Category:INSPECTION REPORT
MONTHYEARIR 05000413/19990051999-09-24024 September 1999 Insp Repts 50-413/99-05 & 50-414/99-05 on 990718-0828. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19990041999-08-13013 August 1999 Insp Repts 50-413/99-04 & 50-414/99-04 on 990606-0717. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20209E2831999-07-0101 July 1999 Insp Repts 50-413/99-03 & 50-414/99-03 on 990425-0605. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000413/19990111999-06-0202 June 1999 Insp Repts 50-413/99-11 & 50-414/99-11 on 990422-23 & 0503. No Violations Noted.Major Areas Inspected:Licensee Identified Frost & Ice Buildup Which Affected Unit 1 Ice Condenser Lower Inlet Doors IR 05000413/19990021999-05-20020 May 1999 Insp Repts 50-413/99-02 & 50-414/99-02 on 990314-0424.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20206U4161999-05-10010 May 1999 Insp Repts 50-413/99-10 & 50-414/99-10 on 990314-0424. Violation Being Considered for Escalated Enforcement Action Noted.Major Areas Inspected:Operations IR 05000413/19990011999-04-0606 April 1999 Insp Repts 50-413/99-01 & 50-414/99-01 on 990124-0313. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19980121999-02-17017 February 1999 Insp Repts 50-413/98-12 & 50-414/98-12 on 981213-990123. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19980111999-01-11011 January 1999 Insp Repts 50-413/98-11 & 50-414/98-11 on 981101-1212.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19980151999-01-0404 January 1999 Insp Repts 50-413/98-15 & 50-414/98-15 on 981102-06 & 16-20. No Violations Noted.Major Areas Inspected:Licensee Corrective Action Program by Sampling Activities Defined in Nuclear Sys Directive 210,rev 1 IR 05000413/19980161998-12-0404 December 1998 Insp Repts 50-413/98-16 & 50-414/98-16 on 980915-1101.No Violations Rept Encl.Major Areas Inspected:Licensee Maint, Surveillance & Engineering Programs Involving Unit 2 Ice Condenser IR 05000413/19980101998-11-23023 November 1998 Insp Repts 50-413/98-10 & 50-414/98-10 on 980927-1031.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering & Plant Support ML20155B3821998-10-19019 October 1998 Insp Repts 50-413/98-13 & 50-414/98-13 on 980807-0915. Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Review Ice Condenser Related Problems,Which Led to Forced Shutdown IR 05000413/19980081998-09-14014 September 1998 Insp Repts 50-413/98-08 & 50-414/98-08 on 980705-0815. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000413/19980091998-08-26026 August 1998 Insp Repts 50-413/98-09 & 50-414/98-09 on 980816-0826. Examples of Two Apparent Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000413/19980071998-07-27027 July 1998 Insp Repts 50-413/98-07 & 50-414/98-07 on 980524-0704. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support,Including Physical Security IR 05000413/19980051998-06-22022 June 1998 Insp Repts 50-413/98-05 & 50-414/98-05 on 980412-0523.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19980061998-06-0505 June 1998 Insp Repts 50-413/98-06 & 50-414/98-06 on 980511-15. Violations Noted.Major Areas Inspected:Facts Surrounding Event Associated W/Degradation of CNS Unit Auxiliary Feedwater Sys During Rapid down-power on 980507 IR 05000413/19980031998-04-30030 April 1998 Insp Repts 50-413/98-03 & 50-414/98-03 on 980222-0411. Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Aspects of Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19980041998-04-20020 April 1998 Insp Repts 50-413/98-04 & 50-414/98-04 on 980302-06.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant ML20217G5661998-03-23023 March 1998 Insp Repts 50-413/98-01 & 50-414/98-01 on 980111-0221. Violations Noted.Major Areas Inspected:Operation,Maint, Engineering & Plant Support IR 05000413/19980021998-02-17017 February 1998 Partially Withheld Insp Repts 50-413/98-02 & 50-414/98-02 on 980112-13 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Plant Support,Including Malevolent Use of Vehicles at Plant ML20203L6301998-02-0909 February 1998 Insp Repts 50-413/97-15 & 50-414/97-15 on 971123-980110. Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support ML20197F2861997-12-19019 December 1997 Insp Repts 50-413/97-14 & 50-414/97-14 on 971012-1122. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19970121997-11-10010 November 1997 Insp Repts 50-413/97-12 & 50-414/97-12 on 970831-1011. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support as Well as Results of Announced Inspection by Regional Security Inspector IR 05000413/19970111997-09-26026 September 1997 Insp Repts 50-413/97-11 & 50-414/97-11 on 970720-0830. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19970101997-09-11011 September 1997 Insp Repts 50-413/97-10 & 50-414/97-10 on 970623-0731.No Violations Noted.Major Areas Inspected:Licensee Calculations,Analysis & Other Engineering Documents ML20210N7341997-08-18018 August 1997 Insp Repts 50-413/97-09 & 50-414/97-09 on 970608-0719. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20149F9291997-07-0707 July 1997 Insp Repts 50-413/97-08 & 50-414/97-08 on 970427-0607. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20148F9441997-05-23023 May 1997 Insp Repts 50-413/97-07 & 50-414/97-07 on 970323-0426. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19970051997-04-21021 April 1997 Integrated Insp Repts 50-413/97-05 & 50-414/97-05 on 970216- 0322.No Violations Identified.Major Areas Inspected:Maint, Operations,Engineering & Plant Support IR 05000413/19970061997-04-0404 April 1997 Insp Repts 50-413/97-06 & 50-414/97-06 on 970317-20.No Violations Noted.Major Areas Inspected:Conduct of Security & Safeguards Activities,Plant Support & Status of Security Facilities & Equipment ML20140B7631997-03-17017 March 1997 Insp Repts 50-413/97-03 & 50-414/97-03 on 970112-0215. Violations Noted.Major Areas Inspected:Licensee Operation, Maint,Engineering & Plant Support IR 05000413/19960191997-02-21021 February 1997 Insp Repts 50-413/96-19 & 50-414/96-19 on 961007, 961127, & 970206.Violation Noted.Major Areas inspected:in-office Review of Licensee Describing Changes to CNS UFSAR Re Lack of Circuit Breaker Coordination for 600-Vac IR 05000413/19960201997-02-10010 February 1997 Insp Repts 50-413/96-20 & 50-414/96-20 on 961201-970111.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19970041997-01-31031 January 1997 Insp Repts 50-413/97-04 & 50-414/97-04 on 970106-23.No Violations Noted.Major Areas Inspected:Operations & Engineering IR 05000413/19970021997-01-31031 January 1997 Insp Repts 50-413/97-02 & 50-414/97-02 on 970106-10.No Violations Noted.Major Areas Inspected:Plant Support IR 05000413/19960181996-12-30030 December 1996 Insp Repts 50-413/96-18 & 50-414/96-18 on 961020-1130.No Violations Noted.Major Areas Inspected:Operations,Maint & Engineering ML20135C2601996-11-15015 November 1996 Insp Repts 50-413/96-16 & 50-414/96-16 on 960908-1019.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19960151996-11-0707 November 1996 Insp Repts 50-413/96-15 & 50-414/96-15 on 960901-1012.No Violations Noted.Major Areas Inspected:Engineering & Plant Support IR 05000413/19960171996-11-0101 November 1996 Insp Repts 50-413/96-17 & 50-414/96-17 on 960930-1004.No Violations Noted.Major Areas Inspected:Plant Support ML20128R0951996-10-0707 October 1996 Insp Repts 50-413/96-13 & 50-414/96-13 on 960728-0907. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering,Plant Support & Plant Status ML20128J0391996-09-30030 September 1996 Insp Repts 50-413/96-12 & 50-414/96-12 on 960804-31. Violations Noted.Major Areas Inspected:Engineering, Summary of Plant Status & Observations & Findings IR 05000413/19940141994-06-0303 June 1994 Insp Repts 50-413/94-14 & 50-414/94-14 on 940509-20.No Violations Noted.Major Areas Inspected:Isi & Flow Assisted Corrosion IR 05000269/19930321994-01-0606 January 1994 Insp Repts 50-269/93-32,50-270/93-32,50-287/93-32, 50-369/93-31,50-370/93-31,50-413/93-35 & 50-414,respectively on 931213-17.Violations Noted.Major Areas Inpected:Licensee Safeguards Info Program to folow-up on Licensee Repts IR 05000413/19930321993-12-30030 December 1993 Insp Repts 50-413/93-32 & 50-414/93-32 on 931117-19 & 1129-1203.Violations Noted.Major Areas Inspected:Observation of Eddy Current (ET) Exam of SG Tubes,Inservice Activities Including Surface & Volumetric Exams,Review of Radiographs IR 05000413/19930331993-12-23023 December 1993 Insp Repts 50-413/93-33 & 50-414/93-33 on 931129-1203.No Violations Noted.Major Areas Inspected:Isi of Pipe Supports & Snubbers & TS Surveillance of Snubbers IR 05000413/19930311993-12-22022 December 1993 Insp Repts 50-413/93-31 & 50-414/93-31 on 931107-1204.No Violations Noted.Major Areas Inspected:Plant Operations, Maintenance,Engineering,Plant Support & follow-up of Previously Identifed Items IR 05000413/19930291993-12-12012 December 1993 Insp Repts 50-413/93-29 & 50-414/93-29 on 931115-19.No Violations Noted.Major Areas Inspected:Occupational Radiation Safety,Organization & Mgt Controls,Training & Qualification,Audits & Appraisals IR 05000413/19930281993-12-10010 December 1993 Insp Repts 50-413/93-28 & 50-414/93-28 on 931101-05.No Violations Noted.Deviation Noted.Major Areas Inspected: Adequacy of Licensee Programs,Procedures & Supporting Documentation for Implementation of Station Blackout Rule 1999-09-24
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000413/19990051999-09-24024 September 1999 Insp Repts 50-413/99-05 & 50-414/99-05 on 990718-0828. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19990041999-08-13013 August 1999 Insp Repts 50-413/99-04 & 50-414/99-04 on 990606-0717. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20209E2831999-07-0101 July 1999 Insp Repts 50-413/99-03 & 50-414/99-03 on 990425-0605. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000413/19990111999-06-0202 June 1999 Insp Repts 50-413/99-11 & 50-414/99-11 on 990422-23 & 0503. No Violations Noted.Major Areas Inspected:Licensee Identified Frost & Ice Buildup Which Affected Unit 1 Ice Condenser Lower Inlet Doors IR 05000413/19990021999-05-20020 May 1999 Insp Repts 50-413/99-02 & 50-414/99-02 on 990314-0424.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20206U4161999-05-10010 May 1999 Insp Repts 50-413/99-10 & 50-414/99-10 on 990314-0424. Violation Being Considered for Escalated Enforcement Action Noted.Major Areas Inspected:Operations IR 05000413/19990011999-04-0606 April 1999 Insp Repts 50-413/99-01 & 50-414/99-01 on 990124-0313. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19980121999-02-17017 February 1999 Insp Repts 50-413/98-12 & 50-414/98-12 on 981213-990123. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19980111999-01-11011 January 1999 Insp Repts 50-413/98-11 & 50-414/98-11 on 981101-1212.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19980151999-01-0404 January 1999 Insp Repts 50-413/98-15 & 50-414/98-15 on 981102-06 & 16-20. No Violations Noted.Major Areas Inspected:Licensee Corrective Action Program by Sampling Activities Defined in Nuclear Sys Directive 210,rev 1 IR 05000413/19980161998-12-0404 December 1998 Insp Repts 50-413/98-16 & 50-414/98-16 on 980915-1101.No Violations Rept Encl.Major Areas Inspected:Licensee Maint, Surveillance & Engineering Programs Involving Unit 2 Ice Condenser IR 05000413/19980101998-11-23023 November 1998 Insp Repts 50-413/98-10 & 50-414/98-10 on 980927-1031.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering & Plant Support ML20155B3821998-10-19019 October 1998 Insp Repts 50-413/98-13 & 50-414/98-13 on 980807-0915. Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Review Ice Condenser Related Problems,Which Led to Forced Shutdown IR 05000413/19980081998-09-14014 September 1998 Insp Repts 50-413/98-08 & 50-414/98-08 on 980705-0815. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000413/19980091998-08-26026 August 1998 Insp Repts 50-413/98-09 & 50-414/98-09 on 980816-0826. Examples of Two Apparent Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000413/19980071998-07-27027 July 1998 Insp Repts 50-413/98-07 & 50-414/98-07 on 980524-0704. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support,Including Physical Security IR 05000413/19980051998-06-22022 June 1998 Insp Repts 50-413/98-05 & 50-414/98-05 on 980412-0523.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19980061998-06-0505 June 1998 Insp Repts 50-413/98-06 & 50-414/98-06 on 980511-15. Violations Noted.Major Areas Inspected:Facts Surrounding Event Associated W/Degradation of CNS Unit Auxiliary Feedwater Sys During Rapid down-power on 980507 IR 05000413/19980031998-04-30030 April 1998 Insp Repts 50-413/98-03 & 50-414/98-03 on 980222-0411. Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Aspects of Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19980041998-04-20020 April 1998 Insp Repts 50-413/98-04 & 50-414/98-04 on 980302-06.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant ML20217G5661998-03-23023 March 1998 Insp Repts 50-413/98-01 & 50-414/98-01 on 980111-0221. Violations Noted.Major Areas Inspected:Operation,Maint, Engineering & Plant Support IR 05000413/19980021998-02-17017 February 1998 Partially Withheld Insp Repts 50-413/98-02 & 50-414/98-02 on 980112-13 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Plant Support,Including Malevolent Use of Vehicles at Plant ML20203L6301998-02-0909 February 1998 Insp Repts 50-413/97-15 & 50-414/97-15 on 971123-980110. Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support ML20197F2861997-12-19019 December 1997 Insp Repts 50-413/97-14 & 50-414/97-14 on 971012-1122. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19970121997-11-10010 November 1997 Insp Repts 50-413/97-12 & 50-414/97-12 on 970831-1011. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support as Well as Results of Announced Inspection by Regional Security Inspector IR 05000413/19970111997-09-26026 September 1997 Insp Repts 50-413/97-11 & 50-414/97-11 on 970720-0830. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19970101997-09-11011 September 1997 Insp Repts 50-413/97-10 & 50-414/97-10 on 970623-0731.No Violations Noted.Major Areas Inspected:Licensee Calculations,Analysis & Other Engineering Documents ML20210N7341997-08-18018 August 1997 Insp Repts 50-413/97-09 & 50-414/97-09 on 970608-0719. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20149F9291997-07-0707 July 1997 Insp Repts 50-413/97-08 & 50-414/97-08 on 970427-0607. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20148F9441997-05-23023 May 1997 Insp Repts 50-413/97-07 & 50-414/97-07 on 970323-0426. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19970051997-04-21021 April 1997 Integrated Insp Repts 50-413/97-05 & 50-414/97-05 on 970216- 0322.No Violations Identified.Major Areas Inspected:Maint, Operations,Engineering & Plant Support IR 05000413/19970061997-04-0404 April 1997 Insp Repts 50-413/97-06 & 50-414/97-06 on 970317-20.No Violations Noted.Major Areas Inspected:Conduct of Security & Safeguards Activities,Plant Support & Status of Security Facilities & Equipment ML20140B7631997-03-17017 March 1997 Insp Repts 50-413/97-03 & 50-414/97-03 on 970112-0215. Violations Noted.Major Areas Inspected:Licensee Operation, Maint,Engineering & Plant Support IR 05000413/19960191997-02-21021 February 1997 Insp Repts 50-413/96-19 & 50-414/96-19 on 961007, 961127, & 970206.Violation Noted.Major Areas inspected:in-office Review of Licensee Describing Changes to CNS UFSAR Re Lack of Circuit Breaker Coordination for 600-Vac IR 05000413/19960201997-02-10010 February 1997 Insp Repts 50-413/96-20 & 50-414/96-20 on 961201-970111.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19970041997-01-31031 January 1997 Insp Repts 50-413/97-04 & 50-414/97-04 on 970106-23.No Violations Noted.Major Areas Inspected:Operations & Engineering IR 05000413/19970021997-01-31031 January 1997 Insp Repts 50-413/97-02 & 50-414/97-02 on 970106-10.No Violations Noted.Major Areas Inspected:Plant Support IR 05000413/19960181996-12-30030 December 1996 Insp Repts 50-413/96-18 & 50-414/96-18 on 961020-1130.No Violations Noted.Major Areas Inspected:Operations,Maint & Engineering ML20135C2601996-11-15015 November 1996 Insp Repts 50-413/96-16 & 50-414/96-16 on 960908-1019.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19960151996-11-0707 November 1996 Insp Repts 50-413/96-15 & 50-414/96-15 on 960901-1012.No Violations Noted.Major Areas Inspected:Engineering & Plant Support IR 05000413/19960171996-11-0101 November 1996 Insp Repts 50-413/96-17 & 50-414/96-17 on 960930-1004.No Violations Noted.Major Areas Inspected:Plant Support ML20128R0951996-10-0707 October 1996 Insp Repts 50-413/96-13 & 50-414/96-13 on 960728-0907. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering,Plant Support & Plant Status ML20128J0391996-09-30030 September 1996 Insp Repts 50-413/96-12 & 50-414/96-12 on 960804-31. Violations Noted.Major Areas Inspected:Engineering, Summary of Plant Status & Observations & Findings IR 05000413/19940141994-06-0303 June 1994 Insp Repts 50-413/94-14 & 50-414/94-14 on 940509-20.No Violations Noted.Major Areas Inspected:Isi & Flow Assisted Corrosion IR 05000269/19930321994-01-0606 January 1994 Insp Repts 50-269/93-32,50-270/93-32,50-287/93-32, 50-369/93-31,50-370/93-31,50-413/93-35 & 50-414,respectively on 931213-17.Violations Noted.Major Areas Inpected:Licensee Safeguards Info Program to folow-up on Licensee Repts IR 05000413/19930321993-12-30030 December 1993 Insp Repts 50-413/93-32 & 50-414/93-32 on 931117-19 & 1129-1203.Violations Noted.Major Areas Inspected:Observation of Eddy Current (ET) Exam of SG Tubes,Inservice Activities Including Surface & Volumetric Exams,Review of Radiographs IR 05000413/19930331993-12-23023 December 1993 Insp Repts 50-413/93-33 & 50-414/93-33 on 931129-1203.No Violations Noted.Major Areas Inspected:Isi of Pipe Supports & Snubbers & TS Surveillance of Snubbers IR 05000413/19930311993-12-22022 December 1993 Insp Repts 50-413/93-31 & 50-414/93-31 on 931107-1204.No Violations Noted.Major Areas Inspected:Plant Operations, Maintenance,Engineering,Plant Support & follow-up of Previously Identifed Items IR 05000413/19930291993-12-12012 December 1993 Insp Repts 50-413/93-29 & 50-414/93-29 on 931115-19.No Violations Noted.Major Areas Inspected:Occupational Radiation Safety,Organization & Mgt Controls,Training & Qualification,Audits & Appraisals IR 05000413/19930281993-12-10010 December 1993 Insp Repts 50-413/93-28 & 50-414/93-28 on 931101-05.No Violations Noted.Deviation Noted.Major Areas Inspected: Adequacy of Licensee Programs,Procedures & Supporting Documentation for Implementation of Station Blackout Rule 1999-09-24
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000413/19990051999-09-24024 September 1999 Insp Repts 50-413/99-05 & 50-414/99-05 on 990718-0828. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19990041999-08-13013 August 1999 Insp Repts 50-413/99-04 & 50-414/99-04 on 990606-0717. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20209E2831999-07-0101 July 1999 Insp Repts 50-413/99-03 & 50-414/99-03 on 990425-0605. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000413/19990111999-06-0202 June 1999 Insp Repts 50-413/99-11 & 50-414/99-11 on 990422-23 & 0503. No Violations Noted.Major Areas Inspected:Licensee Identified Frost & Ice Buildup Which Affected Unit 1 Ice Condenser Lower Inlet Doors IR 05000413/19990021999-05-20020 May 1999 Insp Repts 50-413/99-02 & 50-414/99-02 on 990314-0424.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20206U4161999-05-10010 May 1999 Insp Repts 50-413/99-10 & 50-414/99-10 on 990314-0424. Violation Being Considered for Escalated Enforcement Action Noted.Major Areas Inspected:Operations IR 05000413/19990011999-04-0606 April 1999 Insp Repts 50-413/99-01 & 50-414/99-01 on 990124-0313. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19980121999-02-17017 February 1999 Insp Repts 50-413/98-12 & 50-414/98-12 on 981213-990123. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19980111999-01-11011 January 1999 Insp Repts 50-413/98-11 & 50-414/98-11 on 981101-1212.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19980151999-01-0404 January 1999 Insp Repts 50-413/98-15 & 50-414/98-15 on 981102-06 & 16-20. No Violations Noted.Major Areas Inspected:Licensee Corrective Action Program by Sampling Activities Defined in Nuclear Sys Directive 210,rev 1 IR 05000413/19980161998-12-0404 December 1998 Insp Repts 50-413/98-16 & 50-414/98-16 on 980915-1101.No Violations Rept Encl.Major Areas Inspected:Licensee Maint, Surveillance & Engineering Programs Involving Unit 2 Ice Condenser IR 05000413/19980101998-11-23023 November 1998 Insp Repts 50-413/98-10 & 50-414/98-10 on 980927-1031.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering & Plant Support ML20155B3821998-10-19019 October 1998 Insp Repts 50-413/98-13 & 50-414/98-13 on 980807-0915. Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Review Ice Condenser Related Problems,Which Led to Forced Shutdown IR 05000413/19980081998-09-14014 September 1998 Insp Repts 50-413/98-08 & 50-414/98-08 on 980705-0815. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000413/19980091998-08-26026 August 1998 Insp Repts 50-413/98-09 & 50-414/98-09 on 980816-0826. Examples of Two Apparent Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000413/19980071998-07-27027 July 1998 Insp Repts 50-413/98-07 & 50-414/98-07 on 980524-0704. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support,Including Physical Security IR 05000413/19980051998-06-22022 June 1998 Insp Repts 50-413/98-05 & 50-414/98-05 on 980412-0523.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19980061998-06-0505 June 1998 Insp Repts 50-413/98-06 & 50-414/98-06 on 980511-15. Violations Noted.Major Areas Inspected:Facts Surrounding Event Associated W/Degradation of CNS Unit Auxiliary Feedwater Sys During Rapid down-power on 980507 IR 05000413/19980031998-04-30030 April 1998 Insp Repts 50-413/98-03 & 50-414/98-03 on 980222-0411. Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Aspects of Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19980041998-04-20020 April 1998 Insp Repts 50-413/98-04 & 50-414/98-04 on 980302-06.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant ML20217G5661998-03-23023 March 1998 Insp Repts 50-413/98-01 & 50-414/98-01 on 980111-0221. Violations Noted.Major Areas Inspected:Operation,Maint, Engineering & Plant Support IR 05000413/19980021998-02-17017 February 1998 Partially Withheld Insp Repts 50-413/98-02 & 50-414/98-02 on 980112-13 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Plant Support,Including Malevolent Use of Vehicles at Plant ML20203L6301998-02-0909 February 1998 Insp Repts 50-413/97-15 & 50-414/97-15 on 971123-980110. Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support ML20197F2861997-12-19019 December 1997 Insp Repts 50-413/97-14 & 50-414/97-14 on 971012-1122. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19970121997-11-10010 November 1997 Insp Repts 50-413/97-12 & 50-414/97-12 on 970831-1011. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support as Well as Results of Announced Inspection by Regional Security Inspector IR 05000413/19970111997-09-26026 September 1997 Insp Repts 50-413/97-11 & 50-414/97-11 on 970720-0830. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19970101997-09-11011 September 1997 Insp Repts 50-413/97-10 & 50-414/97-10 on 970623-0731.No Violations Noted.Major Areas Inspected:Licensee Calculations,Analysis & Other Engineering Documents ML20210N7341997-08-18018 August 1997 Insp Repts 50-413/97-09 & 50-414/97-09 on 970608-0719. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20149F9291997-07-0707 July 1997 Insp Repts 50-413/97-08 & 50-414/97-08 on 970427-0607. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20148F9441997-05-23023 May 1997 Insp Repts 50-413/97-07 & 50-414/97-07 on 970323-0426. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19970051997-04-21021 April 1997 Integrated Insp Repts 50-413/97-05 & 50-414/97-05 on 970216- 0322.No Violations Identified.Major Areas Inspected:Maint, Operations,Engineering & Plant Support IR 05000413/19970061997-04-0404 April 1997 Insp Repts 50-413/97-06 & 50-414/97-06 on 970317-20.No Violations Noted.Major Areas Inspected:Conduct of Security & Safeguards Activities,Plant Support & Status of Security Facilities & Equipment ML20140B7631997-03-17017 March 1997 Insp Repts 50-413/97-03 & 50-414/97-03 on 970112-0215. Violations Noted.Major Areas Inspected:Licensee Operation, Maint,Engineering & Plant Support IR 05000413/19960191997-02-21021 February 1997 Insp Repts 50-413/96-19 & 50-414/96-19 on 961007, 961127, & 970206.Violation Noted.Major Areas inspected:in-office Review of Licensee Describing Changes to CNS UFSAR Re Lack of Circuit Breaker Coordination for 600-Vac IR 05000413/19960201997-02-10010 February 1997 Insp Repts 50-413/96-20 & 50-414/96-20 on 961201-970111.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19970041997-01-31031 January 1997 Insp Repts 50-413/97-04 & 50-414/97-04 on 970106-23.No Violations Noted.Major Areas Inspected:Operations & Engineering IR 05000413/19970021997-01-31031 January 1997 Insp Repts 50-413/97-02 & 50-414/97-02 on 970106-10.No Violations Noted.Major Areas Inspected:Plant Support IR 05000413/19960181996-12-30030 December 1996 Insp Repts 50-413/96-18 & 50-414/96-18 on 961020-1130.No Violations Noted.Major Areas Inspected:Operations,Maint & Engineering ML20135C2601996-11-15015 November 1996 Insp Repts 50-413/96-16 & 50-414/96-16 on 960908-1019.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19960151996-11-0707 November 1996 Insp Repts 50-413/96-15 & 50-414/96-15 on 960901-1012.No Violations Noted.Major Areas Inspected:Engineering & Plant Support IR 05000413/19960171996-11-0101 November 1996 Insp Repts 50-413/96-17 & 50-414/96-17 on 960930-1004.No Violations Noted.Major Areas Inspected:Plant Support ML20128R0951996-10-0707 October 1996 Insp Repts 50-413/96-13 & 50-414/96-13 on 960728-0907. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering,Plant Support & Plant Status ML20128J0391996-09-30030 September 1996 Insp Repts 50-413/96-12 & 50-414/96-12 on 960804-31. Violations Noted.Major Areas Inspected:Engineering, Summary of Plant Status & Observations & Findings IR 05000413/19940141994-06-0303 June 1994 Insp Repts 50-413/94-14 & 50-414/94-14 on 940509-20.No Violations Noted.Major Areas Inspected:Isi & Flow Assisted Corrosion IR 05000269/19930321994-01-0606 January 1994 Insp Repts 50-269/93-32,50-270/93-32,50-287/93-32, 50-369/93-31,50-370/93-31,50-413/93-35 & 50-414,respectively on 931213-17.Violations Noted.Major Areas Inpected:Licensee Safeguards Info Program to folow-up on Licensee Repts IR 05000413/19930321993-12-30030 December 1993 Insp Repts 50-413/93-32 & 50-414/93-32 on 931117-19 & 1129-1203.Violations Noted.Major Areas Inspected:Observation of Eddy Current (ET) Exam of SG Tubes,Inservice Activities Including Surface & Volumetric Exams,Review of Radiographs IR 05000413/19930331993-12-23023 December 1993 Insp Repts 50-413/93-33 & 50-414/93-33 on 931129-1203.No Violations Noted.Major Areas Inspected:Isi of Pipe Supports & Snubbers & TS Surveillance of Snubbers IR 05000413/19930311993-12-22022 December 1993 Insp Repts 50-413/93-31 & 50-414/93-31 on 931107-1204.No Violations Noted.Major Areas Inspected:Plant Operations, Maintenance,Engineering,Plant Support & follow-up of Previously Identifed Items IR 05000413/19930291993-12-12012 December 1993 Insp Repts 50-413/93-29 & 50-414/93-29 on 931115-19.No Violations Noted.Major Areas Inspected:Occupational Radiation Safety,Organization & Mgt Controls,Training & Qualification,Audits & Appraisals IR 05000413/19930281993-12-10010 December 1993 Insp Repts 50-413/93-28 & 50-414/93-28 on 931101-05.No Violations Noted.Deviation Noted.Major Areas Inspected: Adequacy of Licensee Programs,Procedures & Supporting Documentation for Implementation of Station Blackout Rule 1999-09-24
[Table view] Category:UTILITY
MONTHYEARIR 05000413/19900281990-10-26026 October 1990 Insp Repts 50-413/90-28 & 50-414/90-28 on 901001-04. Violations Noted.Major Areas Inspected:Physical Security Program for Power Reactors W/Emphasis on Compensatory Measures & Records & Repts IR 05000413/19900251990-10-11011 October 1990 Insp Rept 50-413/90-25 & 50-414/90-25 on 900924-28.No Violations Noted.Major Areas inspected:post-refueling Startup Tests for Both Units & Core Performance Surveillance Performed on Unit 2 IR 05000413/19900241990-09-27027 September 1990 Insp Repts 50-413/90-24 & 50-414/90-24 on 900803-0905. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Observation,Maint Observation,Review of LERs & Followup of Previously Identified Items IR 05000413/19900231990-09-10010 September 1990 Insp Repts 50-413/90-23 & 50-414/90-23 on 900730-0803.No Violations or Deviations Noted.Major Areas Inspected: Radiation Protection Program in Areas of Internal & External Exposure & Contamination Control & ALARA IR 05000413/19900191990-08-30030 August 1990 Insp Repts 50-413/90-19 & 50-414/90-19 on 900624-0802. Violations Noted.Major Areas Inspected:Plant Operations, Refueling Activities,Surveillance/Maint Observations,Review of LERs & Followup of Previously Identified Items IR 05000413/19900201990-08-28028 August 1990 Insp Repts 50-413/90-20 & 50-414/90-20 on 900724-26. Unresolved Item Identified.Major Areas Inspected: fitness-for-duty Program IR 05000413/19900221990-07-30030 July 1990 Insp Repts 50-413/90-22 & 50-414/90-22 on 900709-13.No Violations or Deviations Noted.Major Areas Inspected:Records Review of Maint Activities Following 5-yr Insp of Emergency Diesel Generator 2A & Review of Test Procedures IR 05000413/19900211990-07-19019 July 1990 Insp Repts 50-413/90-21 & 50-414/90-21 on 900627-29.No Violations or Deviations Noted.Major Areas Inspected:Main Steam Safety Relief Valve Setpoint Testing & Maint & Repair of Coatings on Steel Containment Vessel ML20056A5101990-07-19019 July 1990 Insp Repts 50-413/90-15 & 50-414/90-15 on 900527-0623. Violation Noted.One Noncited Violation Noted.Major Areas Inspected:Review of Plant Operations,Surveillance Observation & Maint Observation IR 05000413/19900181990-07-11011 July 1990 Insp Repts 50-413/90-18 & 50-414/90-18 on 900625-29.No Violations Noted.Major Areas Inspected:Inservice Insp & Maint,Including Plan for Outage,Reviews of NDE Procedures & Independent Exam of Verifications IR 05000413/19900161990-07-0909 July 1990 Insp Repts 50-413/90-16 & 50-414/90-16 on 900611-15. Violations Noted But Not Cited.Major Areas Inspected: Conformance to Reg Guide 1.97 & Instrumentation for Light water-cooled Nuclear Power Plants During Accidents IR 05000413/19900141990-06-13013 June 1990 Partially Withheld Physical Security Insp Repts 50-413/90-14 & 50-414/90-14 on 900521-25 (Ref 10CFR2.790(d) & 73.21).No Violations or Deviations Noted.Major Areas Inspected: Physical Barriers & Security Sys Power Supply IR 05000413/19890281989-10-10010 October 1989 Partially Withheld Insp Repts 50-413/89-28 & 50-414/89-28 on 890911-15 (Ref 10CFR2.790(d) & 73.21)Violations Noted.Major Areas Inspected:Mgt Support,Security Program Plans,Audits, Detection & Assessment Aids & Testing & Maint IR 05000413/19890251989-09-25025 September 1989 Insp Repts 50-413/89-25 & 50-414/89-25 on 890801-28 & 0912-15.Violations Being Considered for Enforcement.Major Areas Inspected:Two Events Re Overspeeding & Tripping of Auxiliary Feedwater Pump IR 05000413/19890261989-09-20020 September 1989 Insp Repts 50-413/89-26 & 50-414/89-26 on 890821-24.No Violations or Deviations Noted.One Unresolved Item Identified.Major Areas Inspected:Organization & Mgt Controls & Maintaining Radiation Exposures ALARA IR 05000413/19890241989-09-0707 September 1989 Insp Repts 50-413/89-24 & 50-414/89-24 on 890807-11.No Violations Noted.Major Areas Inspected:Physical Security Program for Program Power Reactors IR 05000413/19890221989-08-22022 August 1989 Insp Repts 50-413/89-22 & 50-414/89-22 on 890723-28.No Violations or Deviations Noted.Major Areas Inspected:Fire Protection & Followup on Previously Identified Insp Items IR 05000413/19890201989-08-11011 August 1989 Insp Repts 50-413/89-20 & 50-414/89-20 on 890717-21.No Violations or Deviations Noted.Major Areas Inspected:Environ Qualification of Electrical Equipment,Generic Ltr 83-28 & NRC Bulletins 88-001 & 88-003 IR 05000413/19890181989-08-11011 August 1989 Insp Repts 50-413/89-18 & 50-414/89-18 on 890717-21. Violation Re Turbine Bldg Sump Analyses Noted But Not Cited. Major Areas Inspected:Chemistry,Liquid Waste Controls & Previously Identified Inspector Followup Items IR 05000413/19890231989-08-0303 August 1989 Partially Withheld Insp Repts 50-413/89-23 & 50-414/89-23 on 890728 (Ref 10CFR2.790 & 73.21)).Violations Noted.Major Area Inspected:Security Event Logs ML20247R7511989-07-24024 July 1989 Insp Repts 50-413/89-16 & 50-414/89-16 on 890528-0701.Two Violations & One Deviation Noted.Major Areas Inspected:Plant Operations,Surveillance Observation,Maint Observation, Licensee Nonroutine Event Repts & Part 21 Insps IR 05000413/19890171989-07-13013 July 1989 Partially Withheld Insp Repts 50-413/89-17 & 40-414/89-17 on 890605-09.Violations Noted Re Protected Area Access Controls & Visitor Controls.Major Areas Inspected:Mgt Support, Security Program Plans & Audits & Physical Barriers IR 05000413/19890191989-07-13013 July 1989 Insp Repts 50-413/89-19 & 50-414/89-19 on 890616-0628. Violations Noted.Major Areas inspected:890616 Event Re Channels of Reactor Vessel Level Instrumentation Sys Inoperable for Period of Time in Excess of Tech Specs ML20246P7321989-07-10010 July 1989 Insp Repts 50-413/89-09 & 50-414/89-09 on 890410-0505. Violations Noted.Major Areas Inspected:Various Plant Groups Including Operations,Maint,Qa,Engineering & Training in Support of Safe Plant Operations IR 05000413/19890151989-06-27027 June 1989 Insp Repts 50-413/89-15 & 50-414/89-15 on 890430-0527. Violation Noted Re Failure to Meet Overtime Restriction Requirements & Unlocked Valves.Major Areas Inspected:Plant Operations,Surveillance & Maint Observations & Plant Mods IR 05000413/19890131989-06-27027 June 1989 Insp Repts 50-413/89-13 & 50-414/89-13 on 890326-0429. Violations Noted.Major Areas Inspected:Review of Plant Operations,Surveillance Observation,Maint Observation & Review of Licensee Nonroutine Event Repts IR 05000413/19890121989-06-0606 June 1989 Corrected Page to Insp Repts 50-413/89-12 & 50-414/89-12. No Violations or Deviations Noted.Major Area Inspected: Annual Radiological Emergency Response Exercise on 890427 ML20245F3421989-05-23023 May 1989 Insp Repts 50-413/89-12 & 50-414/89-12 on 890425-28.No Violations or Deviations Noted.Major Areas Inspected: Observation & Evaluation of Annual Radiological Emergency Response Exercise IR 05000413/19890111989-05-18018 May 1989 Insp Repts 50-413/89-11 & 50-414/89-11 on 890417-21.No Violations or Deviations Noted.Major Areas Inspected: Radiation Protection Activities During Extended Outages & Control of Radioactive Matls & Surveys IR 05000413/19890101989-05-0202 May 1989 Insp Repts 50-413/89-10 & 50-414/89-10 on 890403-07 & 13. Violations Noted.Major Areas Inspected:Liquid & Gaseous Radwaste,Plant Chemistry,Environ Monitoring,Confirmatory Measurements & Followup on Previously Identified Items IR 05000413/19890071989-04-20020 April 1989 Insp Repts 50-413/89-07 & 50-414/89-07 on 890226-0325. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Observation,Maint Observation & Review of Licensee Nonroutine Event Rept IR 05000413/19890081989-04-19019 April 1989 Insp Repts 50-413/89-08 & 50-414/89-08 on 890313-14,16-17 & 27-31.No Violations or Deviations Noted.Major Areas Inspected:Inservice Insp Program Implementing Procedures, Reviews of NDE Procedures & Personnel Qualifications ML20244A8991989-03-29029 March 1989 Insp Repts 50-413/89-05 & 50-414/89-05 on 890204-25. Violations Noted.Major Areas Inspected:Review of Plant Operations,Surveillance Observation,Maint Observation & Review of Nonroutine Event Repts IR 05000413/19890041989-03-13013 March 1989 Insp Repts 50-413/89-04 & 50-414/89-04 on 890213-17.No Violations or Deviations Noted.Major Areas Inspected: Emergency Preparedness Program to Determine If Program Maintained in State of Operational Readiness Re Emergencies ML20246L6721989-03-0303 March 1989 Insp Repts 50-413/89-02 & 50-414/89-02 on 890130-0203. Violations Noted.Major Areas Inspected:Preoutage Planning, Preparations & Mgt Support for Implementing Licensee Radiation Protection Program ML20236A2241989-02-25025 February 1989 Resident Insp Repts 50-413/88-38 & 50-414/88-38 on 881127-890204.One Strength,One Weakness & One Apparent Violation Identified.Major Areas Inspected:Plant Operations, Surveillance Testing,Maint Observation & Procedures Review IR 05000413/19890031989-02-23023 February 1989 Insp Repts 50-413/89-03 & 50-414/89-03 on 890130-0203.One Weakness Identified Re Photomultiplier Tube.Major Areas Inspected:Design Changes,Plant Mods & Licensee Action on Previously Identified Insp Findings ML20206J5961988-11-15015 November 1988 Insp Repts 50-413/88-34 & 50-414/88-34 on 880926-1025. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Observation,Maint Observation & Review of Licensee Nonroutine Event Repts IR 05000413/19880331988-10-14014 October 1988 Insp Repts 50-413/88-33 & 50-414/88-33 on 880826-0925. Violations Noted.Major Areas Inspected:Review of Plant Operations,Surveillance Observation,Maint Observation & Review of Licensee Nonroutine Event Repts IR 05000413/19880301988-09-20020 September 1988 Insp Repts 50-413/88-30 & 50-414/88-30 on 880726-0826.No Violations Noted.Major Areas Inspected:Review of Plant Operations,Surveillance Observation,Maint Observation,Review of Licensee Nonroutine Event Repts & Part 21 Repts IR 05000413/19880271988-09-0909 September 1988 Insp Repts 50-413/88-27 & 50-414/88-27 on 880719-22. Violations Noted.Major Areas Inspected:Radiation Protection, Including Organization & Mgt Controls,Solid Waste Program, Transportation & Licensee Action on Previous Insp Findings IR 05000414/19880311988-09-0808 September 1988 Partially Withheld Insp Repts 50-413/888-31& 50-414/88-31 on 880815-19 (Ref 10CFR2.790 & 73.21).No inspector-identified Violations or Deviations Noted.Major Areas Inspected:Testing & Maint & Physical Barriers - Protected Area ML20154E9461988-09-0606 September 1988 Page 11 to Insp Repts 50-413/88-25 & 50-414/88-25 IR 05000413/19880261988-09-0202 September 1988 Insp Repts 50-413/88-26 & 50-414/88-26 on 880801-05.No Violations Noted.Major Areas Inspected:Qa & Confirmatory Measurements for in-plant Radiochemcial Analysis ML20154A6241988-08-31031 August 1988 Insp Repts 50-413/88-29 & 50-414/88-29 on 880801-05. Violation Noted.Major Areas Inspected:Areas of Catawba Safety Review Group Activities & 10CFR21 Reportability Determinations IR 05000413/19880281988-08-23023 August 1988 Insp Repts 50-413/88-28 & 50-414/88-28 on 880725-29.No Violations or Deviations Noted.Major Areas Inspected:Liquid & Gaseous Waste Mgt,Effluent Sampling,Monitoring & Analysis & Radiological Environ Monitoring ML20153C5451988-08-19019 August 1988 Insp Repts 50-413/88-25 & 50-414/88-25 on 880626-0725. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance & Maint Observations,Review of LERs & Followup of Previously Identified Items & NRC Bulletins ML20151E5681988-07-0808 July 1988 Insp Repts 50-413/88-22 & 50-414/88-22 on 880526-0625. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance & Maint Observations,Review of Licensee Nonroutine Event Repts & Previously Identified Items IR 05000413/19880231988-06-22022 June 1988 Partially Withheld Insp Repts 50-413/88-23 & 50-414/88-23 on 880607-10.Violation Noted.Major Areas Inspected:Security Plan & Implementing Procedures,Mgt Effectiveness,Security Program & Organization,Records & Repts & Alarm Stations IR 05000413/19880191988-06-21021 June 1988 Insp Repts 50-413/88-19 & 50-414/88-19 on 880517-20 & 0603. No Violations or Deviations Noted.Major Areas Inspected: Emergency Plan & Implementing Procedures,Emergency Facilities & Organization & Mgt Control 1990-09-27
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000413/19993021999-10-12012 October 1999 NRC Operator Licensing Retake Exam Repts 50-413/99-302 & 50-414/99-302 (Including Completed & Graded Tests) for Tests Administered on 990921-23.Two Out of Three RO Candidates & One SRO Passed Retake Exam IR 05000413/19993011999-09-30030 September 1999 NRC Operator Licensing Exam Repts 50-413/99-301 & 50-414/99-301 (Including Completed & Graded Tests) for Tests Administered on 990524-27,0603,07-10 & 16.Eight of Fourteen Applicants Passed Exam IR 05000413/19990051999-09-24024 September 1999 Insp Repts 50-413/99-05 & 50-414/99-05 on 990718-0828. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19990041999-08-13013 August 1999 Insp Repts 50-413/99-04 & 50-414/99-04 on 990606-0717. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20210H2211999-07-22022 July 1999 Notice of Violation from Insp on 990314-0424.Violation Noted:Sss Was Not Inoperable for Thirteen Days Because Electrical Breakers Associated with SSS Motor Control Ctr Were Mispositioned ML20209E2831999-07-0101 July 1999 Insp Repts 50-413/99-03 & 50-414/99-03 on 990425-0605. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000413/19990111999-06-0202 June 1999 Insp Repts 50-413/99-11 & 50-414/99-11 on 990422-23 & 0503. No Violations Noted.Major Areas Inspected:Licensee Identified Frost & Ice Buildup Which Affected Unit 1 Ice Condenser Lower Inlet Doors IR 05000413/19990021999-05-20020 May 1999 Insp Repts 50-413/99-02 & 50-414/99-02 on 990314-0424.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support PNO-II-99-017, on 990515,indication of Main Generator Ground Fault Was Received While Performing Turbine Startup in Preparation for Placing Unit on Line.Licensee Is Conducting Investigation to Determine Actual Cause of Ground1999-05-18018 May 1999 PNO-II-99-017:on 990515,indication of Main Generator Ground Fault Was Received While Performing Turbine Startup in Preparation for Placing Unit on Line.Licensee Is Conducting Investigation to Determine Actual Cause of Ground ML20206U4161999-05-10010 May 1999 Insp Repts 50-413/99-10 & 50-414/99-10 on 990314-0424. Violation Being Considered for Escalated Enforcement Action Noted.Major Areas Inspected:Operations PNO-II-99-015, on 990503,shutdown in Excess of 72 H Occurred. Licensee Is Still Conducting Investigation Into Cause of Main Generator Protection Lockout & Making Preparations to Inspect & Remove Any Excessive Fouling from Inside Afws1999-05-0505 May 1999 PNO-II-99-015:on 990503,shutdown in Excess of 72 H Occurred. Licensee Is Still Conducting Investigation Into Cause of Main Generator Protection Lockout & Making Preparations to Inspect & Remove Any Excessive Fouling from Inside Afws IR 05000413/19990011999-04-0606 April 1999 Insp Repts 50-413/99-01 & 50-414/99-01 on 990124-0313. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20207A5881999-02-17017 February 1999 Notice of Violation from Insp on 981213-990123.Violation Noted:Licensee Made Change to Procedures as Described in Updated Final Safety Analysis Rept & Failed to Perform Written Safety Evaluation IR 05000413/19980121999-02-17017 February 1999 Insp Repts 50-413/98-12 & 50-414/98-12 on 981213-990123. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19980111999-01-11011 January 1999 Insp Repts 50-413/98-11 & 50-414/98-11 on 981101-1212.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19980151999-01-0404 January 1999 Insp Repts 50-413/98-15 & 50-414/98-15 on 981102-06 & 16-20. No Violations Noted.Major Areas Inspected:Licensee Corrective Action Program by Sampling Activities Defined in Nuclear Sys Directive 210,rev 1 IR 05000413/19980161998-12-0404 December 1998 Insp Repts 50-413/98-16 & 50-414/98-16 on 980915-1101.No Violations Rept Encl.Major Areas Inspected:Licensee Maint, Surveillance & Engineering Programs Involving Unit 2 Ice Condenser IR 05000413/19980101998-11-23023 November 1998 Insp Repts 50-413/98-10 & 50-414/98-10 on 980927-1031.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering & Plant Support ML20155B3821998-10-19019 October 1998 Insp Repts 50-413/98-13 & 50-414/98-13 on 980807-0915. Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Review Ice Condenser Related Problems,Which Led to Forced Shutdown ML20154C4301998-09-14014 September 1998 Notice of Violation from Insp on 980705-0815.Violation Noted:Licensee Failed to Establish Adequate Surveillance Procedures IR 05000413/19980081998-09-14014 September 1998 Insp Repts 50-413/98-08 & 50-414/98-08 on 980705-0815. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering PNO-II-98-037A, on 980807,update Shutdown in Excess of 72 H Made.Licensee Has Cleaned & Satisfactorily Inspected IC Flow Channels.Licensee Identified Discrepancies in Bolting of IC Intermediate Deck Door Frames & Hinges.Conditions Addressed1998-08-28028 August 1998 PNO-II-98-037A:on 980807,update Shutdown in Excess of 72 H Made.Licensee Has Cleaned & Satisfactorily Inspected IC Flow Channels.Licensee Identified Discrepancies in Bolting of IC Intermediate Deck Door Frames & Hinges.Conditions Addressed IR 05000413/19980091998-08-26026 August 1998 Insp Repts 50-413/98-09 & 50-414/98-09 on 980816-0826. Examples of Two Apparent Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support PNO-II-98-037, on 980808,shutdown in Excess of 72 H Occurred. Licensee Inspected Approximately Half of Unit 2 Ice Condenser Bay Flow Channels from Intermediate Deck W/No Ice Obstructions in Excess of TS Limit Identified1998-08-10010 August 1998 PNO-II-98-037:on 980808,shutdown in Excess of 72 H Occurred. Licensee Inspected Approximately Half of Unit 2 Ice Condenser Bay Flow Channels from Intermediate Deck W/No Ice Obstructions in Excess of TS Limit Identified ML20236V7351998-07-27027 July 1998 Notice of Violation from Insp on 980524-0704.Violation Noted:Licensee Failed to Identify & Take Prompt C/A Following Unit 1 Upper Surge Tank over-temp Events on 960120,980111 & 0507 IR 05000413/19980071998-07-27027 July 1998 Insp Repts 50-413/98-07 & 50-414/98-07 on 980524-0704. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support,Including Physical Security IR 05000413/19980051998-06-22022 June 1998 Insp Repts 50-413/98-05 & 50-414/98-05 on 980412-0523.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20236J7471998-06-11011 June 1998 Notice of Violation from Insp on 980222-0411.Violation Noted:Adminstrative & Surveillance Procedures Not Implemented as Evidenced by Listed Examples IR 05000413/19980061998-06-0505 June 1998 Insp Repts 50-413/98-06 & 50-414/98-06 on 980511-15. Violations Noted.Major Areas Inspected:Facts Surrounding Event Associated W/Degradation of CNS Unit Auxiliary Feedwater Sys During Rapid down-power on 980507 PNO-II-98-025, on 980507,AFW Sys Declared Inoperable.Licensee Isolated Valves 1CM-127 & 2CM-127 in Units 1 & 2, Respectively,To Prevent Recurrence Until Permanent Corrective Actions Can Be Developed1998-05-11011 May 1998 PNO-II-98-025:on 980507,AFW Sys Declared Inoperable.Licensee Isolated Valves 1CM-127 & 2CM-127 in Units 1 & 2, Respectively,To Prevent Recurrence Until Permanent Corrective Actions Can Be Developed IR 05000413/19980031998-04-30030 April 1998 Insp Repts 50-413/98-03 & 50-414/98-03 on 980222-0411. Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Aspects of Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19980041998-04-20020 April 1998 Insp Repts 50-413/98-04 & 50-414/98-04 on 980302-06.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant ML20217G5661998-03-23023 March 1998 Insp Repts 50-413/98-01 & 50-414/98-01 on 980111-0221. Violations Noted.Major Areas Inspected:Operation,Maint, Engineering & Plant Support ML20217G5551998-03-23023 March 1998 Notice of Violation from Insp on 980111-0221.Violation Noted:Licensee Failed to Perform Written Safety Evaluation for Closing Valves 1CA-6 & 2CA-6 IR 05000413/19980021998-02-17017 February 1998 Partially Withheld Insp Repts 50-413/98-02 & 50-414/98-02 on 980112-13 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Plant Support,Including Malevolent Use of Vehicles at Plant ML20203L6301998-02-0909 February 1998 Insp Repts 50-413/97-15 & 50-414/97-15 on 971123-980110. Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support ML20203L6251998-02-0909 February 1998 Notice of Violation from Insp on 971123-980110.Violation Noted:Changes to Radiological Conditions in 1B Residual Heat Removal Pump Room Not Logged to Reflect Changes in Dress Requirements ML20199L6301998-02-0202 February 1998 Notice of Violation from Insp & Exam on 971117-21 & 971201-19.Violation Noted:As of 971219,selected Officers from Site Security Force Had Not Been Retrained to Perform non-licensed Operator Emergency Tasks for Starting Ssf PNO-II-97-066, on 971230,RCS Leakage Requiring Forced Unit Cooldown Occurred.No Radioactive Release Outside of Reactor Containment Facilities Due to Leakage.Licensee Informed States on Nc & Sc1997-12-31031 December 1997 PNO-II-97-066:on 971230,RCS Leakage Requiring Forced Unit Cooldown Occurred.No Radioactive Release Outside of Reactor Containment Facilities Due to Leakage.Licensee Informed States on Nc & Sc PNO-II-97-064, on 971229,inadvertent Safety Injection Occurred Due to Operators Failing to Perform Step Which Resulted in Cold Leg Injection Valve Being Left Open. Licensee Engineers Performing Evaluation1997-12-29029 December 1997 PNO-II-97-064:on 971229,inadvertent Safety Injection Occurred Due to Operators Failing to Perform Step Which Resulted in Cold Leg Injection Valve Being Left Open. Licensee Engineers Performing Evaluation ML20197F2481997-12-19019 December 1997 Notice of Violation from Insp on 971012-1122.Violation Noted:Licensee Failed to Follow Radiation Protection Procedures in That,Current Radiation Dose Rates Were Not on Vacuum Cleaner Label as Required IR 05000414/19970081997-12-19019 December 1997 Notice of Deviation from Insp on 971012-1122.Deviation Noted:On 971020,licensee Had Not Performed Alarm Set Point Adjustment Evaluation Discussed in Violation 50-414/97-08-01 ML20197F2861997-12-19019 December 1997 Insp Repts 50-413/97-14 & 50-414/97-14 on 971012-1122. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20199G0351997-11-10010 November 1997 Notice of Violation from Insp on 970831-1011.Violations Noted:Licensee Failed to Follow Procedures for Security Badge Access Control as Evidenced.On 970909,security Failed to Destroy & Unassign Access Badge of Terminated Individual IR 05000413/19970121997-11-10010 November 1997 Insp Repts 50-413/97-12 & 50-414/97-12 on 970831-1011. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support as Well as Results of Announced Inspection by Regional Security Inspector ML20211L3051997-09-26026 September 1997 Notice of Violation from Insp on 970720-0830.Violation Noted:On 970727,technician Failed to Correctly Review Drawing Number CNEE-2792-01.02,connection Diagram,Main Steam Sys Terminal Cabinet 2SMTC1,rev 12 IR 05000413/19970111997-09-26026 September 1997 Insp Repts 50-413/97-11 & 50-414/97-11 on 970720-0830. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19970101997-09-11011 September 1997 Insp Repts 50-413/97-10 & 50-414/97-10 on 970623-0731.No Violations Noted.Major Areas Inspected:Licensee Calculations,Analysis & Other Engineering Documents ML20210N7341997-08-18018 August 1997 Insp Repts 50-413/97-09 & 50-414/97-09 on 970608-0719. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20210N7111997-08-18018 August 1997 Notice of Violation from Insp on 970608-0719.Violation Noted:On 970424,operations Test Group Technician Failed to Open Valve 2NV-873 as Required by Step 2.2.3 of PT/2/A/4200/01C,resulting in Closed Test Vent Flowpath 1999-09-30
[Table view] |
Inspection Report - Catawba - 1985019 |
---|
|
|
Text
..
p Klov UNITED STATES
'o NUCLEAR REGULATORY COMMISSION
_[" , REGION 11 g ,j 101 MARIETTA STREET, * ATLANTA, GEORGI A 30323
"%..... /
.
Report No.: 50-413/85-19 Licensee: Duke Power Company 422 South Church Street Charlotte, NC 28242 Docket No.: 50-413 License No.: NPF-35 Facility Name: Catawba 1 Inspection Conducted: May 13-17, 1985 Inspecter: .1 he 6 13 M M. F. Runyan \ Date Signed Accompanying Personnel: R. M. Latta Region II Approved by: [N4 [ [ I C. M. Uprig Secff6n Chief Dat/e Si/gned Division of act & Safety SUMMARY Scope: This routine, unannounced inspection involved 68 inspector-hours on site in the areas of procurement; receipt, storage, and handling of equipment and material; surveillance testing and calibration control; and measuring and test equipment (M&TE) progra Results: No violations or deviations were identifie ~
8507110030 850610 PDR ADOCK 05000413 G PDR I
.- .
REPORT DETAILS Persons Contacted Licensee Employees
- H. L. Atkins, Project QA Engineer, Mechanical
- F. Beaver, Performance Engineering W. H. Bradley, Surveillance Supervisor D. Brown, Support Technician R. Carpenter, Materials Supervisor R. Correll, Materials Supervisor
- J. W. Cox, Technical Senior Supervisor
- L. R. Davison, Project QA Manager
- J. W. Hampton, Site Manager C. L. Hartzell, Compliance Engineer R. Johnson, I&E Technician
- R. A. Jones, Performance Engineer R. Kaye, Technical Specialist, Maintenance
- L. Keener, QA Surveillance Specialist
- P. G. Leroy, Licensing Engineer D. S. Miller, QA Specialist
- D. R. Rogers, I&E Engineer M. Sahms, Test Supervisor, Performance J. Stackley, I&E Support Engineer Z. Taylor, Associate Engineer, Test Group, Performance J. Teofilak, Junior Engineer, Operations W. Truesdale, I&E Supervisor
- E. G. Williams, Project QA Technician J. Williams, Mechanical Maintenance Supervisor J. W. Willis, Senior QA Engineer Other licensee employees contacted included technicians and office personne NRC Resident Inspector
- P. H. Skinner, Senior Resident
- Attended exit interview Exit Interview The inspection scope and findings were summarized on May 17, 1985, with those persons indicated in paragraph 1 above. The licensee did not identify as proprietary any of the materials provided to or reviewed by the inspector during this inspection. The inspector described the areas inspected and discussed in detail the inspection findings listed belo __
. .
Inspector Followup Item: Environmental Controls for Calibration of M&TE in the I&E Shop, paragraph Inspector Followup Item: Promptness of Evaluations of Out-of-Tolerance M&TE, paragraph . Licensee Action on Previous Enforcement Matters This subject was not addressed in the inspectio . Procurement (35746,38701)
References: (a) 19 CFR 50, Appendix B, Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants (b) Regulatory Guide 1.33, Quality Assurance Program Requirements (Operations)
(c) ANSI N45.2-1971, Quality Assurance Program Requirements for Nuclear Power Plants (d) Regulatory Guide 1.123, Quality Assurance Requirements for Control of Procurement of Items and Services for Nuclear Power Plants (e) ANSI N45.2.13-1976, Quality Assurance Requirements for Control of Procurement of Items and Services for Nuclear power Plants (f) ANSI N18.7-1976, Quality Assurance for the Operational Phase of Nuclear Power Plants (g) Duke Topical Report, Section 17.2, Amendment 8, Opera-tion Quality Assurance (h) Technical Specifications Section 6 Selected elements of the documents listed below were reviewed during this inspection to determine whether the procurement program is being implemented as specified by procedure Duke Power Company Policy Statement dated September 19, 1984 Administrative Policy Manual, Section 2.4, Control of Material, Parts, and Components, Revision 2 Administrative Policy Manual, Section 4.5, Administrative Instructions for Purchase Specifications, Revision 21 PR-301, Specifications, Revision 23 PR-302, Procurement, Revision 30
.
. .
PR-303, Procurement of Services, Revision 14 PR-360, Transfer of Items, Revision 6 PR-930, Supplier QA Records, Revision 8 QA-601, Vendor Evaluation, Revision 5 QA-602, Vendor Surveillance Procedure, Revision 0 Quality Standard Manual for Structures, Systems, and Components dated February 20, 1985 SD-1.5.1, Administration of the Manual. Revision 5 SD-2.4.1, Purchase of Materials, Labor, and Services, Revision 12 SD-2.4.3, Control of Material, Parts, and Components, Original Revision 50-2.9.2, Control of Purchased Services, Revision 2 SD-3.3.1, Determination of Safety-Related or Control Designated Structures, Systems, and Components, Revision 2 SD-4.5.1, Development of Purchase Specifications, Original Revision QA-121, Nuclear Regulatory Commission Reporting Requirements, Revision 7 QA-410, Processing of QA Records for Purchased Items, Revision 11 QA-411, Filing of QA Records for Purchased Items, Revision 11 QA-601, Vendor Evaluation, Revision 8 QA-602, Vendor Surveillance Procedure, Revision 8 QA-605, Vendor QA Releases, Revision 2 The inspector interviewed personnel and examined procurement documents to determine if the licensee and vendors had implemented the above procedural requirements during the initiation, review, approval, and processing of procurement documents. The documents listed below were examined:
Approved Vendors List dated April 1985 Electrical Engineering Standard Stock List, Revision 1 Civil Engineering Standard Stock List, Revision 6 Purchase Order N Quality Level J-53338 (Turbine Driven AFW Pump Parts) 1 G-8293 (Radiation Monitor Spares) 2 H-14754 (RCP Internal Parts) 1 J-21378 (Charging Pump Parts) 1 K-39938 (ITT Grinnell 2" Diaphragm Valve Parts) 1 F-32602 (Dragon %" Instrument Isolation Valve Parts) 2 9969 (Voltage Regulator Indicators) 1 H-14289 (RCP Rotor Shaft Assembly) 1 The following site QA surveillance reports were reviewed to determine the effectiveness of the QA Program for procurement contro Report Number Area Inspected CN-84-14 Issuance Control (Repair of Items for Return to Stock)
CN-84-23 Materials, Parts and Component Control
. _
,-
. .
,
[ .pt 4
, t
, (7 Report Number Area Inspected
.
j CN-84-35 Requisitions, P0s, and Specifications,
-
r (Q$ Review of Approved Vendors Li st,
.4'<
Record Control and Retention)
CN-84-40 Inspector Qualifications, Training, and l ,
, Receipt Inspection CN-84-62 , Issue Control (Administrative)
-
. .,
- These surveillance reports appeared complete and documented corrective actions indicate adequate responses from the audited organization n In addition to reviewing the referenced site QA surveillances, two recent corporate QA audits were also examined,and are listed below:
~
>
y .
l Report Number Area Inspected
{
'
NP-84-22 (CN) Operatione and Maintenance Activities
" NP-85-3 (CQA) Operations Quality Assurance Program
Activities
.
, The referenced QA audits cover a wide range of plant operations; however,
's they addressed areas of concern to procurement. The pertinent topics
i' concerned maintenance material control and mill test report items. The
\l audit findings ,of these areas appeared to be ec4nplete and the program controls administered were in agreement with tne requirement Within this area,,no vielation,s v deviations were identifie , t > Receipt, Storage, and Handling of Equipment and Materials (35747, 38702)
References: (a) '10 CFR 50, Appendi3 3, Quality Assurance Criteria for Nuclear Power Pled <
(b) 10'CFR 50, P. - 7 Reporting of Defects and Noncom-p?iance 1 (c) Regulatory Guide 1.38, Quality Assurance Requirements for Packaging, Shipping, Receiving, Storage, and
, Handling of Items for Nuclear Power Plants (d) ANSI N45 J.2-1972, Packaging, Shipping, Receiving, 1 Storage, and' Handling of Items for Nuchar Power Plants
.c- ,
(e) Regulatory _ Guide 21.33, Quality Assurance Program Requirements (Operations)
-
i
. .
(f) ANSI N18.7, Administrative Controls and Quality Assurance for the Operational Phase of Nuclear Power Plants (g) Duke Power Company Topical Report, Quality Assurance Program, DUKE-1-A, Amendment 8, Section 1 The following licensee documents were examined to verify that selected elements of receipt inspections, handling, storage, maintenance, and protection of reactor plant items are being implemented as specified by procedures:
Administrative Policy Section 2.4, Control of Material, Parts, and Components, Revision 21 QCG-1, Receipt, Inspection, and Control of QA Condition Materials, Parts, and Components, Revision 22 QCG-3, Inspection of Items in Storage, Revision 1 QCK-1, Control of Nonconforming Items, Revision 18 MHP-1.5, Confirmation of Purchase Orders, Revision 2 MHP-1.7, Control of Material Transfers, Revision 2 MHP-2.1, Inspection and Control of Stores Stock, Revision 3 MHP-2.3, On Site Certification of Items, Revision 3 MHP-3.1, Storage Methods and Areas, Revision 5 MHP-3.2, Shelf Life Program, Revision 1 i
MHP-5.1, Issuing and Returning Material, Revision 8 MHP-6.1, Repaired, Salvaged Items, Revision 4 MHP-7.1, Warehouse Temperature and Humidity Measurements, Revision 2 PM/IG-017, Motors in Storage, Revision 3 CNSD-2.4.3 (M), Control of Materials, Parts, and Components, Revision Original CNSD-2.4.1 (M), Purchasing of Material, Labor, and Services, Revision 12
. .
To verify implementation, the inspector examined procurement documentation associated with five recently processed purchase orders. These P0s covered mechanical, electrical, and electronic item This examination verified that procurement documentation had been prepared as required by licensee procedures, quality release forms had been prepared, vendors were approved, certificates of compliance had been submitted, receiving inspections had been performed, and parts were identified and stored as specified in the reference procedures. The following purchase order packages were selected at random and examined:
.
Purchase Order Number Quality Level K-12534 (Delaval Relief Value) 1 J-48474 (Westinghouse Switch) 1 K-07724 (Solid State Controls, Volt Meter) 1 J-30001 (American Airfilter, Element) 2 K-08543 (Dixie Bearings, Grease) 1 These safety-related items which had limited shelf life controls were also examined in the material control storeroom to verify that they were maintained in accordance with administrative control The following P0 packages correspond to the selected items:
Purchase Order Number Quality Level K-06592 (ITT Barton, 0-Rings) 1 K-06120 (Prespray Corp., Seal) 1 M-14064 (Foam Semkits, RTV Silicone) 3 The inspector performed a physical inspection of the storeroom to observe and verify the location of equipment, tagging and identification practices, housekeeping, segregation of items, and packaging and storage method Related discussions with storeroom personnel and observation of work activities revealed that these individuals appeared cognizant of their responsibilities and were performing receiving inspection activities as required by procedure Within this area, no violations or deviations were identifie . Surveillance Testing and Calibration Control (35745, 61725)
References: (a) 10 CFR 50, Appendix B, Quality Assurance Criteria for
.1..: lear Power Plants and Fuel Reprocessing Plants (b) Regulatory Guide 1.33, Quality Assurance Program Requirements (Operations), Revision 2
.
(c) ANSI N18.7-1976, Administrative Controls and Quality Assurance for the Operational Phase of Nuclear Power Plants (d) Technical Specifications, Section 4 The documents listed below were reviewed to determine whether selected elements of the surveillance testing and calibration control program are being implemented as specified by procedure APM, Section 3.2, Testing, Revision 21 Quality Control Procedures Manual QC K-1, Control of Nonconforming Items, Revision 18 QC L-5, Control of Preservice and Inservice Inspection Activities, Revision 6 SD 3.2.1, Development and Conduct of the Preoperational Testing Program, Revision 4 SD 3.2.2, Development and Conduct of the Periodic Testing Program,
'
Revision 8 SD 4.2.1, Development, Approval, and Use of 5tation Procedures, Revision 16 The following site QA surveillance reports were reviewed to gain a perspective of the program's current status:
CN-84-36, Station Testing, Operations Testing, August 14, 1984 CN-84-42, Station Testing, Performance Testing, August 20, 1984 CN-84-45, Station Testing, Chemistry Testing, September 14, 1984 CN-84-47, Station Testing, I&E Periodic Testing, October 1, 1984 CN-85-02, Station Testing, Maintenance, Health Physics Periodic Testing, January 17, 1985 CN-85-10, Station Testing, Operations Testing, February 26, 1985 CN-85-13, Station Testing, Performance Testing, March 26, 1985 Deficiencies identified in these reports included incorrect scheduling dates on the master schedule, incorrect documentation of the necessity to delete steps in a procedure, problems with procedure changes, and incomplete documentation of certain procedure steps. These problems are apparently circumstantial in nature rather than programmatic or systematic and are being corrected in an expeditious manne Corporate QA audits address many areas within specific plant group The following audits contained inspection of at least some aspect of the surveillance testing and calibration program:
NP-84-2 (CN), Administrative Services and Maintenance, February 20, 1984 NP-84-9 (CN), Operations and Technical Services Activities, June 11, 1984
,
,
,y , _-._,-.m, _ , - - . . - , - - ~ . . e
. .
NP-84-17 (CN), Technical Services and Administrative Services Activities, October 30, 1984 NP-84-22 (CN), Operations and Maintenance Activities, December 19, 1984 NP-85-2 (CN), Administrative Services and Maintenance Activities, February 12, 1985 The most significant program error identified in these audits was a surveillance test data base discrepancy resulting from a recent system conversion. This has been corrected and the licensee is making satisfactory progress in closing other audit finding '
The computerized surveillance test schedule provides a complete status for each required test including procedure number, responsible group, test frequency, next scheduled date, latest permissible date, and previous performance date Though this is used as a scheduling device for the Instrument and Electric (I&E) and Maintenance groups, other groups such as Operations and Performance use an independent internal system. Each group is ultimately responsible for ensuring that their assigned tests are completed in accordance with the Technical Specifications (TS). The test group within performance has secondary responsibility in this area on a plant-wide basi The completeness and accuracy of the surveillance test data base is essential to the proper execution of the progra The following twenty TS requirements were chosen at random to verify that each test has been scheduled in accordance with the TS:
TS Test Description Frequency 4.1.1. Reactor Water Makeup Pump Operability 18 months 4.1.2. Charging Pumps Demonstrated Inoperable 1 month Tc <285*
4.2. Target Flux Difference Update 31 EFPD 4.2. Reactor Coolant System Flow Rate 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Table 4.3-1 Overpower AT Analog Channel Operational 1 month (8) Test Table 4.3-1 Pressurizer Pressure - High, Channel 18 months (10) Calibration 4.4. Pressurizer Heater Capacity 3 months 4.4. Power Operated Relief Valve Operability 18 months 4.5. Verify ECCS Piping Full 1 month 4. Refueling Water Storage Tank Operability 7 days 4.6.1. Containment Air Lock Operability 6 months 4.6.5. Refueling Canal Drain Operability 3 months 4.7.1. Auxiliary Feed Pump Operability 1 month 4.7.1. Auxiliary Feed Flow Path to Steam Generator 1 month in Cold Shutdown 4.8.1. Circuit Check Between Offsite and Auxiliary 7 days Power Systems
__ _ .
_ _- -
. .
!
