Letter Sequence RAI |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, ... further results|Request]]
- Acceptance...
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
- Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval
Other: ML20246G698, ML20258A284, ML20269A465, ML20274A111, ML20274A198, ML20276A192, ML20303A199, ML20307A177, ML20322A052, ML20337A022, ML20351A388, ML21025A340, ML21036A060, ML21067A504, ML21067A507, ML21084A182, ML21091A004, ML21097A027, ML21145A217, ML21181A186, ML21217A187, ML21239A064, ML21239A066, ML21239A068, ML21256A067, ML21256A069, ML21312A002, ML21312A003, ML21312A007, ML23062A466, ML24206A043, PMNS20211071, Discussion Between NRC and Dominion Regarding the North Anna Subsequent License Renewal - Safety Issue - Cyclic Fatigue, PMNS20211128, Discussion Between NRC and Dominion Regarding the North Anna Subsequent License Renewal - an Inconsistency in Documentation Regarding Reactor Coolant Pump Code Case N 481, TLAA 4.7.6
|
MONTHYEARML20246G6982020-08-24024 August 2020 Appendix E: Applicants Environmental Report Subsequent Operating License Renewal Stage North Anna Power Station Units 1 and 2 Project stage: Other ML20246G6972020-08-24024 August 2020 Application for Subsequent Renewed Operating Licenses Project stage: Request ML20269A4652020-10-0606 October 2020 SLRA - Portal Letter Project stage: Other ML20276A1922020-10-0909 October 2020 Subsequent License Renewal Aging Management Audit Plan Project stage: Other ML20258A2842020-10-13013 October 2020 SLRA - Acceptance and Opportunity for Hearing Letter Project stage: Other ML20274A1112020-10-19019 October 2020 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process (EPID No. L-2020-SLE-0000) - Letter to Applicant Project stage: Other ML20274A1982020-10-19019 October 2020 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process (EPID No. L-2020-SLE-0000) - Federal Register Notice Project stage: Other PMNS20201188, Environmental Scoping Meeting Related to the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application2020-10-28028 October 2020 Environmental Scoping Meeting Related to the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application Project stage: Meeting ML20303A1992020-10-29029 October 2020 Subsequent License Renewal Safety Project Management Assignment Project stage: Other ML20307A1772020-11-0404 November 2020 NRC Presentation North Anna Power Station, Units 1 and 2 Subsequent License Renewal Review Project stage: Other ML20317A2062020-11-12012 November 2020 Environmental Scoping Meeting Related to the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application Project stage: Meeting ML20324A6792020-11-13013 November 2020 Comment (1) of Kevin Quigley on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20324A6832020-11-13013 November 2020 Comment (5) from Joseph Sucha on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20324A6822020-11-13013 November 2020 Comment (4) from Keith Scott on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20324A6812020-11-13013 November 2020 Comment (3) from Frederick Gerloff on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20324A6802020-11-13013 November 2020 Comment (2) from Luther Jones on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0512020-11-14014 November 2020 Comment (8) of Lisa Hicks-Thomas on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Units 1 and 2 Project stage: Request ML20324A6862020-11-14014 November 2020 Comment (7) from Nancy Ashberry on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20324A6852020-11-14014 November 2020 Comment (6) from Thomas Owens on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0532020-11-15015 November 2020 Comment (9) of Martin Blough on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0582020-11-16016 November 2020 Comment (12) from Melissa Haley on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0572020-11-16016 November 2020 Comment (11) of Lauren Lopez on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Units 1 and 2 Project stage: Request ML20325A0542020-11-16016 November 2020 Comment (10) of Michael Hamby on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0602020-11-17017 November 2020 Comment (13) of Terry Clouthier on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20329A4392020-11-17017 November 2020 Pamunkey Consultation Request_North Anna Power Station_17NOV20 Project stage: Request ML20325A0662020-11-18018 November 2020 Comment (18) from Jim Norvelle on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0612020-11-18018 November 2020 Comment (14) of Kevin Cordray on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0622020-11-18018 November 2020 Comment (15) from Jason Evans on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0632020-11-18018 November 2020 Comment (16) of Tracy Gill on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0652020-11-18018 November 2020 Comment (17) of Tommy Flynn on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1012020-11-18018 November 2020 Comment (28) from Ralph Joyce on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0682020-11-18018 November 2020 Comment (19) of Ronald Buchanan on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0712020-11-18018 November 2020 Comment (20) of Harold Vaughan on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0722020-11-18018 November 2020 Comment (21) of Mel Holley on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0732020-11-18018 November 2020 Comment (22) of Sarah Marshall on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0742020-11-18018 November 2020 Comment (23) of Andrew Moncol on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0752020-11-18018 November 2020 Comment (24) of Richard Zuercher on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Units 1 and 2 Project stage: Request ML20325A0922020-11-18018 November 2020 Comment (25) of J. Crouch on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0942020-11-18018 November 2020 Comment (26) from J. Crouch on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0972020-11-18018 November 2020 Comment (27) from Jenna Brown on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1132020-11-18018 November 2020 Comment (37) of Shawn Williams on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Units 1 and 2 Project stage: Request ML20325A1242020-11-18018 November 2020 Comment (42) of Edmond Longest on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1172020-11-18018 November 2020 Comment (39) from Carl Aimee Newcomb of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1152020-11-18018 November 2020 Comment (38) of Eric Hendrixson on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1042020-11-18018 November 2020 Comment (30) of David Strole on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1112020-11-18018 November 2020 Comment (35) of Greg Boutchyard on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1052020-11-18018 November 2020 Comment (31) from Carl Eng on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1072020-11-18018 November 2020 Comment (32) of Angela Baker on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1102020-11-18018 November 2020 Comment (34) of Terrance Perrone on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1122020-11-18018 November 2020 Comment (36) from Robert George on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request 2020-11-13
[Table View] |
|
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24283A1442024-10-16016 October 2024 Main Steam Line Break Accident Analysis LAR Pre-Application Meeting ML24247A0042024-09-0303 September 2024 SLR Efficiencies Public Meeting - NRC Presentation - September 5, 2024 ML24108A0712024-04-30030 April 2024 Combined - 2023 Annual Assessment Public Meeting Slides ML24029A2362024-01-30030 January 2024 Preliminary Results of the Environmental Review, Subsequent License Renewal ML23338A1522023-12-0707 December 2023 Public Meeting Slides for North Anna and Surry Emergency Plan Augmentation Times License Amendment Request ML23255A0992023-09-15015 September 2023 Slides for September 15, 2023 Public Meeting on Poanhi Seismic Evaluations ML23103A3482023-04-14014 April 2023 Annual Assessment Meeting Presentation for North Anna and Surry ML21221A0332022-06-17017 June 2022 Meeting Summary: Discussion of Dominions Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - NRC Slides ML21174A3042021-06-23023 June 2021 SLRA RAI Response Public Meeting - 21-06-24 ML21221A1542021-05-27027 May 2021 Meeting Summary: Discussion of Dominions Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Dominion Slides ML21145A2172021-05-13013 May 2021 Discussion on May 13, 2021 with Dominion on Select