for Removal of the Refueling Water Chemical Addition Tank and Containment Sump, Ph Buffer Change and Safety Evaluation Project stage: Approval ML22250A6672022-10-12012 October 2022 Correction to Issuance of Amendment Nos. 304 (EPID L-2020-LLA-0255), 305 (EPID L-2020-LLA-0219) 306 (EPID L-2020-LLA-0258), 307 (EPID L-2021-LLA-0195) and 308 Project stage: Approval 2021-12-06
[Table View] |
Text
From:
Miller, Ed Sent:
Monday, November 22, 2021 12:46 PM To:
Erica.N.Combs@dominionenergy.com
Subject:
Acceptance Review for Relocation of Unit Staff Requirements to the QAPD LAR (L-2021-LLA-0195)
- Erica, By letter dated October 21, 2021 (Agencywide Documents Access and Management System Package Accession No. ML21294A338), Dominion Energy, submitted a license amendment request for North Anna Power Station Units 1 and 2, Surry Power Station Units 1 and 2, and Millstone Power Station Units 1, 2, and 3. The proposed amendment would relocate requirements for Unit Staff to the QAPD. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to begin its detailed technical review. The acceptance review is also intended to identify whether the request has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an application for an amendment to a license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design feature, and principal safety considerations.
The NRC staff has reviewed your request and concluded that it does provide technical information in sufficient detail to enable the NRC staff to begin its detailed technical review and make an independent assessment regarding the acceptability of the proposed request in terms of regulatory requirements and the protection of public health and safety and the environment.
Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified in requests for additional information despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.
Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 135 hours0.00156 days <br />0.0375 hours <br />2.232143e-4 weeks <br />5.13675e-5 months <br /> to complete. The NRC staff expects to complete this review by December 1, 2022. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.
These estimates are based on the NRC staffs initial review of the application and they can change due to several factors including requests for additional information, unanticipated addition of scope to the review, review by NRC advisory committees, or hearing-related activities.
If you have any questions, please contact me at (301) 415-2481 or ed.miller@nrc.gov.
Ed Miller (301) 415-2481
Hearing Identifier:
NRR_DRMA Email Number:
1427 Mail Envelope Properties (SA1PR09MB7487F9FB1D970080A3D8E54BE99F9)
Subject:
Acceptance Review for Relocation of Unit Staff Requirements to the QAPD LAR (L-2021-LLA-0195)
Sent Date:
11/22/2021 12:45:48 PM Received Date:
11/22/2021 12:45:00 PM From:
Miller, Ed Created By:
Ed.Miller@nrc.gov Recipients:
"Erica.N.Combs@dominionenergy.com" <Erica.N.Combs@dominionenergy.com>
Tracking Status: None Post Office:
SA1PR09MB7487.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3369 11/22/2021 12:45:00 PM Options Priority:
Normal Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date: