1 JUL ! ! 1985

\ ,

Docket No. 50-266 Docket No. 50-301

' Wisconsin Electric Power Company ATTN: Mr. C. W. Fay Vice President Nuclear Power Department 231 West Michigan, Room 308 Milwaukee, WI 53201 Gentlemen:

For the past several years, NRC Headquarters has been working to provide a Health Physics Network (HPN) that will operate reliably. We are now convinced that the current system cannot be made to operate to our satisfaction.

Therefore, a decision has been made to replace the current HPN telephone system with dedicated commercial circuits. In order to increase the probability of being available in an emergency, each of the replacement HPN commercial circuits will be routed through an exchange at a telephone company Central Office different from the office that the facility's circuits are routed through.

Existing HPN service is currently installed, or ordered to be installed, in the E0F, TSC, Health Physics Office and NRC Resident Inspector's Office. The new system will be located only in the E0F and TSC, and will be removed from the Health Physics Office and the Resident Inspector's Office where currently installed. In order to make these changes, telephone company personnel will need access to all HPN extensions currently installed and any locations in the EOF and TSC where an HPN extension was to be located but is not yet installed.

The following is the priority order in which we will have commercial HPN service installed.

1. Install commercial service at those facilities where no HPN service exists.
2. Install commercial service at those facilities where no HPN service exists in the E0F but does in the TSC.
3. Install commercial service at those facilities where no HPN service exists in the TSC but does in the E0F.
4. Replace existing HPN special circuitry with commercial service at those facilities that currently have HPN special circuitry. Replacement service will be in the EOF and TSC, only. All other locations are to be removed.

8507160363 850711 PDR

[

ADOCK 05000266 ,M F pop L

'3

r Wisconsin Electric Power Company 2 m i 1 085 More definitive, plant-by plant schedules will be forthcoming when the dates for changes in' service are known.

Should you have any questions or need further information Ms. Linda Kers, Emergency Response Coordinator, is the Regional point of contact for assuring coordination between your facilities and the telephone companies. She may be reached on (312) 790-5711.

Sincerely,

',I A. Hind, Director ivision of Radiation Safety and Safeguards cc: J. J. Zach, Plant Manager DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII John J. Duffy, Chief Boiler Section Ness Flores, Chairperson Wisconsin Public Service Commission RIII RIII M RIII A RII RIII Id

$ ,j/-

Phi 1ps 99/1 Pa ri llo Norel ~s

  • I /85 7 f f5' 4

=

_ _ _ _ _ _ -