Staff RAIs on North Anna Subsequent License Renewal Application - Dominion Slides ML21132A2892021-05-13013 May 2021 SLRA RAI Response Public Meeting ML21034A5972021-02-10010 February 2021 External Presentation Am Atkinson_Nrc ISG-06 Meeting Dominion Digital IC Project 02102021 ML20288A3472020-10-14014 October 2020 (COVID-19) Emergency Preparedness Exemption Pre-Application Meeting ML20099F2992020-04-0909 April 2020 NRC Slides for North Anna pre-app April 9 ML20099F2412020-04-0909 April 2020 Co., NRC Safety Pre& 8208;Application Meeting North Anna Power Station (NAPS) ML20098B6022020-04-0707 April 2020 Annual Assessment Meeting Presentation ML19297D1872019-11-18018 November 2019 Pre-Application Meeting - Dominion Slides ML18320A2502018-11-20020 November 2018 50.90 License Amendment Request - Dominion Fleet EAL Scheme Changes, November 20, 2018 Public Meeting ML18141A3072018-05-21021 May 2018 18 - SLR Status ML17123A2092017-05-0303 May 2017 Summary of Meeting to Discuss Annual Assessment of the North Anna Power Station, Units 1 and 2 with the Public for the Period of January 1, 2016 Through December 31, 2016 ML16124A7582016-05-0303 May 2016 April 14, 2016, Summer of Public Meeting - North Anna, Units 1 and 2 ML16124A7632016-05-0303 May 2016 April 14, 2016, Summary of Public Meeting - North Anna Power Station, Units 1 and 2 ML16104A3822016-04-26026 April 2016 New Fuel Storage Rack & SFP Criticality Analysis for April 26th 2016 Scheduled Category 1, Pre-Submittal Public Teleconference ML16104A3872016-04-13013 April 2016 Criticality Analysis Checklist for North Anna ML15273A4292015-09-29029 September 2015 Revised Slides for September 29, 2015 Meeting with Dominion Re North Anna ISFSI License Renewal ML15153A0452015-05-13013 May 2015 Revised North Anna ISFSI Presentation Slides - TN-32 High Burnup Dry Storage Research Project, May 13, 2015 (Tom Brookmire) ML15133A0822015-05-13013 May 2015 ISFSI Presentation Slides - TN-32 High Burnup Dry Storage Research Project, May 13, 2015 (Tom Brookmire) ML15128A5462015-05-0808 May 2015 Summary of Public Meeting with North Anna, Units 1 and 2 to Discuss the Annual Assessment with the Public ML14101A1202014-04-11011 April 2014 Public Meeting Summary - North Anna Power Station, Docket Nos. 50-338, 50-339 ML14058B1762014-03-0606 March 2014 Presentation Slides - North Anna ISFSI - High Burnup Dry Storage Confirmatory Data Project, TN-32 Storage Cask, Tom Brookmire, March 6, 2014, Docket No. 72-16, TAC No: L24886 ML14071A1672014-01-28028 January 2014 Enclosure 2: Presentation Slides - North Anna ISFSI TN-32 Cask and Pad 1 Assessments Following August 23, 2011, Central Virginia Earthquake ML13159A0092013-06-0404 June 2013 Notable Failures in Nondustructive Testing - June 4, 2013 Public Meeting ML12257A2342012-09-11011 September 2012 5-Hacker - North Anna Mockup and Search Unit Action Presentation Sept 10 ML12257A2002012-09-11011 September 2012 2-North Anna Extent of Condition Presentation 9-7-12 Sept 10 ML12131A5052012-05-0909 May 2012 Presentation for 2011 North Anna EOC Annual Assessment Meeting ML11305A0452011-11-0101 November 2011 Region II - North Anna Public Meeting Slides ML11305A0622011-11-0101 November 2011 Restart Readiness, Public Meeting PR2 ML11276A0242011-10-0303 October 2011 Slides-North Anna AIT Public Meeting October 3, 2011 ML1127701352011-10-0303 October 2011 Ltr to D. Heacock Re Participation in the Commission Meeting on the North Anna Plant on 10/21/11 ML11252A0062011-09-0808 September 2011 Dominion'S Slides Earthquake Response and North Anna Restart Readiness Demonstration Plan ML1124205512011-08-30030 August 2011 Seismic Event ML1110304942011-04-13013 April 2011 Public Meeting Attendees ML1110304982011-04-13013 April 2011 Public Meeting Handouts ML1032204442010-11-18018 November 2010 Public Meeting Summary - North Anna Power Station ML1020100212010-07-14014 July 2010 Nucler Power Station, Units 1 and 2, Westinghouse RFA-2 Fuel Transition Licensing Meeting Presentation Slides ML1012600332010-05-0505 May 2010 Meeting Posters ML1012600342010-05-0505 May 2010 Public Mtg. Slides ML0917610472009-08-0505 August 2009 ECCS Preacs Filtration Presentation ML0911000392009-04-17017 April 2009 Notice of Public Meeting Category 1 - Annual Assessment of North Anna Power Station 2024-09-03
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24283A1442024-10-16016 October 2024 Main Steam Line Break Accident Analysis LAR Pre-Application Meeting ML24247A0042024-09-0303 September 2024 SLR Efficiencies Public Meeting - NRC Presentation - September 5, 2024 ML24108A0712024-04-30030 April 2024 Combined - 2023 Annual Assessment Public Meeting Slides ML24029A2362024-01-30030 January 2024 Preliminary Results of the Environmental Review, Subsequent License Renewal ML23338A1522023-12-0707 December 2023 Public Meeting Slides for North Anna and Surry Emergency Plan Augmentation Times License Amendment Request ML23255A0992023-09-15015 September 2023 Slides for September 15, 2023 Public Meeting on Poanhi Seismic Evaluations ML23103A3482023-04-14014 April 2023 Annual Assessment Meeting Presentation for North Anna and Surry ML21221A0332022-06-17017 June 2022 Meeting Summary: Discussion of Dominions Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - NRC Slides ML22091A0902022-04-0101 April 2022 Combined 2021 Assessment Meeting Slides ML21221A1482021-05-27027 May 2021 Meeting Summary: Discussion of Dominions Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - NRC Slides ML21221A1542021-05-27027 May 2021 Meeting Summary: Discussion of Dominions Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Dominion Slides ML21132A2892021-05-13013 May 2021 SLRA RAI Response Public Meeting ML21145A2172021-05-13013 May 2021 Discussion on May 13, 2021 with Dominion on Select Staff RAIs on North Anna Subsequent License Renewal Application - Dominion Slides ML21034A5972021-02-10010 February 2021 External Presentation Am Atkinson_Nrc ISG-06 Meeting Dominion Digital IC Project 02102021 ML20288A3472020-10-14014 October 2020 (COVID-19) Emergency Preparedness Exemption Pre-Application Meeting ML20099F2412020-04-0909 April 2020 Co., NRC Safety Pre& 8208;Application Meeting North Anna Power Station (NAPS) ML20099F2992020-04-0909 April 2020 NRC Slides for North Anna pre-app April 9 ML20098B6022020-04-0707 April 2020 Annual Assessment Meeting Presentation ML19297D1872019-11-18018 November 2019 Pre-Application Meeting - Dominion Slides ML18141A3072018-05-21021 May 2018 18 - SLR Status ML16124A7582016-05-0303 May 2016 April 14, 2016, Summer of Public Meeting - North Anna, Units 1 and 2 ML16124A7632016-05-0303 May 2016 April 14, 2016, Summary of Public Meeting - North Anna Power Station, Units 1 and 2 ML15273A4292015-09-29029 September 2015 Revised Slides for September 29, 2015 Meeting with Dominion Re North Anna ISFSI License Renewal ML15153A0452015-05-13013 May 2015 Revised North Anna ISFSI Presentation Slides - TN-32 High Burnup Dry Storage Research Project, May 13, 2015 (Tom Brookmire) ML15133A0822015-05-13013 May 2015 ISFSI Presentation Slides - TN-32 High Burnup Dry Storage Research Project, May 13, 2015 (Tom Brookmire) ML15128A5462015-05-0808 May 2015 Summary of Public Meeting with North Anna, Units 1 and 2 to Discuss the Annual Assessment with the Public ML14058B1762014-03-0606 March 2014 Presentation Slides - North Anna ISFSI - High Burnup Dry Storage Confirmatory Data Project, TN-32 Storage Cask, Tom Brookmire, March 6, 2014, Docket No. 72-16, TAC No: L24886 ML14071A1672014-01-28028 January 2014 Enclosure 2: Presentation Slides - North Anna ISFSI TN-32 Cask and Pad 1 Assessments Following August 23, 2011, Central Virginia Earthquake ML13159A0092013-06-0404 June 2013 Notable Failures in Nondustructive Testing - June 4, 2013 Public Meeting ML12257A2002012-09-11011 September 2012 2-North Anna Extent of Condition Presentation 9-7-12 Sept 10 ML12257A2342012-09-11011 September 2012 5-Hacker - North Anna Mockup and Search Unit Action Presentation Sept 10 ML12131A5052012-05-0909 May 2012 Presentation for 2011 North Anna EOC Annual Assessment Meeting ML11305A0452011-11-0101 November 2011 Region II - North Anna Public Meeting Slides ML11305A0622011-11-0101 November 2011 Restart Readiness, Public Meeting PR2 ML1128500392011-10-12012 October 2011 Summary of Augmented Inspection Team Public Exit Meeting with Virginia Electric Power Company to Discuss the Results of an ATI Inspection of an Earthquake Event on August 23, 2011 ML11276A0242011-10-0303 October 2011 Slides-North Anna AIT Public Meeting October 3, 2011 ML1127701352011-10-0303 October 2011 Ltr to D. Heacock Re Participation in the Commission Meeting on the North Anna Plant on 10/21/11 ML11252A0062011-09-0808 September 2011 Dominion'S Slides Earthquake Response and North Anna Restart Readiness Demonstration Plan ML12040A2742011-08-31031 August 2011 E-Mail from G. Wilson, NRR to D. Merzke, EDO; Subject: Seismic Instruments at North Anna ML12044A2912011-08-30030 August 2011 E-mail from G. Bowman, EDO to T. Hipschman, Comm, Et Al; Subject: FYI-Revised Slides on North Anna/Gl-199 ML1124205512011-08-30030 August 2011 Seismic Event ML12044A2792011-08-30030 August 2011 Email from M. Khanna, NRR to R. Auluck, NRR FW: North Anna Earthquake Issue Commissioner Briefing Final with Talking Points ML12044A2572011-08-26026 August 2011 Email from A. Istar, NRR to A. Hiser, NRR on North Anna Nuclear Power Plant. Pptx ML1110304822011-04-13013 April 2011 Public Annual Assessment Meeting/Open House Slides ML1032204442010-11-18018 November 2010 Public Meeting Summary - North Anna Power Station ML1021102592010-08-0404 August 2010 Enclosure 3: Dominion - North Anna Presentation of July 28, 2010 Public Meeting ML1020100212010-07-14014 July 2010 Nucler Power Station, Units 1 and 2, Westinghouse RFA-2 Fuel Transition Licensing Meeting Presentation Slides ML1012600332010-05-0505 May 2010 Meeting Posters ML1012600342010-05-0505 May 2010 Public Mtg. Slides ML0917610472009-08-0505 August 2009 ECCS Preacs Filtration Presentation 2024-09-03
[Table view] |
Text
North Anna Units 1 and 2 SLRA RAI Response Discussion May 13, 2021
Agenda
- B2.1.35-1, RG 1.127, Inspection of Water-Control Structures Associated with Nuclear Power Plants
- B2.1.7-1, PWR Reactor Vessel Internals
- B2.1.15-1 Basis for 20-Year Replacement Frequency for Diesel Engine Heat Exchanger
- B2.1.27-1 Cyclic Fatigue of Buried Gray Cast Iron Using Jockey Pump Monitoring
- B2.1.21-1 Basis for Extent of Inspections for Selective Leaching
- B2.1.21-2 Basis for Single 10-Foot Sample for Selective Leaching
Ground Rules Observational Meeting
- Technical Discussion between NRC and Dominion regarding request for additional information (RAI) responses
- The public will have an opportunity at the end of the meeting to make comments or ask the NRC staff questions.
RAI Response Discussion
- Dominion will explain what current situation for each item
- NRC staff will ask questions and seek information and understanding
- Each item has been allotted 25 minutes Public Comment
- One member of the public will speak at a time.
- If you want to speak, raise your hand in Teams
- Each member will have three minutes. After which, the individual will be muted 3
B2.1.35-1, RG 1.127, Inspection of Water-Control Structures Associated with Nuclear Power Plants RAI B2.1.35-1 was issued on April 1, 2021 Explain how the longer interval will continue to provide adequate aging management of settlement for structures within the scope of subsequent license renewal, especially structures which may be close to the settlement action limits identified in the TRM (i.e., data trends indicate limits would be reached within one or two inspection intervals).
RAI response was issued on April 29, 2021 The Resident Inspectors noted that an incident report/condition report was written on April 21, 2021, regarding the settlement of Service Water Pump House SM28 Information/Discussion:
Please discuss how, if at all, the April 21st incident report/condition report impacts the April 29th RAI response 4
B2.1.7-1, PWR Reactor Vessel Internals RAI B2.1.7-1 was issued on April 1, 2021 Address whether a revision to SLRA Table 1, Item 3.1.1-087 and an addition to SLRA Table 2 AMR results are needed to address the management of loss of material due to pitting and crevice corrosion in PWRVI components.
RAI response was issued on April 29, 2021 History:
AMP XI.M16A, PWR internals relies, in part, on PWR water chemistry control to prevent or mitigate aging effects that associated with loss of material induced by general pitting corrosion, crevice corrosion, or stress corrosion cracking or any of its forms. Reactor coolant water chemistry is monitored and maintained in accordance with AMP XI.M2, Water Chemistry, which prevents general pitting corrosion, crevice corrosion, or stress corrosion cracking.
North Anna PWR Internals program is consistent with this GALL-SLR Report statement Information/Discussion:
Since SLRA Table 1, Item 3.1.1-087, falls under AMP XI.M16A, shouldnt it be listed as consistent with GALL-SLR Report rather than not applicable?
