Forwards Semiannual Update of Projects Listed in Categories A,B & C of long-range Planning Program Integrated Schedule, Including Inservice Insp,Security Access & Eddy Current Testing
ML19327B929
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 11/03/1989
From: Long R
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RTR-REGGD-01.097, RTR-REGGD-1.097 C-89-758, C000-89-0758, C311-89-2114, TAC-65824, NUDOCS 8911140225
Download: ML19327B929 (18)


Text

p

a. ,

y

OPU Neoleer Corporation i

e my One Upper Pond Road -

Wu Parstaeny, New Jersey 07054  !

201 316 7000  :

TELEX 136-482 Wilter's Direct Dial Number: -

November 3, 1989 j

! C000-89-0758 C311-89-2114  ;

)

(TAC No. 65824)

U. S. Nuclear Regulatory Commission Attention: Document Control Dask }

Whshington, D.C. 20555 ,

I f

n L

, Centlemen

Subject:

Three Mile Island Nuclear Station, Unit No. 1 (THI-1)

Docket No. 50-299 Operating License No. DPR-50  ;

Long Range Planning Program (LRPP)

Update of Integrated Schedule

  • ABC" Project Listing ,

Pursuant to License DPR-50 Cond. tion No. 2.c.9, GPUN hereby submits the  ;

required semi-annual update of projects listed in each of the Categories A, B,  :

and C of the LRPP integrated schedule. The two attachments to this letter provide 1) the ABC project listing; and, 2) a rummary of changes since our last .

update (GPUN Letter No. CJ11-89-2051 dated May 4, 1989 ). These attachments I contain details as follows:  ;

1. Attachment A - A new project listing of Category A, B, and C projects annotated by an asterisk (*) to identify new projects, and by a double  !

astorisk (**) to identify changes in Budget Authorization (B/A) number assignments. Completed projects inave been removed f rom the schedule listing. Remaining projects are ongoing or are scheduled consistent '

.with cycle / year commitments. Any changes in schedule are reflected on i Attachments A and B. l

2. Attachment B - A-summary listing of category A and B projects which l have been completed, deferred, changed in scope, or otherwise have had (

schedule changes with explanations as appropriate. The listing also ,

j contains Category C project completions. Changes to the Category C ,

scope or schedule do not impact Categories A or B schedules.  !

r 31015389 .

l 891114C1225 891103 PDR ADOCK 05000299 g PDC

/40ol f \ .

GPU Nuclear Corporation is a subsidiary of General Pubhc Utilites Corporation

' 'El y, Page Two (C311-89-2114; TAC N3. 65824)  :

November 3,-1989- ,

i U. S. Nuclear Regulatory Commission , .;

one addition to the list of Category A projects has been made by this submittal i for the mandated Fitness-for-Duty Program required by 10 CFR 26; and, four (4)- .

additions have been made to the list of Category 3 projects. In addition, i

- Attachment B descri';?e several changes to the list of category B projecte bq affacting schsiv*,d, scope, or project identifications. Pursuant to the LRPP-

[

for THI-1, .it' will be assumed that you are in agreement with the above category >

B changes if you do not respond to this submittal within 30 days of receipt. . t c,

I' !j Sincerely, ,

R. L. Longg /  ;

g. Vice Presige6t.and Director of I

[- Planning and Nuclear Safety ~ ,

GMG/RLL/ag j i, a cci R. Hernan (NRC) ~

[

J. S';olts (NRC) .

W. Russel (NRC) {

( F. Young'(NRC Resident Inspector THI-1)  !

f t

f I

[

, t s  ?

I L 1 v ,

i $

L L i i f i-V s

[

31015389  ;

.i

.;z

-.i ECT . LIOT100 TOI.1 PO

-____ .. _- .._.-- --- =__ .--____ -.

CATECORY

  • A' PROJECTS SORT SY CATEGORY / CYCLE /BA STATUS AS OF 91089W99

_.._ _............-__......- ..__---... _...=-_-- =-- =-.......- _..... --__....._-..... _......_--..____ _.......................

083 BA DESCRIPTION CYCLE /

NUW8ER CLASSIFICATION YEARS

_ _ . . _ - - - - - - ------__=. __..._.- - - - - - = _ = ===---=--- - ___--..._.....__ - ..._...... __.______ .....------ -.. ..........__.-

1 412491 REG GUIDE 1.97 0800S D8R MNt CR FINAL TIE-INS WITN PLANT COtepuTER.

