ML23060A093

From kanterella
Jump to navigation Jump to search
NRR E-mail Capture - Formal Issuance of RAIs for Surry/North Anna Emergency Plans LAR
ML23060A093
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 03/01/2023
From: Ed Miller
Plant Licensing Branch II
To: Sinha S
Virginia Electric & Power Co (VEPCO)
References
Download: ML23060A093 (8)


Text

From: Ed Miller Sent: Wednesday, March 1, 2023 10:31 AM To: Shayan.Sinha@dominionenergy.com

Subject:

Formal Issuance of RAIs for Surry/North Anna EP LAR Attachments: North Anna and Surry 2022 ERO Staffing RAIs.docx

Shayan, By letter dated November 7, 2022 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML22312A550) Virginia Electric and Power Company submitted to the U.S. Nuclear Regulatory Commission (NRC), a proposed amendment to the license for Surry Power Station (SPS), Units 1 and 2 and North Anna Power Station, Units 1 and 2 regarding a revision to the emergency plans.

The NRC staff has reviewed the information submitted and needs additional information to complete its review and approval of the licensees submittal. These requests for additional (RAIs) are attached to this email and are released formally with a 30-day response period (March 31, 2023) requested.

Ed Miller (301) 415-2481

Hearing Identifier: NRR_DRMA Email Number: 1968 Mail Envelope Properties (SA1PR09MB7487C53A2A12EE9C673FD2F4E9AD9)

Subject:

Formal Issuance of RAIs for SurryNorth Anna EP LAR Sent Date: 3/1/2023 10:30:35 AM Received Date: 3/1/2023 10:30:00 AM From: Ed Miller Created By: Ed.Miller@nrc.gov Recipients:

"Shayan.Sinha@dominionenergy.com" <Shayan.Sinha@dominionenergy.com>

Tracking Status: None Post Office: SA1PR09MB7487.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 735 3/1/2023 10:30:00 AM North Anna and Surry 2022 ERO Staffing RAIs.docx 62116 Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

REQUEST FOR ADDITIONAL INFORMATION LICENSE AMENDMENT REQUEST TO REVISE THE EMERGENCY PLANS DOMINION GENERATION NORTH ANNA POWER STATION, UNITS 1 AND 2 SURRY POWER STATION, UNITS 1 AND 2 DOCKET NOS. 50-338, 50-339, 50-424, AND 50-425 By application dated November 7, 2022 (Agencywide Documents Access and Management System Accession No. ML22312A550), Virginia Electric and Power Company (Dominion Energy Virginia or the licensee) submitted a license amendment request (LAR) for Commission review and approval of the North Anna Power Station, Units 1 and 2 (NAPS), and the Surry Power Station, Units 1 and 2 (SPS), Emergency Plans. The licensees LAR proposes changes to the NAPS and SPS Emergency Plans pursuant to Section 50.54(q) of Title 10 of the Code of Federal Regulations (10 CFR).

The following additional information is needed for the NRC to complete its review.

RAI-1 (a and b)

Issue 1.a: As stated in Section 3.2.2.C, Emergency Direction and Control (Command and Control, Emergency Classification) of Enclosure 1, North Anna Power Station, Units 1 and 2:

Discussion and Assessment of Proposed Changes, and Enclosure 2, Surry Power Station, Units 1 and 2: Discussion and Assessment of Proposed Changes, states in part, On-shift staffing for Senior Reactor Operators (SROs) includes a third SRO who is SM [Shift Manager]/SEM [Station Emergency Manager] qualified. This individual is not included in the 10 CFR 50.54(m)(2)(i) requirement and is a resource continuously available for oversight and direction of emergency response.

This statement is consistent with Table 5.1, Minimum Staffing Requirements for Emergencies, of the emergency plans for North Anna and Surry which indicate that two Unit Shift Supervisors will be available to provide oversight and an additional Shift Manager will be available to perform classification. In its application, Dominion Energy Virginia is proposing to have three individuals qualified as shift manager/station emergency manager on shift. This does not appear to be consistent with Section 5.0, Organizational Control of Emergencies, of each sites respective Emergency Plan which states, the Shift Manager or Unit Supervisor initially acts in the capacity of the Station Emergency Manager (SEM) and takes actions as outlined in the EPIPS

[emergency plan implementation procedures]. The guidance of NUREG-0654 Table B-1, Emergency Response Organization (ERO) Staffing and Augmentation Plan, states that there should be one Operations Shift Manager who provides overall ERO command and control and emergency action level (EAL) classification.

RAI-1.a: Provide a description of the specific ERO responsibilities for each of the SROs included on Table 5.1 of the North Anna and Surry emergency plans. In your description, describe who provides overall ERO command and control and EAL classification.

RAI-2

RAI-3 (a, b, c, and d)

RAI-4 (a, b, and c)

RAI-5

RAI-6 (a, b, c, and d)

NUREG-0737 identified the need to consider the following events involving multiple failures: