Other: ML20258A284, ML20269A465, ML20276A192, ML20303A199, ML21036A060, ML21067A504, ML21067A507, ML21084A182, ML21091A004, ML21097A027, ML21145A217, ML21217A187, ML21239A064, ML21239A066, ML21239A068, ML21256A067, ML21256A069, ML21312A002, ML21312A003, ML21312A007, PMNS20211071, Discussion Between NRC and Dominion Regarding the North Anna Subsequent License Renewal - Safety Issue - Cyclic Fatigue, PMNS20211128, Discussion Between NRC and Dominion Regarding the North Anna Subsequent License Renewal - an Inconsistency in Documentation Regarding Reactor Coolant Pump Code Case N 481, TLAA 4.7.6
|
MONTHYEARML20246G6972020-08-24024 August 2020 Application for Subsequent Renewed Operating Licenses Project stage: Request ML20269A4652020-10-0606 October 2020 SLRA - Portal Letter Project stage: Other ML20276A1922020-10-0909 October 2020 Subsequent License Renewal Aging Management Audit Plan Project stage: Other ML20258A2842020-10-13013 October 2020 SLRA - Acceptance and Opportunity for Hearing Letter Project stage: Other ML20303A1992020-10-29029 October 2020 Subsequent License Renewal Safety Project Management Assignment Project stage: Other ML20352A3942020-12-17017 December 2020 Proposed License Amendment Request to Change Battery Surveillance Requirements Project stage: Request ML21035A3032021-02-0404 February 2021 (Naps), Units 1 and 2 - Update to Subsequent License Renewal Application (SLRA) Supplement 1 Project stage: Supplement ML21063A5602021-03-0404 March 2021 Final Request for Additional Information Set 1 - North Anna SLRA Safety Review (EPID L-2020-SLR-0000) - Enclosure Project stage: RAI ML21063A5522021-03-0404 March 2021 Final Request for Additional Information Set 1 - North Anna SLRA Safety Review (EPID L-2020-SLR-0000) - Email Project stage: RAI ML21067A5072021-03-0808 March 2021 Final Request for Confirmation of Information (RCI) Set 1 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure Project stage: Other ML21067A5042021-03-0808 March 2021 Final Request for Confirmation of Information (RCI) Set 1 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email Project stage: Other ML21076B0252021-03-17017 March 2021 Update to Subsequent License Renewal Application, Supplement 2 Project stage: Supplement ML21084A1822021-03-24024 March 2021 Subsequent License Renewal Application Response to NRC Requests for Confirmation of Information for the Safety Review - Set 1 Project stage: Other ML21091A0032021-04-0101 April 2021 Final Request for Additional Information Set 2 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure 1 - RAIs Project stage: RAI ML21091A0042021-04-0101 April 2021 SLRA Safety Review - Withdrawn Requests for Information (EPID No. L-2020-SLR-0000) - Enclosure 2 Project stage: Other ML21091A0022021-04-0101 April 2021 Final Request for Additional Information Set 2 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email Project stage: RAI ML21091A1872021-04-0101 April 2021 Response to NRC Request for Additional Information Regarding Safety Review - Set 1 & Clarification to Aging Management of Fire Protection System Lined Ductile Iron Valves Project stage: Supplement ML21036A0602021-04-0808 April 2021 Report for the Aging Management Audit Regarding the Subsequent License Renewal Application Review Project stage: Other ML21097A0272021-04-14014 April 2021 Request for Withholding from Public Disclosure Regarding Subsequent License Renewal Application Project stage: Other ML21104A0372021-04-15015 April 2021 Request for Withholding Information Regarding Subsequent License Renewal Application Project stage: Withholding Request Acceptance ML21119A2872021-04-29029 April 2021 (Naps), Unit 1 and 2 - Subsequent License Renewal Application (SLRA) Response to NRC Request for Additional Information Safety Review - Set 2 and Flow Accelerated Corrosion Program Enhancement Completion Project stage: Response to RAI ML21119A3402021-04-29029 April 2021 Preparation and Scheduling of Operator Licensing Examinations Project stage: Request ML21123A2972021-05-0303 May 2021 Final Request for Additional Information Set 3 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - E-mail Project stage: RAI ML21123A2982021-05-0303 May 2021 Final Request for Additional Information Set 3 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure Project stage: RAI PMNS20210548, Discussion of Dominion'S Response to Select Staff RAIs on North Anna Subsequent License Renewal Application2021-05-12012 May 2021 Discussion of Dominion'S Response to Select Staff RAIs on North Anna Subsequent License Renewal Application Project stage: RAI ML21145A2172021-05-13013 May 2021 Discussion on May 13, 2021 with Dominion on Select Staff RAIs on North Anna Subsequent License Renewal Application - Dominion Slides Project stage: Other ML21132A2892021-05-13013 May 2021 SLRA RAI Response Public Meeting Project stage: RAI PMNS20210666, Discussion of Dominion'S Response to Select Staff RAIs on North Anna Subsequent License Renewal Application2021-05-27027 May 2021 Discussion of Dominion'S Response to Select Staff RAIs on North Anna Subsequent License Renewal Application Project stage: RAI ML21221A1482021-05-27027 May 2021 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - NRC Slides Project stage: RAI ML21221A1542021-05-27027 May 2021 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Dominion Slides Project stage: Meeting ML21147A2932021-05-27027 May 2021 (Naps), Units 1 and 2 Subsequent License Renewal Application (SLRA) Response to NRC Request for Additional Information Safety Review - Set 3 and Administrative Change to SLRA Table A4.0-1, Item 25 Project stage: Response to RAI ML21145A2122021-06-0909 June 2021 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Memoranda Project stage: RAI ML21145A2132021-06-0909 June 2021 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Enclosure 1 - Summary Project stage: RAI ML21145A2152021-06-0909 June 2021 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Enclosure 2 - List of Attendees Project stage: RAI ML21166A3512021-06-15015 June 2021 Safety RAIs - Set 4 - Draft Project stage: Draft RAI PMNS20210777, Discussion of Dominion'S Response to Select Staff RAIs on North Anna Subsequent License Renewal Application - Topics to Be Determined2021-06-15015 June 2021 Discussion of Dominion'S Response to Select Staff RAIs on North Anna Subsequent License Renewal Application - Topics to Be Determined Project stage: RAI PMNS20210778, Discussion of Dominion'S Response to Select Staff RAIs on North Anna Subsequent License Renewal Application - Topics to Be Determined2021-06-23023 June 2021 Discussion of Dominion'S Response to Select Staff RAIs on North Anna Subsequent License Renewal Application - Topics to Be Determined Project stage: RAI ML21174A3042021-06-23023 June 2021 SLRA RAI Response Public Meeting - 21-06-24 Project stage: RAI ML21174A1952021-06-23023 June 2021 Safety RAIs - Set Y - Draft - Enclosure Project stage: Draft RAI ML21188A1652021-07-0707 July 2021 Final Request for Additional Information Set 4 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure Project stage: RAI ML21188A1632021-07-0707 July 2021 Final Request for Additional Information Set 4 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email Project stage: RAI ML21210A3962021-07-29029 July 2021 (Naps), Units 1 and 2 - Subsequent License Renewal Application (SLRA) Response to NRC Request for Additional Information Safety Review - Set 4 and Supplement 3 Project stage: Supplement ML21217A1872021-08-0505 August 2021 (Naps), Units 1 and 2 - Subsequent License Renewal Application First 10 CFR 54.21 (B) Annual Amendment Project stage: Other ML21221A1362021-08-10010 August 2021 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application Project stage: RAI ML21221A1382021-08-10010 August 2021 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Meeting Summary Project stage: RAI ML21221A1412021-08-10010 August 2021 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Attendees Project stage: RAI PMNS20211071, Discussion Between NRC and Dominion Regarding the North Anna Subsequent License Renewal - Safety Issue - Cyclic Fatigue2021-08-13013 August 2021 Discussion Between NRC and Dominion Regarding the North Anna Subsequent License Renewal - Safety Issue - Cyclic Fatigue Project stage: Other ML21225A5642021-08-13013 August 2021 Discussion Point for Public Meeting Regarding Fire Protection Piping Cyclic Loading - Presentation Project stage: Meeting ML21225A5512021-08-13013 August 2021 Discussion Point for Public Meeting Regarding Fire Protection Piping Cyclic Loading - Transmittal E-mail Project stage: Meeting ML21238A0942021-08-25025 August 2021 Draft Request for Additional Information Set Z - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email Project stage: Draft RAI 2021-04-29
[Table View] |
|
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24029A2362024-01-30030 January 2024 Preliminary Results of the Environmental Review, Subsequent License Renewal ML23338A1522023-12-0707 December 2023 Public Meeting Slides for North Anna and Surry Emergency Plan Augmentation Times License Amendment Request ML23255A0992023-09-15015 September 2023 Slides for September 15, 2023 Public Meeting on Poanhi Seismic Evaluations ML23103A3482023-04-14014 April 2023 Annual Assessment Meeting Presentation for North Anna and Surry ML21221A0332022-06-17017 June 2022 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - NRC Slides ML21174A3042021-06-23023 June 2021 SLRA RAI Response Public Meeting - 21-06-24 ML21221A1542021-05-27027 May 2021 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Dominion Slides ML21145A2172021-05-13013 May 2021 Discussion on May 13, 2021 with Dominion on Select Staff RAIs on North Anna Subsequent License Renewal Application - Dominion Slides ML21132A2892021-05-13013 May 2021 SLRA RAI Response Public Meeting ML21034A5972021-02-10010 February 2021 External Presentation Am Atkinson_Nrc ISG-06 Meeting Dominion Digital IC Project 02102021 ML20288A3472020-10-14014 October 2020 (COVID-19) Emergency Preparedness Exemption Pre-Application Meeting ML20099F2992020-04-0909 April 2020 NRC Slides for North Anna pre-app April 9 ML20099F2412020-04-0909 April 2020 Co., NRC Safety Pre& 8208;Application Meeting North Anna Power Station (NAPS) ML20098B6022020-04-0707 April 2020 Annual Assessment Meeting Presentation ML19297D1872019-11-18018 November 2019 Pre-Application Meeting - Dominion Slides ML18320A2502018-11-20020 November 2018 50.90 License Amendment Request - Dominion Fleet EAL Scheme Changes, November 20, 2018 Public Meeting ML18141A3072018-05-21021 May 2018 18 - SLR Status ML17123A2092017-05-0303 May 2017 Summary of Meeting to Discuss Annual Assessment of the North Anna Power Station, Units 1 and 2 with the Public for the Period of January 1, 2016 Through December 31, 2016 ML16124A7582016-05-0303 May 2016 April 14, 2016, Summer of Public Meeting - North Anna, Units 1 and 2 ML16124A7632016-05-0303 May 2016 April 14, 2016, Summary of Public Meeting - North Anna Power Station, Units 1 and 2 ML16104A3822016-04-26026 April 2016 New Fuel Storage Rack & SFP Criticality Analysis for April 26th 2016 Scheduled Category 1, Pre-Submittal Public Teleconference ML16104A3872016-04-13013 April 2016 Criticality Analysis Checklist for North Anna ML15273A4292015-09-29029 September 2015 Revised Slides for September 29, 2015 Meeting with Dominion Re North Anna ISFSI License Renewal ML15153A0452015-05-13013 May 2015 Revised North Anna ISFSI Presentation Slides - TN-32 High Burnup Dry Storage Research Project, May 13, 2015 (Tom Brookmire) ML15133A0822015-05-13013 May 2015 ISFSI Presentation Slides - TN-32 High Burnup Dry Storage Research Project, May 13, 2015 (Tom Brookmire) ML15128A5462015-05-0808 May 2015 Summary of Public Meeting with North Anna, Units 1 and 2 to Discuss the Annual Assessment with the Public ML14101A1202014-04-11011 April 2014 Public Meeting Summary - North Anna Power Station, Docket Nos. 50-338, 50-339 ML14058B1762014-03-0606 March 2014 Presentation Slides - North Anna ISFSI - High Burnup Dry Storage Confirmatory Data Project, TN-32 Storage Cask, Tom Brookmire, March 6, 2014, Docket No. 72-16, TAC No: L24886 ML14071A1672014-01-28028 January 2014 Enclosure 2: Presentation Slides - North Anna ISFSI TN-32 Cask and Pad 1 Assessments Following August 23, 2011, Central Virginia Earthquake ML13159A0092013-06-0404 June 2013 Notable Failures in Nondustructive Testing - June 4, 2013 Public Meeting ML12257A2002012-09-11011 September 2012 2-North Anna Extent of Condition Presentation 9-7-12 Sept 10 ML12257A2342012-09-11011 September 2012 5-Hacker - North Anna Mockup and Search Unit Action Presentation Sept 10 ML12131A5052012-05-0909 May 2012 Presentation for 2011 North Anna EOC Annual Assessment Meeting ML11305A0452011-11-0101 November 2011 Region II - North Anna Public Meeting Slides ML11305A0622011-11-0101 November 2011 Restart Readiness, Public Meeting PR2 ML11276A0242011-10-0303 October 2011 Slides-North Anna AIT Public Meeting October 3, 2011 ML1127701352011-10-0303 October 2011 Ltr to D. Heacock Re Participation in the Commission Meeting on the North Anna Plant on 10/21/11 ML11252A0062011-09-0808 September 2011 Dominion'S Slides Earthquake Response and North Anna Restart Readiness Demonstration Plan ML1124205512011-08-30030 August 2011 Seismic Event ML1110304982011-04-13013 April 2011 Public Meeting Handouts ML1110304942011-04-13013 April 2011 Public Meeting Attendees ML1032204442010-11-18018 November 2010 Public Meeting Summary - North Anna Power Station ML1020100212010-07-14014 July 2010 Nucler Power Station, Units 1 and 2, Westinghouse RFA-2 Fuel Transition Licensing Meeting Presentation Slides ML1012600332010-05-0505 May 2010 Meeting Posters ML1012600342010-05-0505 May 2010 Public Mtg. Slides ML0917610472009-08-0505 August 2009 ECCS Preacs Filtration Presentation ML0911000392009-04-17017 April 2009 Notice of Public Meeting Category 1 - Annual Assessment of North Anna Power Station ML0820501832008-07-23023 July 2008 Meeting Announcement - Summary of Public Meeting Category 1 - Performance Discussion Meeting, North Anna Power Station ML0812008742008-03-24024 March 2008 Annual Assessment Meeting Reactor Oversight Program - Cy 2007 ML0730400332007-11-0101 November 2007 Public Meeting Slides for Meeting with Dominion Nuclear 2024-01-30
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24029A2362024-01-30030 January 2024 Preliminary Results of the Environmental Review, Subsequent License Renewal ML23338A1522023-12-0707 December 2023 Public Meeting Slides for North Anna and Surry Emergency Plan Augmentation Times License Amendment Request ML23255A0992023-09-15015 September 2023 Slides for September 15, 2023 Public Meeting on Poanhi Seismic Evaluations ML23103A3482023-04-14014 April 2023 Annual Assessment Meeting Presentation for North Anna and Surry ML21221A0332022-06-17017 June 2022 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - NRC Slides ML22091A0902022-04-0101 April 2022 Combined 2021 Assessment Meeting Slides ML21221A1542021-05-27027 May 2021 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Dominion Slides ML21221A1482021-05-27027 May 2021 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - NRC Slides ML21132A2892021-05-13013 May 2021 SLRA RAI Response Public Meeting ML21145A2172021-05-13013 May 2021 Discussion on May 13, 2021 with Dominion on Select Staff RAIs on North Anna Subsequent License Renewal Application - Dominion Slides ML21034A5972021-02-10010 February 2021 External Presentation Am Atkinson_Nrc ISG-06 Meeting Dominion Digital IC Project 02102021 ML20288A3472020-10-14014 October 2020 (COVID-19) Emergency Preparedness Exemption Pre-Application Meeting ML20099F2412020-04-0909 April 2020 Co., NRC Safety Pre& 8208;Application Meeting North Anna Power Station (NAPS) ML20099F2992020-04-0909 April 2020 NRC Slides for North Anna pre-app April 9 ML20098B6022020-04-0707 April 2020 Annual Assessment Meeting Presentation ML19297D1872019-11-18018 November 2019 Pre-Application Meeting - Dominion Slides ML18141A3072018-05-21021 May 2018 18 - SLR Status ML16124A7582016-05-0303 May 2016 April 14, 2016, Summer of Public Meeting - North Anna, Units 1 and 2 ML16124A7632016-05-0303 May 2016 April 14, 2016, Summary of Public Meeting - North Anna Power Station, Units 1 and 2 ML15273A4292015-09-29029 September 2015 Revised Slides for September 29, 2015 Meeting with Dominion Re North Anna ISFSI License Renewal ML15133A0822015-05-13013 May 2015 ISFSI Presentation Slides - TN-32 High Burnup Dry Storage Research Project, May 13, 2015 (Tom Brookmire) ML15153A0452015-05-13013 May 2015 Revised North Anna ISFSI Presentation Slides - TN-32 High Burnup Dry Storage Research Project, May 13, 2015 (Tom Brookmire) ML15128A5462015-05-0808 May 2015 Summary of Public Meeting with North Anna, Units 1 and 2 to Discuss the Annual Assessment with the Public ML14058B1762014-03-0606 March 2014 Presentation Slides - North Anna ISFSI - High Burnup Dry Storage Confirmatory Data Project, TN-32 Storage Cask, Tom Brookmire, March 6, 2014, Docket No. 72-16, TAC No: L24886 ML14071A1672014-01-28028 January 2014 Enclosure 2: Presentation Slides - North Anna ISFSI TN-32 Cask and Pad 1 Assessments Following August 23, 2011, Central Virginia Earthquake ML13159A0092013-06-0404 June 2013 Notable Failures in Nondustructive Testing - June 4, 2013 Public Meeting ML12257A2342012-09-11011 September 2012 5-Hacker - North Anna Mockup and Search Unit Action Presentation Sept 10 ML12257A2002012-09-11011 September 2012 2-North Anna Extent of Condition Presentation 9-7-12 Sept 10 ML12131A5052012-05-0909 May 2012 Presentation for 2011 North Anna EOC Annual Assessment Meeting ML11305A0452011-11-0101 November 2011 Region II - North Anna Public Meeting Slides ML11305A0622011-11-0101 November 2011 Restart Readiness, Public Meeting PR2 ML1128500392011-10-12012 October 2011 Summary of Augmented Inspection Team Public Exit Meeting with Virginia Electric Power Company to Discuss the Results of an ATI Inspection of an Earthquake Event on August 23, 2011 ML11276A0242011-10-0303 October 2011 Slides-North Anna AIT Public Meeting October 3, 2011 ML1127701352011-10-0303 October 2011 Ltr to D. Heacock Re Participation in the Commission Meeting on the North Anna Plant on 10/21/11 ML11252A0062011-09-0808 September 2011 Dominion'S Slides Earthquake Response and North Anna Restart Readiness Demonstration Plan ML12040A2742011-08-31031 August 2011 E-Mail from G. Wilson, NRR to D. Merzke, EDO; Subject: Seismic Instruments at North Anna ML12044A2792011-08-30030 August 2011 Email from M. Khanna, NRR to R. Auluck, NRR FW: North Anna Earthquake Issue Commissioner Briefing Final with Talking Points ML1124205512011-08-30030 August 2011 Seismic Event ML12044A2912011-08-30030 August 2011 E-mail from G. Bowman, EDO to T. Hipschman, Comm, Et Al; Subject: FYI-Revised Slides on North Anna/Gl-199 ML12044A2572011-08-26026 August 2011 Email from A. Istar, NRR to A. Hiser, NRR on North Anna Nuclear Power Plant. Pptx ML1110304822011-04-13013 April 2011 Public Annual Assessment Meeting/Open House Slides ML1032204442010-11-18018 November 2010 Public Meeting Summary - North Anna Power Station ML1021102592010-08-0404 August 2010 Enclosure 3: Dominion - North Anna Presentation of July 28, 2010 Public Meeting ML1020100212010-07-14014 July 2010 Nucler Power Station, Units 1 and 2, Westinghouse RFA-2 Fuel Transition Licensing Meeting Presentation Slides ML1012600342010-05-0505 May 2010 Public Mtg. Slides ML1012600332010-05-0505 May 2010 Meeting Posters ML0917610472009-08-0505 August 2009 ECCS Preacs Filtration Presentation ML0912104262009-05-12012 May 2009 7th International Conference on NDE - Presentation :a Destructive Validation of NDE Responses of Service-Induced PWSCC Found in North Anna 2 Control Rod Drive Nozzle 31 ML0820501832008-07-23023 July 2008 Meeting Announcement - Summary of Public Meeting Category 1 - Performance Discussion Meeting, North Anna Power Station ML0812008742008-03-24024 March 2008 Annual Assessment Meeting Reactor Oversight Program - Cy 2007 2024-01-30
[Table view] |
Text
North Anna Units 1 and 2 SLRA RAI Response Discussion May 13, 2021
Agenda
- B2.1.35-1, RG 1.127, Inspection of Water-Control Structures Associated with Nuclear Power Plants
- B2.1.7-1, PWR Reactor Vessel Internals
- B2.1.15-1 Basis for 20-Year Replacement Frequency for Diesel Engine Heat Exchanger
- B2.1.27-1 Cyclic Fatigue of Buried Gray Cast Iron Using Jockey Pump Monitoring
- B2.1.21-1 Basis for Extent of Inspections for Selective Leaching
- B2.1.21-2 Basis for Single 10-Foot Sample for Selective Leaching
Ground Rules
- Technical Discussion between NRC and Dominion regarding request for additional information (RAI) responses
- The public will have an opportunity at the end of the meeting to make comments or ask the NRC staff questions.
- Dominion will explain what current situation for each item
- NRC staff will ask questions and seek information and understanding
- Each item has been allotted 25 minutes
- One member of the public will speak at a time.
- If you want to speak, raise your hand in Teams
- Each member will have three minutes. After which, the individual will be muted 3
B2.1.35-1, RG 1.127, Inspection of Water-Control Structures Associated with Nuclear Power Plants
- RAI B2.1.35-1 was issued on April 1, 2021
- Explain how the longer interval will continue to provide adequate aging management of settlement for structures within the scope of subsequent license renewal, especially structures which may be close to the settlement action limits identified in the TRM (i.e., data trends indicate limits would be reached within one or two inspection intervals).
- RAI response was issued on April 29, 2021
- The Resident Inspectors noted that an incident report/condition report was written on April 21, 2021, regarding the settlement of Service Water Pump House SM28
- Please discuss how, if at all, the April 21st incident report/condition report impacts the April 29th RAI response 4
B2.1.7-1, PWR Reactor Vessel Internals
- RAI B2.1.7-1 was issued on April 1, 2021
- Address whether a revision to SLRA Table 1, Item 3.1.1-087 and an addition to SLRA Table 2 AMR results are needed to address the management of loss of material due to pitting and crevice corrosion in PWRVI components.
- RAI response was issued on April 29, 2021
- AMP XI.M16A, PWR internals relies, in part, on PWR water chemistry control to prevent or mitigate aging effects that associated with loss of material induced by general pitting corrosion, crevice corrosion, or stress corrosion cracking or any of its forms. Reactor coolant water chemistry is monitored and maintained in accordance with AMP XI.M2, Water Chemistry, which prevents general pitting corrosion, crevice corrosion, or stress corrosion cracking.
- North Anna PWR Internals program is consistent with this GALL-SLR Report statement
- Since SLRA Table 1, Item 3.1.1-087, falls under AMP XI.M16A, shouldnt it be listed as consistent with GALL-SLR Report rather than not applicable?
5
B2.1.7-1, PWR Reactor Vessel Internals
- RAI B2.1.7-1 was issued on April 1, 2021
- Address whether a revision to SLRA Table 1, Item 3.1.1-087 and an addition to SLRA Table 2 AMR results are needed to address the management of loss of material due to pitting and crevice corrosion in PWRVI components.
- RAI response was issued on April 29, 2021
- AMP XI.M16A, PWR Internals (Element 2) relies on PWR water chemistry control to prevent loss of material induced by pitting and crevice corrosion.
Reactor coolant water chemistry is monitored and controlled using AMP XI.M2, Water Chemistry, which prevents pitting and crevice corrosion.
- The North Anna PWR Internals program is consistent with this GALL-SLR Report element.
- Since Row 087 of SRP-SLR Table 3.1-1 cites Water Chemistry (AMP XI.M2) as a preventive measure to preclude pitting & crevice corrosion (consistent with AMP XI.M16A, Element 2), shouldnt SLRA Table 1 Item 3.1.1-087 be listed as consistent with the SRP-SLR line item rather than not applicable?
6
B2.1.15-1 Basis for 20-Year Replacement Frequency for Diesel Engine Heat Exchanger
- RAI B2.1.15-1 was issued on March 3, 2021
- Asked about changes to be made for testing and monitoring of the diesel engine to address past failure of the heat exchanger
- RAI response was issued on April 1, 2021
- small tube size makes heat exchanger inspection impractical
- approach changed to 20-year replacement frequency
- replacement frequency based on site operating experience
- heat exchanger now not subject to aging management review 7
B2.1.15-1 Basis for 20-Year Replacement Frequency for Diesel Engine Heat Exchanger - cont.
- Staffs understanding of original diesel engine operating experience:
- Engine refurbished and placed into storage
- Engine returned to service in 2013
- Engine heat exchanger leaks in 2017
- Engine replaced with refurbished engine in 2019
- Given the maintenance history of the engine and the water treatment program for the service water reservoir, what is the basis for choosing 20 years. Keeping in mind the following
- Maintenance histories of original and current installed engine
- Water treatment history of service water reservoir to show previous longevity of the heat exchanger can be used if cooling water environment is different than in past 8
RAI B2.1.27-1 Buried and Underground Piping and Tanks
- RAI B2.1.27-1 was issued on March 3, 2021
- Provide additional information describing how the Buried and Underground Piping and Tanks program will manage cracking due to cyclic fatigue for internally-lined gray cast iron piping and piping components exposed to soil.
- RAI response was issued on April 1, 2021
- North Anna SLRA discusses plant-specific operating experience for ruptures of buried gray cast iron piping from low-cycle fatigue
- The buried piping program GALL-SLR AMP XI.M41 was developed based on no operating experience of cracking from cyclic fatigue. Recent operating experience has identified cracking from cyclic fatigue of buried gray cast iron pipe
- Cracking due to cyclic fatigue of gray cast iron exposed to soil is not a material/environment/aging effect previously evaluated in GALL-SLR
- GALL-SLR notes applicants are to ensure that plant conditions and operating experience are bounded by those for which the GALL program were evaluated, and if not bounded, the applicant addresses the additional aging effects and augments the program 9
RAI B2.1.27-1 Buried and Underground Piping and Tanks - cont.
- SLRA Supplement 1 added a new aging management review item to address cracking of buried gray cast iron piping with the Buried and Underground Piping and Tanks program with a generic note H, indicating the aging effect is not in GALL-SLR for this component, material, and environment combination
- RAI B2.1.27-1 asked how the Buried and Underground Piping and Tanks program will manage cracking of the buried gray cast iron piping
- Responses to RAIs note that GALL-SLR AMP XI.M41 allows monitoring jockey pump activity in lieu of visual inspections and discuss enhanced jockey pump monitoring on a 30-day frequency 10
RAI B2.1.27-1 Buried and Underground Piping and Tanks - cont.
- Additional details are needed to demonstrate that cracking due to cyclic fatigue for buried gray cast iron exposed to soil will be adequately managed so that intended functions of the pipe will be maintained consistent with the licensing basis.
- Current system performance information
- Existing crack(s) contribution to current leak rate
- Enhanced jockey pump monitoring
- Unexpected jockey pump operation and determination
- Action levels, actions, and bases of both
- Relation between leak rate and crack size
- Previous fracture mechanics calculations
- Pressure surge values used in crack calculations
- Materials properties used in crack calculations
- Change to crack calculations based on ongoing degradation 11
RAI B2.1.21-1 Selective Leaching
- RAI B2.1.21-1 was issued on March 3, 2021
- Requested a technical justification for using the extent of inspections in GALL-SLR AMP XI.M33 for gray cast iron piping and piping components exposed to soil.
