ML20083N924

From kanterella
Jump to navigation Jump to search
Discusses Preparation of Environ Rept - OL Stage.Certain Sections of Environ Rept Will Be Deleted to Eliminate Duplication of Info Between FSAR & Environ Rept
ML20083N924
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 01/26/1983
From: Warren D
SOUTHERN COMPANY SERVICES, INC.
To: Mark Miller
Office of Nuclear Reactor Regulation
References
S-118, S0-0118, NUDOCS 8302030261
Download: ML20083N924 (2)


Text

. . -

, .. Southern Company services. Inc Post Othce Box 2625 Birmingham, A!abama 35202 Teiephone 205 670 6011 Southern CompanyServices me soumem euroc system January 26, 1983 PF-GA/V-C3 VER-3.5 File: X7T03.5 Log: S0-0118 Melonie Miller Vogtle Electric Generating Plant g.94 Project Managers Division of Licensing u6 U.S. NRC fpb Washington, D.C. 20555

Subject:

Vogtle Electric Generating Plant - Operating License Stage Environmental Report (OLSER)

Dear Ms. Miller:

We are preparing the Vogtle OLSER in a manner which will eliminate redundant information between the FSAR and OLSER. During our meeting of January 4, 1983 we discussed the draft NRC guidance document for the 7

preparation of OLSER's. This document encourages applicants to reference the FSAR for " demography, meteorology, hydrology, geology, radwaste systems, etc."

Except for specific references to the FSAR, the information in the following OLSER sections will be deleted:

(1) 2.3 Meteorology - Refer to FSAR 2.31 and 2.32 (2) 2.4.6 Groundwater - Refer to FSAR 2.4.13 (3) 2.5 Geology - Refer to FSAR 2.5.1 (4) 3.5.1, .2, .3, .4, .5 - Refer to FSAR 11.1, .2, .3, .4, .5 (5) 4.4 Exposure to Construction Workers - Refer to FSAR 12.4

! (6) 6.1.3 Air Monitoring - Refer to FSAR 2.3.3, .4, and .5 i

The detailed information requested in Regulatory Guide 4.2 for the above OLSER sections will be in the FSAR sections as noted. Furthermore, the data l requested in Appendix E to Regulatory Guide 4.2 will be in the FSAR. Thus, the information for this appendix will be addressed by appropriate references to more detailed FSAR sections.

These actions will eliminate duplication of information between the FSAR and OLSER and eliminate the need to amend two documents in response to changes necessitated as a result of design modificaticas, staff questions, etc.

Q D) 8302030261 830126 PDR ADOCK 05000424 PDR C

1 tielonie Miller January 26, 1983 Page 2 These actions are consistent with the draft guidance noted above. If you have any questions concerning the manner in which we are preparing the VEGP - OLSER, please call.

Sin erely, h/ W-Daniel H. Warren sro cc: D. O. Foster S. H. Lawrence i

J. A. Bailey

0. Batum W. L. Bowers S. G. Cereghino J. G. Farley, 1r.

t J. A. Gardner W. F. Kitchens J. N. ficleod M. Malcom D. L. Minyard J. M. Purucker PROJECT FILE

- - _ _ _ . - _ . - .