MONTHYEARML24282A9732024-10-0808 October 2024 Temporary SW Piping LAR Acceptance Email ML24213A2602024-07-31031 July 2024 Request for Additional Information LAR to Support Implementation of Framatome Gaia Fuel ML24116A0112024-04-25025 April 2024 Acceptance Review Determination for Proposed Alternative Request IR-4-13 Regarding Steam Generator Channel Head Drain Modification ML24116A2822024-04-25025 April 2024 Acceptance of Requested Licensing Action: Surry TS Change Section 3.8 Containment Temperature and Pressure Requirements and Surveillances ML24115A2622024-04-24024 April 2024 Acceptance Review Determination for Proposed Alternative Request IR-4-14 Regarding Pressurizer and Steam Generator Pressure-Retaining Welds and Full-Penetration Welded Nozzles ML24114A3192024-04-23023 April 2024 Acceptance Review Determination LAR to Extend Inspection Interval for Reactor Coolant Pump Flywheels (TSTF-421) Using the CLIIP ML24113A2502024-04-22022 April 2024 Request for Additional Information (e-mail 4/22/2024) License Renewal Commitment for Aging Management Program of Alloy 600 Components ML24107A9112024-04-15015 April 2024 NRC to Fws, Follow-up on Request for Concurrence for North Anna SLR ML24107A9122024-04-11011 April 2024 Fws to NRC, Follow-up on Request for Concurrence for North Anna SLR ML24102A0682024-04-10010 April 2024 IST (z)(2) Hardship RR V-1 RCS Cold Leg, Lh Safety Injection Check Valves ML24092A1082024-04-0101 April 2024 3R22 RFO ISI Owners Activity Report Extension - NRC Staff Acknowledgement Email (4/1/2024) ML24087A0102024-03-26026 March 2024 NRR E-mail Capture - Verbal Relief for North Anna Unit 1 - (ASME Code), Section XI, Subsection IWB-2430 ML24087A0112024-03-23023 March 2024 NRR E-mail Capture - Draft RAIs for Reactor Coolant Pump (RCP) Relief Request (L-2024-LLR-0022) ML24075A1762024-03-15015 March 2024 Email, Acceptance of Requested Licensing Action: Surry TSTF-577, Rev. 1 ML24144A2432024-03-0808 March 2024 002 Radiation Safety Baseline Inspection Information Request ML24065A3112024-03-0505 March 2024 Request for Additional Information (Redacted) (03/05/2025 E-mail from R. Guzman to S. Sinha) Framatome Gaia Fuel LOCA LAR ML24065A2532024-03-0505 March 2024 RAI Issuance Surry RR IST P-1 P-2 ML24058A2322024-02-27027 February 2024 2/27/2024 E-mail from S. Sinha to R. Guzman P-8 Instrument Uncertainty in Support of LAR Framatome Gaia Fuel ML24107B1562024-02-20020 February 2024 Cherokee Nation E.Toombs Na Removal Request ML24044A2462024-02-0606 February 2024 001 Radiation Safety Baseline Inspection Information Request ML24032A4702024-02-0101 February 2024 Change in Estimated Review Schedule Revision to TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC ML24024A2452024-01-24024 January 2024 1/24/2024 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in SE for Amendment No. 288 - Revision to Applicability Term for RCS Heatup and Cooldown Pressure-Temperature Limitations Figures ML24024A0202024-01-24024 January 2024 Correction to Safety Evaluation Associated Wit Amendment No. 288 - Revision to Applicability Term for RCS Heat-Up and Cooldown Pressure-Temperature Limitations Figures ML23320A1122024-01-18018 January 2024 NRC to Fws, Concurrence with Endangered Species Act Determinations for North Anna Power Station, Units 1 and 2, Subsequent License Renewal, Issuance of Draft Supplemental Environmental Impact Statement, and Opportunity for Public Comment ML23355A2722023-12-21021 December 2023 NRR E-mail Capture - Schedule Revision for Emergency Preparedness Staff Augmentation Times License Amendment Request ML23326A0132023-11-22022 November 2023 Acceptance Review Determination LAR to Support Implementation of Framatome Gaia Fuel ML23318A0952023-11-14014 November 2023 Request for Additional Information (E-mail Dated 11/14/2023) LAR to Revise TSs Related to Framatome Gaia Fuel ML23317A0732023-11-13013 November 2023 Acceptance Review Determination - License Amendment Request Modification of TS SR 4.3.6.a ML23318A1172023-11-13013 November 2023 NRR E-mail Capture - Formal Issuance of RAIs for North Anna Technical Support Center (TSC) License Amendment Request (LAR) (L-2023-LLA-0006) ML23312A2962023-11-0808 November 2023 Email - Surry Relief Request Acceptance Review Results; Surry Unit 1 and 2 IST P-3 P-4 Pumps ML23312A2022023-11-0808 November 2023 Relief Request Acceptance Review Results; IST Impracticality P-1 P-2 RHR Containment Pumps ML23297A2312023-10-24024 October 2023 E-mail to File - Summary of September 13, 2023, Meeting with Dominion to Discuss Proposed LAR to Support Cycle Reloads Using Framatome Gaia Fuel ML23283A3262023-10-10010 October 2023 Update Acceptance Review Status Surry TS Change Apply RG 1.97, Rev 3 Instrumentation to Lhsi ML23265A2302023-09-22022 September 2023 Acceptance Review Determination - License Amendment Request Revision to TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC ML23257A2092023-09-14014 September 2023 NRR E-mail Capture - Formal Issuance of 2nd Round RAIs for Surry Units 1&2 and North Anna Units 1&2 Emergency Plans LAR ML23255A2772023-09-12012 September 2023 Acceptance of Requested Licensing Action: Surry TS Change, Lhsi Indication and Instrumentation ML23243A9862023-08-31031 August 2023 NRR E-mail Capture - Draft RAIs for EP Staff Augmentation Times LAR (L-2022-LLA-0166) ML23258A0552023-08-31031 August 2023 Setup of Online Reference Portal and Audit Plan for the NRC Staffs Review of LAR to Use Framatome Small Break and Realistic Large Break LOCA Methodologies (08/31/2023 e-mail) ML23219A1602023-08-0707 August 2023 003 Radiation Safety Baseline Inspection Information Request ML23199A2832023-07-18018 July 2023 Request for Additional Information (E-mail Dated 7/18/2023) LAR to Revise the Pressure-Temperature Limits ML23193A9552023-07-12012 July 2023 NRR E-mail Capture - Acceptance Review for VC Summer and Surry Relief Request (L-2023-LLR-0029) ML23187A1122023-07-0606 July 2023 TSC Relocation LAR RAIs ML23172A0752023-06-21021 June 2023 Acceptance Review Determination LAR to Revise TSs for Reactor Core Safety Limits, Fuel Assemblies, and COLR Related to Framatome Gaia Fuel ML23171B0522023-06-20020 June 2023 NRR E-mail Capture - RAI for Review of Appendix F to DOM-NAF-2-P (Redacted) ML23145A0042023-05-25025 May 2023 Acceptance Review Determination LAR to Use Framatome Small Break and Realistic Large Break LOCA Methodologies ML23145A0052023-05-25025 May 2023 Acceptance Review Determination Exemption to Use Framatome Gaia Fuel Assemblies Containing Fuel Rods Fabricated with M5 Fuel Rod Cladding ML23115A3022023-04-24024 April 2023 4/24/2023 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in Issuance of Amendments Adoption of TSTF-359, Increase Flexibility in Mode Restraints ML23107A2212023-04-10010 April 2023 Amendment Turbine Building Wind Load Basis Reclassification License Amendment Request - State Consultation No Comment ML23089A1882023-03-29029 March 2023 Request for Additional Information (E-mail Dated 3/29/2023) Spring 2022 Steam Generator Tube Inspection Report ML23075A0232023-03-15015 March 2023 NRR E-mail Capture - RAI - License Amend Req (LAR) to Revise Tech Spec (Ts) 3.6.8 Limiting Condition for Operation to Remove Refueling Water Chemical Addition Tank and Replace the Containment Sump Buffer North Anna, 1 and 2 (L-2022-LLA-0162 2024-07-31
[Table view] |
Text
From: Miller, Ed Sent: Tuesday, November 30, 2021 9:55 AM To: gary.d.miller@dominionenergy.com
Subject:
Audit Plan for VIPRE-D Appendix E Review Attachments: Audit Plan V2.docx
- Gary,
By letter dated February 11, 2021 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21042B320), as supplemented by letters dated May 13, 2021 (ADAMS Accession No. ML21133A284) and September 15, 2021 (ADAMS Accession No. ML21259A079), Dominion Energy submitted a request for review and approval of Appendix E to Topical Report DOM-NAF-2-A, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code.