- RAI response was issued on April 1, 2021
- NUREG-2222, Disposition of Public Comments on the Draft Subsequent License Renewal Guidance Documents NUREG-2191 and NUREG-2192, (12-2017) provides the basis for the reduced inspection population size for selective leaching inspections when compared to other mechanical aging management programs (AMPs).
- For a two-unit site, GALL-SLR Report AMP XI.M33, Selective Leaching recommends a sample size of 3 percent or 8 components.
- Most mechanical AMPs cite a sample size of 20 percent or 25 components.
- Part of the basis for the reduction is industry operating experience (OE) has not detected any instances of loss of material due to selective leaching which resulted in a loss of intended function for the component.
12
RAI B2.1.21-1 Selective Leaching -
cont.
- The NRC issued Information Notice (IN) 2020-04, Operating Experience Regarding Failure of Buried Fire Protection Main Yard Piping, to inform the industry of OE involving the loss of function of buried gray cast iron fire water main yard piping due to multiple factors, including external graphitic corrosion (i.e., selective leaching).
- Based on this industry OE, the staff requested additional information (RAI B2.1.21-1) for using the inspection population size in GALL-SLR for the following material/environment combination: gray cast iron exposed to soil.
- Dominions response to RAI B2.1.21-1 addressed the staffs request in four different technical areas: (1) selection of leading sample location; (2) enhanced fire water jockey pump monitoring; (3) aging management effectiveness; and (4) elimination of fire protection over pressure events.
13
RAI B2.1.21-1 Selective Leaching -
cont.
- Selection of leading sample locations is already factored-in to XI.M33
- Enhanced jockey pump is focused on Fire Water System leakage, which is a short term concern mainly associated with leak-before-rupture for the cyclic fatigue issue. Selective leaching on the external surfaces of buried pipe can occur with or without ongoing pipe leakage.
- Aging management effectiveness discusses enhanced inspection guidance to the existing Underground Piping and Tank Integrity program, which now include selective leaching considerations. However, these changes were made after the inspections of buried gray cast iron piping were done.
- Eliminating over-pressure events by corrective actions to the Fire Water System mainly pertains to the cyclic fatigue issue. Unless the prior cracking of the gray cast iron pipe also involved selective leaching aspects, the lack of cracking since 2003 does not pertain to selective leaching sample size.
14
RAI B2.1.21-2 Selective Leaching
- RAI B2.1.21-2 was issued on March 3, 2021
- Requested criteria and approach for showing one 10-foot excavation would meet guidance for a representative sample for this material and environment combination
- RAI response was issued on April 1, 2021
- Criteria provided in RAI response:
- Piping not cathodically protected
- Piping continuously wetted or in high corrosivity soil
- Piping with significant coating degradation or adverse backfill
- Consequence of failure (i.e. proximity to safety-related piping)
- Piping with high stress and/or cyclic loading conditions 15
RAI B2.1.21-2 Selective Leaching -
cont.
- Guidance in GALL-SLR AMP XI.M33:
- Inspections are conducted on a representative sample of each material and environment combination
- Eight visual/mechanical inspections and two destructive inspections are conducted for each unit of a 2-unit site
- Although criteria are valid for sample selection, discuss how they provide sufficient bases for limiting the sample size to one 10-foot location as being a representative sample.
16
RAI B2.1.21-2 Selective Leaching -
cont.
- Guidance in GALL-SLR AMP XI.M33:
- Inspections are conducted on a representative sample of each material and environment combination
- Eight visual/mechanical inspections and two destructive inspections are conducted for each unit of a 2-unit site
- Although criteria are valid for sample selection, discuss how they provide sufficient bases for limiting the sample size to one 10-foot location as being a representative sample.
17
Public Comment
- The staff cannot address questions associated with the pending litigation
- Comments/questions should be directed to the NRC staff
- One member of the public will speak at a time.
- If you want to speak, raise your hand in Teams
- Each member will have three minutes. After which, the individual will be muted 18
Wrap
- Thank you to all who participated and listened in 19