Forwards Safety Insp Repts 50-266/87-03 & 50-301/87-03 on 870105-09.No Violations Noted
ML20210A683
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 02/03/1987
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Fay C
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20210A688 List:
References
NUDOCS 8702060518
Download: ML20210A683 (2)


See also: IR 05000266/1987003

Text

F

'

.

FEB 0 31987

Docket No. 50-266

Docket No. 50-301

Wisconsin Electric Power Company

ATTN: Mr. C. W. Fay

Vice President

Nuclear Power Department

231 West Michigan, Room 308

Milwaukee, WI 53201

Gentlemen:

This refers to the routine safety inspection conducted by Drs. R. B. Holtzman,

~

M. J. Destmann, and J. E. House of this office on January 5-9, 1987, of

activities at Point Beach Nuclear Power Plant, Units 1 and 2, authorized by

NRC Operating Licenses No. DRP-24 and No. DRP-27 and to the discussion of our

findings with J. Zach and other members of your staff at the conclusion of the

inspection. A telephone discussion was held with T. Fredericks on January 21,

1987.

The enclosed copy of our inspection re) ort identifies areas examined during

the inspection. Within these areas, t1e inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

,

f u

kliR bOC 0hoch66 ea ness,and

G PDR

nerg

Rad on$ogica Protection Branch

Enclosure: Inspection Reports

No. 50-266/87003(DRSS);

No. 50-301/87003(DRSS)

See Attached Distribution

II ' RIII RIII RIG. (RIII RII

lG$an/ib Destmanna

f

Hougs

G Gb

Sc macher hEgi e, , S f$r {n y

W T r t ch & 70

2 )

/\/ 6

_ . -

,- _-

,

Wisconsin Electric Power Company 2

FE8 0 31987

Distribution

cc w/ enclosure:

J. J. Zach, Plant Manager

DCS/RSB(RIDS)

Licensing Fee Management Branch

Resident inspector, RIII

Virgil Kanable, Chief

Boiler Section

Mary Lou Munts, Chairperson i

Wisconsin Public Service

Commission

ColletteBlum-Meister(SLO),

WI Div. of Emergency Government

!

I

.

!

i

<=

i

,

.