The U.S. Nuclear Regulatory Commission (NRC) staff has determined that a regulatory audit is appropriate to support its review of the topical report. The audit will be conducted via online access to non-docketed information to determine what additional information may need to be docketed to support completion of the NRC staff review. The enclosed audit plan addresses the request for online access to documents. Any audit information the NRC staff determines to be necessary to support the development of the NRC staffs review will be requested to be submitted on the docket.
If you have any questions, please contact me at (301) 415-2481. Thank you.
Ed Miller Project Manager U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Division of Operating Reactor Regulation Licensing Project Branch 2-1
Hearing Identifier: NRR_DRMA Email Number: 1434
Mail Envelope Properties (SA1PR09MB7487DE48C77E65FAF3A9EA19E9679)
Subject:
Audit Plan for VIPRE-D Appendix E Review Sent Date: 11/30/2021 9:55:11 AM Received Date: 11/30/2021 9:55:00 AM From: Miller, Ed
Created By: Ed.Miller@nrc.gov
Recipients:
"gary.d.miller@dominionenergy.com" <gary.d.miller@dominionenergy.com>
Tracking Status: None
Post Office: SA1PR09MB7487.namprd09.prod.outlook.com
Files Size Date & Time MESSAGE 1322 11/30/2021 9:55:00 AM Audit Plan V2.docx 32898
Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
REGULATORY AUDIT
APPENDIX E TO FLEET REPORT DOM-NAF-2, QUALIFICATION OF THE FRAMATOME
BWU-I CHF CORRELATION IN THE DOMINION ENERGY VIPRE-D COMPUTER CODE
BACKGROUND
By letter dated February 11, 2021 (Agencywide Documents Access Management System Accession No. ML21042B321), Dominion Energy submitted a request for review and approval of Appendix E to Fleet Report DOM-NAF-2, Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code. Dominion supplemented its request by letters dated May 13, 2021 (ADAMS Accession No. ML21133A284) and September 15, 2021 (ADAMS Accession No. ML21259A079).
REGULATORY AUDIT BASIS
Audits for understanding are a tool that the NRC staff has used early in the review process to more effectively and efficiently understand the material which has been submitted for review.
While they are an optional tool, they have been found to greatly reduce the number of RAIs and total number of hours necessary in performing the review and are generally seen by both the NRC staff and the applicant or licensee as a large efficiency gain. This audit will be conducted in accordance with NRR Office Instruction LIC-111, Regulatory Audits, Revision 1, dated October 2019 (ADAMS Accession No. ML19226A274), with exceptions noted within this audit plan.
REGULATORY AUDIT SCOPE
The NRC staff will conduct a one-day virtual audit. The audit will focus on two issues:
(1) Dominion Energy identified a recent correction to the material they had previously submitted. The NRC staff would like better understand the detailed calculations, analyses, and bases for this correction as well as information that is expected to be provided in the updated information.
(2) Data used to support the licensees response to RAI-03, subject to possible withholding under 10 CFR 2.390 as proprietary information
INFORMATION AND OTHER MATERIAL NECESSARY FOR THE REGULATORY AUDIT
The NRC staff would like Dominion Energy to make available the appropriate staff with knowledge of Appendix E to Fleet Report DOM-NAF-2, Qualification of the Framatome BWU -I CHF Correlation in the Dominion Energy VIPRE-D Computer Code who can address any comprehension questions by the NRC staff as well make available any references those staff deem appropriate.
TEAM AND REVIEW ASSIGNMENTS
The regulatory audit will be held virtually.
Joshua Kaizer, NRR/DSS/SNPB Rosemary Sugrue, NRR/DSS/SNRB Reed Anzalone, NRR/EVS (Optional)
LOGISTICS
Audit Dates: December 2021, as supported by participant schedules
Dominion Energy is requested to provide the necessary documents and relevant staff who can discuss the issue. If necessary, an electronic reading room could be used for sharing necessary references ahead of time and during the audit. If provided, any electronic reading rooms should restrict NRC staff access to viewing only (i.e., disable download and printing capability).
DELIVERABLES
The NRC staff will develop any RAIs, as needed, via NRR Office Instruction LIC-115 and issue such RAIs separately from audit-related correspondence. A regulatory audit summary will be provided within 90 days of the completion of the audit.
OFFICE DORL/LPL2-1/PM DSS/SFNB/BC DORL/LPL2-1/BC NAME GEMiller RLukes MMarkley DATE 11/30/2021 11/29/2021 11/30/2021