Forwards Second Suppl to Summary Rept of Startup Test Program
ML20006E358
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 02/12/1990
From: Hairston W
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ELV-01314, ELV-1314, NUDOCS 9002220740
Download: ML20006E358 (2)


Text

-

,  ; c.

!'j ' y-: .;-

TGeotDi a Powr Company . t i: -- 333 Piedmont Amnue

, ., A!!ania. Georpa 30308 hlgl . ,

  • 4ephov 404 526319$

. Ma hng Addrests 40 invemess Center Pwkway -

4 i Post Offce fka 1P95.

D.tmsnghsni, A!at.ama 3S?01

' Telertione 205 808 5581 3-W. G Hairston,lH Senior Vee President Nuclear Operanons l ELV-01314 0229 Docket No. 50-425 U. S. Nuclear Regulatory Commission

- ATIN: Document Control Desk v ~ Washington, D. C. 20555 Gentlemen:

'V0GTLE~ ELECTRIC GENERATING PLANT - UNIT 2 SECOND SUPPLEMENT T0

SUMMARY

REPORT

, .. y ; . OF STARTUP TEST PROGRAM .

..In accordance with-Technical Specification 6.8.1.1., attached is the second supplement .to.the initial'startup report which was submitted by letter ELV-00789 dated-August 21, ~~1989, l l

.If you have ~any questions, please contact this office.

Sincerely,

, fbL l W. G. Hairsto , III WGH,Ill/NJS/gm Attachment xc: -Georaia Power Company Mr. C. K. McCoy Mr.'G Bockhold, Jr. i

, .Mr' P. D. Rushton-1

.Mr.'R. M. Odom j NORMS  :

-j

- U. S. Nuclear Reaulatory Commission q" Mr. S. D. Ebneter, Regional Administrator Mr. D. B. Matthews, Director, Project Directorate II-3

-Mr. R. f. Aiello,' Senior Resident Inspector, Vogtle 0

9002220740 900212 ,

. PDR ADOCK 05000425 /

4

.P~

PNV /  ;

_3

tu c c

. 4- : >

r

. V0GTLE ELECTRIC GENERATING PLANT - UNIT 2 SECOND SUPPLEMENT TO

SUMMARY

REPORT

'0F STARTUP TEST PROGRAM This second su)plement to the initial startup report addresses the remaining

startup test t1at was incomplete at the time of submittal of the initial startup report.

The test is identified according to the section numbering scheme used in the initial report. The test procedure number is provided in parenthesis.

7.6.10. Thermal Expansion Test (2-600-11)

?

The only remaining testing to be completed _ consists of cold post-test reaoings which require the plant to be in a cold shutdown condition. The readings will be performed during the. Unit 2 refueling outage under Procedure 2-600-11.