5
B2.1.7-1, PWR Reactor Vessel Internals RAI B2.1.7-1 was issued on April 1, 2021 Address whether a revision to SLRA Table 1, Item 3.1.1-087 and an addition to SLRA Table 2 AMR results are needed to address the management of loss of material due to pitting and crevice corrosion in PWRVI components.
RAI response was issued on April 29, 2021 History:
AMP XI.M16A, PWR Internals (Element 2) relies on PWR water chemistry control to prevent loss of material induced by pitting and crevice corrosion.
Reactor coolant water chemistry is monitored and controlled using AMP XI.M2, Water Chemistry, which prevents pitting and crevice corrosion.
The North Anna PWR Internals program is consistent with this GALL-SLR Report element.
Information/Discussion:
Since Row 087 of SRP-SLR Table 3.1-1 cites Water Chemistry (AMP XI.M2) as a preventive measure to preclude pitting & crevice corrosion (consistent with AMP XI.M16A, Element 2), shouldnt SLRA Table 1 Item 3.1.1-087 be listed as consistent with the SRP-SLR line item rather than not applicable?
6
B2.1.15-1 Basis for 20-Year Replacement Frequency for Diesel Engine Heat Exchanger RAI B2.1.15-1 was issued on March 3, 2021
- Asked about changes to be made for testing and monitoring of the diesel engine to address past failure of the heat exchanger RAI response was issued on April 1, 2021
- small tube size makes heat exchanger inspection impractical
- approach changed to 20-year replacement frequency
- replacement frequency based on site operating experience
- heat exchanger now not subject to aging management review 7
B2.1.15-1 Basis for 20-Year Replacement Frequency for Diesel Engine Heat Exchanger - cont.
History:
- Staffs understanding of original diesel engine operating experience:
- Engine refurbished and placed into storage
- Engine returned to service in 2013
- Engine heat exchanger leaks in 2017
- Engine replaced with refurbished engine in 2019 Information/Discussion:
- Given the maintenance history of the engine and the water treatment program for the service water reservoir, what is the basis for choosing 20 years. Keeping in mind the following
- Maintenance histories of original and current installed engine
- Water treatment history of service water reservoir to show previous longevity of the heat exchanger can be used if cooling water environment is different than in past 8
RAI B2.1.27-1 Buried and Underground Piping and Tanks RAI B2.1.27-1 was issued on March 3, 2021 Provide additional information describing how the Buried and Underground Piping and Tanks program will manage cracking due to cyclic fatigue for internally-lined gray cast iron piping and piping components exposed to soil.
RAI response was issued on April 1, 2021 History:
North Anna SLRA discusses plant-specific operating experience for ruptures of buried gray cast iron piping from low-cycle fatigue The buried piping program GALL-SLR AMP XI.M41 was developed based on no operating experience of cracking from cyclic fatigue. Recent operating experience has identified cracking from cyclic fatigue of buried gray cast iron pipe Cracking due to cyclic fatigue of gray cast iron exposed to soil is not a material/environment/aging effect previously evaluated in GALL-SLR GALL-SLR notes applicants are to ensure that plant conditions and operating experience are bounded by those for which the GALL program were evaluated, and if not bounded, the applicant addresses the additional aging effects and augments the program 9
RAI B2.1.27-1 Buried and Underground Piping and Tanks - cont.
History:
SLRA Supplement 1 added a new aging management review item to address cracking of buried gray cast iron piping with the Buried and Underground Piping and Tanks program with a generic note H, indicating the aging effect is not in GALL-SLR for this component, material, and environment combination RAI B2.1.27-1 asked how the Buried and Underground Piping and Tanks program will manage cracking of the buried gray cast iron piping Responses to RAIs note that GALL-SLR AMP XI.M41 allows monitoring jockey pump activity in lieu of visual inspections and discuss enhanced jockey pump monitoring on a 30-day frequency 10
RAI B2.1.27-1 Buried and Underground Piping and Tanks - cont.
Information/Discussion:
- Additional details are needed to demonstrate that cracking due to cyclic fatigue for buried gray cast iron exposed to soil will be adequately managed so that intended functions of the pipe will be maintained consistent with the licensing basis.
- Current system performance information
- Existing crack(s) contribution to current leak rate
- Enhanced jockey pump monitoring
- Unexpected jockey pump operation and determination
- Action levels, actions, and bases of both
- Relation between leak rate and crack size
- Previous fracture mechanics calculations
- Pressure surge values used in crack calculations
- Materials properties used in crack calculations
- Change to crack calculations based on ongoing degradation 11
RAI B2.1.21-1 Selective Leaching RAI B2.1.21-1 was issued on March 3, 2021 Requested a technical justification for using the extent of inspections in GALL-SLR AMP XI.M33 for gray cast iron piping and piping components exposed to soil.
RAI response was issued on April 1, 2021 History:
NUREG-2222, Disposition of Public Comments on the Draft Subsequent License Renewal Guidance Documents NUREG-2191 and NUREG-2192, (12-2017) provides the basis for the reduced inspection population size for selective leaching inspections when compared to other mechanical aging management programs (AMPs).
For a two-unit site, GALL-SLR Report AMP XI.M33, Selective Leaching recommends a sample size of 3 percent or 8 components.
Most mechanical AMPs cite a sample size of 20 percent or 25 components.
Part of the basis for the reduction is industry operating experience (OE) has not detected any instances of loss of material due to selective leaching which resulted in a loss of intended function for the component.
12
RAI B2.1.21-1 Selective Leaching -
cont.
History - cont.:
The NRC issued Information Notice (IN) 2020-04, Operating Experience Regarding Failure of Buried Fire Protection Main Yard Piping, to inform the industry of OE involving the loss of function of buried gray cast iron fire water main yard piping due to multiple factors, including external graphitic corrosion (i.e., selective leaching).
Based on this industry OE, the staff requested additional information (RAI B2.1.21-1) for using the inspection population size in GALL-SLR for the following material/environment combination: gray cast iron exposed to soil.
Dominions response to RAI B2.1.21-1 addressed the staffs request in four different technical areas: (1) selection of leading sample location; (2) enhanced fire water jockey pump monitoring; (3) aging management effectiveness; and (4) elimination of fire protection over pressure events.
13
RAI B2.1.21-1 Selective Leaching -
cont.
Information/Discuss:
Selection of leading sample locations is already factored-in to XI.M33 Enhanced jockey pump is focused on Fire Water System leakage, which is a short term concern mainly associated with leak-before-rupture for the cyclic fatigue issue. Selective leaching on the external surfaces of buried pipe can occur with or without ongoing pipe leakage.
Aging management effectiveness discusses enhanced inspection guidance to the existing Underground Piping and Tank Integrity program, which now include selective leaching considerations. However, these changes were made after the inspections of buried gray cast iron piping were done.
Eliminating over-pressure events by corrective actions to the Fire Water System mainly pertains to the cyclic fatigue issue. Unless the prior cracking of the gray cast iron pipe also involved selective leaching aspects, the lack of cracking since 2003 does not pertain to selective leaching sample size.
14
RAI B2.1.21-2 Selective Leaching RAI B2.1.21-2 was issued on March 3, 2021
- Requested criteria and approach for showing one 10-foot excavation would meet guidance for a representative sample for this material and environment combination RAI response was issued on April 1, 2021
- Criteria provided in RAI response:
- Piping not cathodically protected
- Piping continuously wetted or in high corrosivity soil
- Piping with significant coating degradation or adverse backfill
- Consequence of failure (i.e. proximity to safety-related piping)
- Piping with high stress and/or cyclic loading conditions 15
RAI B2.1.21-2 Selective Leaching -
cont.
History:
- Guidance in GALL-SLR AMP XI.M33:
- Inspections are conducted on a representative sample of each material and environment combination
- Eight visual/mechanical inspections and two destructive inspections are conducted for each unit of a 2-unit site Information/Discussion:
- Although criteria are valid for sample selection, discuss how they provide sufficient bases for limiting the sample size to one 10-foot location as being a representative sample.
16
RAI B2.1.21-2 Selective Leaching -
cont.
History:
- Guidance in GALL-SLR AMP XI.M33:
- Inspections are conducted on a representative sample of each material and environment combination
- Eight visual/mechanical inspections and two destructive inspections are conducted for each unit of a 2-unit site Information/Discussion:
- Although criteria are valid for sample selection, discuss how they provide sufficient bases for limiting the sample size to one 10-foot location as being a representative sample.
17
Public Comment
- The staff cannot address questions associated with the pending litigation
- Comments/questions should be directed to the NRC staff
- One member of the public will speak at a time.
- If you want to speak, raise your hand in Teams
- Each member will have three minutes. After which, the individual will be muted 18