ML22346A090

From kanterella
Jump to navigation Jump to search

Revision of Schedule for the Conduct of Environmental Review of the North Anna Power Station Subsequent License Renewal Application
ML22346A090
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 12/15/2022
From: Christopher Regan
NRC/NMSS/DREFS
To: Stoddard D
Virginia Electric & Power Co (VEPCO)
References
EPID L-2020-SLE-0000
Download: ML22346A090 (1)


Text

December 15, 2022 Mr. Daniel G. Stoddard Senior Vice President and Chief Nuclear Officer Innsbrook Technical Center 5000 Dominion Blvd Glen Allen, VA 23060-6711

SUBJECT:

REVISION OF SCHEDULE FOR THE CONDUCT OF ENVIRONMENTAL REVIEW OF THE NORTH ANNA POWER STATION SUBSEQUENT LICENSE RENEWAL APPLICATION (EPID NUMBER: L-2020-SLE-0000)

(DOCKET NUMBERS: 50-338 AND 50-339)

Dear Daniel Stoddard:

By letter dated August 24, 2020, Virginia Electric & Power Company, doing business as Dominion Energy Virginia (Dominion) submitted a subsequent license renewal application (SLRA) pursuant to title 10 of the Code of Federal Regulations part 54 (10 CFR), to renew operating licenses NPF-4 and NPF-7 for the North Anna Power Station (North Anna), Units 1 and 2, for review by the U.S. Nuclear Regulatory Commission (NRC or the staff). This letter is to inform you about a schedule change in the North Anna subsequent license renewal review.

In February 2022, the NRC revised the North Anna review schedule showing future milestone dates as "to be determined" to allow the staff to determine the impacts of Commission Orders CLI-22-02 and CLI-22-03 on the North Anna project schedule.

In August 2022, Dominion submitted its SLRA annual update. In September 2022, in response to the Commission Orders, Dominion submitted its SLRA, appendix E (Environmental Report), Supplement 1. The NRC has completed its evaluation of impacts on the North Anna project schedule. The enclosed schedule has been updated to reflect future project milestones. The estimated staff hours to support the enclosed schedule is 5,080 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br />.

D. Stoddard 2 If you have any questions on the revised schedule, please contact Manny Sayoc or Tam Tran by telephone at 301-415-4084 or 301-415-3617 or by email at Emmanuel.Sayoc@nrc.gov or Tam.Tran@nrc.gov.

Sincerely, Signed by Regan, Christopher on 12/15/22 Christopher M. Regan, Division Director Division of Rulemaking, Environmental, and Financial Support Office of Nuclear Material Safety and Safeguards Docket Nos. 50-338 and 50-339

Enclosure:

As stated cc w/encl: Listserv

D. Stoddard 3

SUBJECT:

REVISION OF SCHEDULE FOR THE CONDUCT OF ENVIRONMENTAL REVIEW OF THE NORTH ANNA POWER STATION SUBSEQUENT LICENSE RENEWAL APPLICATION (EPID NUMBER: L-2020-SLE-0000)

(DOCKET NUMBERS: 50-338 AND 50-339)

DATED:

December 15, 2022 DISTRIBUTION:

PUBLIC RidsNrrPMNorth Anna Resource LGibson, NRR/DNRL LWilkins, OCA MSayoc, NRR/DNRL DMcIntyre, HQ/OPA TTran, NMSS/REFS RHannah, RII/OPA TSmith, NMSS/REFS JPelchat, RII/ORA EMiller, NRR/DORL DGasperson, RII/ORA STurk, OGC KCarrington, RII/DRP MMcCoppin, OEDO MThomas, RII/DRP MTobin, RII/DRP SBurnell, HQ/OPA PCooper; RII/DRS MThomas, RII/DRP SDowney, RII/DRS BDesai, RII/DRS JDozier; NRR/DRA Paul.Aitken@dominionenergy.com Kathryn.H.Barret@dominionenergy.com ellery.j.baker@dominionenergy.com ADAMS Accession No.: ML22346A090 *concurrence via email OFFICE PM:REFS PM:DNRL LA:REFS NAME TTran ESayoc AWalker-Smith DATE 12/12/2022 12/13/2022 12/13/2022 OFFICE BC:DNRL BC:REFS DD:REFS NAME LGibson TSmith CRegan DATE 12/13/2022 12/13/2022 12/15/2022

NORTH ANNA POWER STATION SUBSEQUENT LICENSE RENEWAL APPLICATION REVISION OF SCHEDULE Milestone Scheduled Site-specific environmental license renewal application supplement 9/2022 received by NRC NRC publishes availability of supplement Federal Register notice (FRN) NA NRC publishes notice of intent to prepare a supplemental environmental impact statement (SEIS) supplement and start of 30-day limited scoping 11/2022 period FRN Limited scoping period ends 12/2022 Conduct environmental audit 3/2023 NRC issues environmental requests for additional information (RAI) and 3/2023 requests for confirmation of information (RCI), as needed NRC receives RAI/RCI responses 7/2023 Issue Supplemental SER 10/2023 NRC publishes draft SEIS supplement and FRNs to start 45-day 10/2023 comment period and 60-day period to request a hearing Draft SEIS supplement comment period ends 12/2023 Period to request a hearing end 12/2023 Publish final SEIS supplement and FRN 1/2024 Environmental Protection Agency (EPA) Issues FRN - final SEIS supplement notice of availability and beginning of 30-day cooling off 1/2024 period NRC issues FRN - renewed license/record of decision (assuming no comments during EPA cooling off period or per Commission direction, 3/2024 as appropriate)

Decision - Director, NRR 3/2024 Enclosure