Responds to NRC Bulletin 89-002, Stress Corrosion Cracking of High Hardness Type 410 Stainless Steel Internal Preloaded Bolting in Anchor Darling Model S350W Swing Check Valves or Valves of Similar Design. No Matls Subj to Bulletin Found
ML20011D864
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 12/22/1989
From: Hairston W
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ELV-01156, ELV-1156, IEB-89-002, IEB-89-2, NUDOCS 9001020191
Download: ML20011D864 (2)


Text

oeofD'a Power company :i 333 Pedmont Avenue e Atlanta, Georg a 30308

, . ' Jelephone 404 520 3195 Mailing Addrets:

' 40 inverress Center Parkway ,

Post Offee Box 1295 Birmingham, Alat>ama 35201 Telephone 205 868 5581 >

December 22, 1989 ite sm"e" bktre sysM" W. G. Hairston. til sen,o, veo Pres, dent ELV-Oll56 Nuclear Operations 0169 Docket Nos. 50-424 50-425 l U. S. Nuclear Regulatory Commission ATTN: Document Control Desk .

Washington, D. C. 20555

~

Gentlemen:.

V0GTLE ELECTRIC GENERATING PLANT l RESPONSE TO NRC BULLETIN 89-02

't l On July 19, 1989, the NRC: issued Bulletin 89-02, " Stress Corrosion Cracking of

! High-Hardness Type 410 Stainless Steel Internal Preloaded Bolting in Anchor Darling Model S350W Swing Check Valves or Valves of Similar Design". The

  • bulletin requested licensees to identify, disassemble and inspect all safety-related Anchor Darling Model S350W swing check valves supplied with internal retaining block studs of ASTM Specification A193 Grade 86 Type 410 SS.

Licensees were requested to review the designs of other safety-related check:

i valves to determine if similar designs and material selection to the Anchor  ;

Darling Model S350W were used. The bulletin requested that licensees who do not have Anchor Darling Model S350W-swing check valves or valves of'a similar design provide a letter of confirmation to the NRC within 180 days of the receipt of the bulletin with a copy of the submittal provided to the regional administrator.

Georgia Power Company has reviewed equipment data bases and procurement docu-ments for Vogtle Electric Generating Plant ' Units.l. and 2, and has not found any valves or component materials subject to the action requirements of. this -

l bulletin. ~

This submittal completes the reporting requirement of NRC Bulletin 89-02 for the l Vogtle Electric Generating Plant - Units 1 and 2. Please contact this office if there are any questions.

h0fkbobk NO @4 O

G0orgia PowerQn V. S. Nuclear Regulatory Consission ELV-01156 .

Paae leo Mr. W. G. Hairston, III states that he is a Senior Vice President of Georgia Power Company and is authorized to execute this oath on behalf of Georgia Power Company and that, to the best of his knowledge and belief, the facts set forth in this letter are true.

GEORGIA POWER COMPANY By: Id /de b Ea-W. G. Hairston, III Sworn to and' subscribed before me this ./2#day of Or e c.o $ c 4 , 1989.

1Mtd pu )d/ c Notary fublic u(cc m x m Fl M C 2 C "

i i

WGH,Ill/PAH/gm xc: Georaia Power Company l Mr. C. K. McCoy Mr. G. Bockhold, Jr.