9 '
4.8. AC Buses Energized Properly 7 days 4.9.4. Reactor Building Containment Purge System 1 month Operability 4.11. Liquid Effluent Dose Calculation 1 month 4.11.2. Gaseous Effluent Dose Calculation 1 month 4.1 Land Use Census 1 year Each of the above tests were scheduled at the correct frequency. Informa-tion provided by the data base indicated that the tests were being performed at these frequencies and in accordance with TS restrictions concerning interval extension The licensee is required to establish a calibration program for in plant process instruments associated with safety-related systems but which are not specified in the TS as requiring calibration. The licensee's calibration program was recently cited by the resident inspector for several deficien-cies including the failure to evaluate previous test results measured from an instrument subsequently found out of calibration. The following plant instruments were selected at random from several surveillance test procedures to ensure their inclusion in the calibration program:
INDPG 5041 Residual Heat Removal Pump Discharge Flow INDPG 5060 Residual Heat Removal Pump Discharge Temperature INIPG 5231 Safety Injection Pump Suction Pressure INIPG 5310 Safety Injection Pump Discharge Pressure INSPG 5100 Containment Spray Pump Suction Pressure INSPG 5080 Containment Spray Pump Discharge Pressure INSPG 5120 Containment Spray Pump Flow Rate The above instruments were scheduled for calibration at a specified frequency and were currently calibrated in accordance with this schedul The following surveillance test work packages were reviewed as a check of program implementation:
- PT/1/A/4200/05A-00 Safety Injection Pump 1A Performance, January 25, 1985
i
. .
IP/1/A/3121/14-00 Pressurizer Power-Operated Relief Valve Calibration, September 6, 1984 PT/1/A/4150/138-00 Calorimetric Reactor Coolant Flow Measurement, April 5, 1985 The above work packages were complete, performed to the latest procedure revision, properly reviewed, and consistent with procedural acceptance criteri Those marked with an asterisk are included in the inservice inspection (ISI) of pumps and valves as required by ASME Code Section XI, Subsections IWP and IWV, and by Section 4.0.5 of the T Within this area, no violations or deviations were identifie . Measuring and Test Equipment Program (35750, 61724)
References: (a) 10 CFR 50, Appendix B, Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants (b) Regulatory Guide 1.33, Quality Assurance Program Requirements (Operations), Revision 2 (c) ANSI N18.7-1976, Administrative Controls and Quality Assurance of the Operational Phase of Nuclear Power Plants (d) Regulatory Guide 1.30, Quality Assurance Requirements for the Installation, Inspection, and Testing of Instrumentation and Electric Equipment, August 11, 1972 (e) ANSI N45.2.4-1972, IEEE Standard, Installation, Inspection, and Testing Requirements for Instrumentation and Electric Equipment During the Construction of Nuclear Power Generating Stations The documents listed below were reviewed to verify that selected elements of the measuring and test equipment program are being implemented as specified by procedure FSAR, Section 17.2.12, Control of Measuring and Test Equipment, Amendment 8 APM, Section 2.3, Control of Measuring and Test Equipment, Revision 21 APM, Section 5.1, Standards Laboratory, Revision 21 Quality Control Procedures Manual, Section QC B-1, Control of Measuring Equipment and Calibration and Test Standards, Revision 20
. .
.
SD 2.3.1, Control of Measuring and Test Equipment, Revision 7 The following site QA surveillance reports were reviewed to gain a perspec-tive of the prograr's current status:
CN-84-18, M&TE, I&E Maintenance, May 21, 1984
'
CN-84-41, M&TE, Chemistry, August 21, 1984 CN-84-46, M&TE, Mechanical Maintenance, August 31, 1984 CN-84-64, M&TE, Performance, November 28, 1984 CN-85-03, M&TE, I&E Section, February 5, 1985 CN-85-16, M&TE, Mechanical Maintenance, April 12, 1985 Deficiencies identified in these reports included lack of traceability of a device to a work request, rejected items not tagged, equipment not calibrated at the specified frequency, and M&TE in temporary storage areas not adequately segregated from uncontrolled equipmen These items are closed or are being corrected in an expeditious manne Several recent QA corporate audits addressed the subject of measuring and
- test equipment controlled by various groups. The following audits were
- reviewed
NP-84-2(CN), Administrative Services and Maintenance, February 20, 1984 NP-84-9(CN), Operations and Technical Services Activities, June 11,
'
1984 NP-84-17(CN), Technical Services and Administrative Services Activities, October 30, 1984 NP-84-22(CN), Operations and Maintenance Activities, December 19, 1984 NP-84-2(CN), Administrative Services and Maintenance Activities, February 12, 1985 Audit NP-85-2(CN) concluded that the control of M&TE in the Instrument and Electric (I&E) Group was inadequate. Corrective action for this item appears to have been effectiv Another major finding, identified in NP-84-2(CN), concerned a failure to control vendor manuals. This deficiency has been correcte Implementation of the M&TE control program was assessed in three shops:
I&E, Mechanical Maintenance, and Performance. In the I&E shop, the following instruments were chosen at random to check storage, identifica-tion, and documentation:
CNIAC 18012 Megohm Meter CNIAC 18037 RTD Bridge CNIAC 18063 Digital Multimeter CNIAC 18077 Digital Multimeter
. .
CNIAC 18242 Bourdon Gage CNIAC 18364 DC Shunt CNIAC 18534 Pulse Generator CNIAC 18601 Digital Thermometer CNIAC 18619 Digital Multimeter CNIAC 18643 Resistor The above equipment was properly stored or checked out and had suitable documentation as to its calibration status and previous usag The following calibration procedures were reviewed:
IP/0/B/3860/04 Calibration of Test Gauges, Change 9 IP/0/8/3860/07 Moore 14943 Calibrator, Change 0 IP/0/8/3860/13 Transmation 1040/1040SP PPS Digital Calibrator, Change 1 IP/0/B/3860/11 Rosemont 262 Field Calibrator Calibration, Change 2 IP/0/B/3860/12 Swagelock Gap Inspection Gage, Change 0 IP/0/B/3860/10 Heise 710A Digital Pressure Indicator, Change 2 IP/0/B/3860/01 Fluke 8600A Digital Multimeter Calibration, Change 3 The above procedures addressed test prerequisites, step-by-step instruc-tions, and acceptance criteria with the exception of IP/0/8/3860/01, Fluke 8600A Digital Multimeter Calibratio This procedure failed to state calibration test conditions prescribed by the manufacturer. This issue is discussed as an inspector followup item belo The mechanical maintenance lab is a well-controlled, clean, orderly
.
facilit Equipment storage is excellent and lab temperature is precisely
!
controlled. The following tools chosen at random were examined:
CNMNT 18009 Torque Wrench CNMNT 18204 0-1" Micrometer l CNMNT 18402 0-9" Depth Micrometer CNMNT 18656 0-2" Dial Indicator CNMNT 18827 Optical Flat
'
The above tools were properly stored and were supported with suitable documentation. Only torque wrenches, dial indicators, and micrometers are calibrated in this lab. Other mechanical equipment is sent off site for calibration. The following calibration procedures were reviewed:
MP/0/B/7650/43 Calibration of Torque Wrenches, Change O MP/0/B/7650/18 Calibration of Dial Indicators 0-1", Change 0 MP/0/B/7650/10 Calibration of Outside Micrometers, Change 0
- , _
- _ - . . .- .- . . - . - ,
.. ..
These procedures appeared adequate to assure the quality of calibration activitie The Performance Group controls pressure gauges, thermometers, and other devices primarily for the performance of inservice testing of pumps and valves. The following items of M&TE were selected for review:
'
CNPRF 20010 Fluke Digital Thermometer CNPRF 20229 0-100 psig Heise Gauge CNPRF 20255 0-15 psig Ashcroft Gauge CNPRF 20334 0-100 psig Helicoid Gauge CNPRF 20431 0-100 psig MRM D/P Gauge Each of the above items were either properly stored and tagged or equipment history cards indicated that they were checked ou Within this area, two inspector followup items were identified and are discussed in the following paragraph , Environmental Controls for Calibration of M&TE in the I&E Shop Procedure IP/0/B/3860/01, Fluke 8600A Digital Multimeter Calibration, Change 3, does not state the manufacturer's recommended calibration test conditions of 23t5 degrees C and less than 80 percent humidit These conditions are not verified by documentation on calibration data sheets. The licensee recently identified this problem and is enacting corrective measure Procedure IP/0/B/3860/01 is under revision to require calibration within the recommended test conditions and to require documentation of temperature and humidity on the calibration data sheet. However, the draft of the revision shown to the inspector did not specifically state the required test conditions which other-wise could only be found by referring to the manufacturer's technical manual. The licensee stated that this matter would be reviewed. A temperature and humidity indicator is on order and calibration activities will soon be moved to a separate room. Though environmental conditions will probably not be controlled in the new facility, they will be monitored to ensure that calibration will take place only when test conditions are met. The licensee was encouraged to review technical information associated with all items of M&TE calibrated on site to ensure that suitable environmental conditions are provide Until environmental conditions are procedurally and effectively controlled for calibration of M&TE in the I&E shop, this item is identified as Inspector Followup Item 413/85-19-0 Promptness of Evaluations of Out-of-Tolerance M&TE When an item of M&TE is found out of tolerance, the licensee is required to evaluate the acceptability of previous tests conducted with this item since the last calibration. Though no regulatory require-ments prescribe how soon this evaluation must be completed after the
--
. - . . _ _ - _ _
.
- _ . _
. .
out-of-tolerance condition is discovered, promptness is an essential issue since reactor plant safety may be compromised. The licensee's policy concerning this issue is inconsisten The Quality Control Procedures Manual requires that evaluations be completed within 7 working days for M&TE assigned to QA. The remainder of the plant's M&TE falls under the control of Station Directive 2.3.1, Control of Measuring and Test Equipment, which states the requirement to perform the evaluations without reference to timelines Individual calibra-tion procedures in the Performance Shop state a requirement of 7 days but calibration procedures in I&E and Mechanical Maintenance do not '
specify a time limit. As a result, some evaluations take two to three weeks and some exceed a month. This is a problem if the licensee has determined that 7 days is the proper priority for these evaluation Until a consistent plant-wide policy is developed to address the timeliness of M&TE out-of-tolerance evaluations, this item is identified as Inspector Followup Item 413/85-19-02.