From:

Ed Miller Sent:

Thursday, August 31, 2023 1:54 PM To:

Shayan.Sinha@dominionenergy.com

Subject:

Draft RAIs for EP Staff Augmentation Times LAR (L-2022-LLA-0166)

Attachments:

Dominion EP Staffing LAR Second Round RAI.docx Mr. Sinha, Attached is the NRC staffs draft RAI for the subject request. The questions are being transmitted to you to determine 1) If the questions clearly convey the NRC information needs, 2)

Whether the regulatory basis for the questions are clear, and 3) If the information has already been provided in existing docketed correspondence. Additionally, review of the draft question will allow you to determine what response time you can support. After youve had a chance to review, please let me know if you would like to have a clarification call or public meeting to discuss. Thank you.

Ed Miller (301) 415-2481

Hearing Identifier:

NRR_DRMA Email Number:

2217 Mail Envelope Properties (CO6PR09MB7480DE9E89A05C4206AC32D7E9E5A)

Subject:

Draft RAIs for EP Staff Augmentation Times LAR (L-2022-LLA-0166)

Sent Date:

8/31/2023 1:53:45 PM Received Date:

8/31/2023 1:53:00 PM From:

Ed Miller Created By:

Ed.Miller@nrc.gov Recipients:

"Shayan.Sinha@dominionenergy.com" <Shayan.Sinha@dominionenergy.com>

Tracking Status: None Post Office:

CO6PR09MB7480.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 639 8/31/2023 1:53:00 PM Dominion EP Staffing LAR Second Round RAI.docx 49895 Options Priority:

Normal Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

DRAFT REQUEST FOR ADDITIONAL INFORMATION (RAI)

LICENSE AMENDMENT REQUEST TO REVISE THE EMERGENCY PLANS DOMINION GENERATION NORTH ANNA POWER STATION, UNITS 1 AND 2 SURRY POWER STATION, UNITS 1 AND 2 DOCKET NOS. 50-338, 50-339, 50-424, AND 50-425 By application dated November 7, 2022 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML22312A550), Virginia Electric and Power Company (Dominion) submitted a license amendment request (LAR) for Commission review and approval of the North Anna Power Station, Units 1 and 2 (NAPS), and the Surry Power Station, Units 1 and 2 (SPS), Emergency Plans. The licensees LAR proposes changes to the NAPS and SPS Emergency Plans pursuant to Section 50.54(q) of Title 10 of the Code of Federal Regulations (10 CFR).

By letter dated March 30, 2023 (Adams Accession No. ML23089A354), Dominion provided a response to an NRC staff RAI. The following RAIs are informed by Dominions response to the first round of RAIs and a subsequent audit (ADAMS Accession No. ML23198A032).

RAI-1

The Dominion response to round 1 RAI-1 indicates the proposed changes would not have 2 SROs available to perform the EP command-and-control function as indicated on Table 5-1 of the North Anna and Surry emergency plans.

Because the response to RAI-1 indicates that Dominion may not have any SROs available to perform the command-and-control function, RAI-1 is clarified as follows:

Second Round RAI-1: Provide clarification indicating how the Shift Manager will be relieved of either the Shift Manager or Emergency Director function within 60 minutes of an alert or higher emergency classification.

RAI-2

The Dominion response to round 1 RAI-2 indicates that one of the three on-shift radiation protection (RP) technicians would be dedicated to dose assessment following an alert or higher classification. The Dominion audit provided additional perspective on Dominion RP capabilities that were not specifically provided in the Dominion response to RAI-3(b). Because some Dominion RP capabilities were not apparent in previous information provided by Dominion, provide the following:

Second Round RAI-2(a): Provide a description of Dominion remote radiation monitoring RP oversight capabilities that includes the following elements:

Second Round RAI-2(b): Provide a description of the monitoring capability for the RP individual providing oversight that includes the following:

RAI-3

Round 1 RAI-6 was written to obtain justification for the extension in timing for maintenance personnel. round 1 RAI-6 was seeking information that could be used to justify the proposed extension in maintenance resource augmentation times. Although Dominion provided additional detail related to FLEX, this detail was limited to high level comments. Because of the Dominion response to round 1 RAI-6 and a subsequent walkdown of Surry FLEX equipment, the following second round RAI-3 is as follows:

Second Round RAI-3: Provide clarification indicating that a mechanic and electrician will provide maintenance support within 60 minutes of an alert or higher emergency classification or revise accordingly.