REF RIEaIO 5211 87-3180,LAI 87-9155 2 412531 Puesp RECIRC FLOWaIETERS FOR IST 084 NRR AS INSTALL FLOWIEETER ON RECIRC LINE FOR '

WDL-P13A/8; INSTALL RECIRC LOOP AND FLOWIAETER FOR CAP-1A/8. LAI 87-9045 3 412462 ANTICIPATE TRANSIENT W/O SCRAas(ATWS) RULE 09R NRR CR RELR C8 T8 ~

asODIFICATIONS TO FULFILL REOUIREGIENTS OF 10 CFR 50.62. LAI 88 9260 4 412567 STATION BLACKOUT 09R NRR ENGINEER AND INSTALL RECOesIEENDED PLANT 8800S IN ACCOROANCE WITN 10CFR50.63, LAI 89-9083 5 126212

  • = AAAoA Drnfort

TCI-1 PQ ECT LICTIQQ' CATEGORY '8' PROJECTS SORT SY CATEGORY / CYCLE /BA


_ ------------------------------------------------------_---- STATUS AS Or eleseve9 OSS BA

=--

- ---- -. - ------------- = ==-------------------

DESCRIPTION CYCLE / CLASSIFICATION NUMBER YEARS 6 123227 INSERVICE RX BLOG TENOON SURVEILLANCE 07 NRR INSPECT APPROXItsATELY 10 TENDONS REF. NUREG 135.1.T.S. 4.4.2.1 7 412551 INSTRutsENT AIR UPGRADES 08 ISM INCREASE CAPACITY Or INSTRuteENT AIR SYSTEMS. (SPIP REC.)

REF. C311-88-2092 8 123230 ILRT 08R NRR R8 INTEGRATED LEAK RATE TEST OF CONTAINRIENT - 1990.

9 123253 OTSG TUBE PLUGGING - SR 08R NRR R8 PLUG OTSG TUBES AS NECESSARY. '

10 123257 FUEL esOVEasENT FOR 8R CORE. LOAD 08R NRR

, R8 ALL tsORK REQUIRED FOR REACTOR HEAD AND PLENUIs REtIOVAL $ REINSTALLATION. FUEL

. SHUFFLE S INSTALLATION OF THE SEAL PLATE 11 123280

  • PRESSURIZER SURGE LINE INSPECTION 08R NOR R8 VISUALLY INSPECT THE 10" PRESSURIZER SURGE LINE.EEO. BY NRC BULLETIN 88-11.

! FUNOING BA 123250sLAI 89-9030.89-9026 12 126204 OTSG EDOY CURRENT TESTING 08R NRR R8 ECT OF SAtsPLE INSPECTION GROUPS INSPECT 20% PER EPRI GUIDELINES TSCR 193 13 126205 TMI INSERVICE INSPECTION (OUTAGE 8R) 08R NRR

, ALL ASesE SECT XI INSPECTIONS: AUGesENTED ISI TO COGIPLY WITH 10 CFR 50.55.

le 412538 HEAT SINK PROTECTION SYSTEni UPGRADE 08R NRR CR C8 INSTALL DIFFERENT CR INDICATOR FOR -

asSRO: OTHER asOOS IDENTIFIED SY OPS, MAINT AND PLANT ENG.LAI 87-9283.

  • = Added Project

d -

ECT

~

TCI-1 PQ L I O Y I C3 O CATEGORY *8* PROJECTS SORT SY CATEGORY / CYCLE /SA STATUS AS Or 01NOVs9

~


= - . - - - - - - - - - - - - . - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -


=== = --- ---------------------------------------;

-OSS BA DESCRIPTION CYOLEI CLASSIFICATION NUMBER TEARS

-- ------------- =_- .- ----- -


.-_--- --- ------------------ ----___-_ - - - - - - - - - . . . . - - . . . _ = _ - - - - - - - - - - . - - - . - - - - - - - - - . - -

15 412551 INSTRUMENT AIR UPGRADES 08R ISM IMPROVE FILTRATION AND INSTRUMENT. MODIFY IA-SA X-OVER.

(SPIP RECIREF.C311-88-2092 1G 412566 CONTROL ROOM NOISE REDUCTION MOOS OSR ISM CR CHIME.GLO8AL SILENCE. TILES, FIRE DET DANEL esOO, RMS SYPASS (SPIP REC) REF. C311-88-2992 17 123275 OTSG TUSE PLUGGING 099 NOR R8 PLUG OTSG TUBES AS NECESSARY.

18 123278 9R REACTOR REFUELING 099 NRR R8 80 NEW FUEL ASSEMBLIES. FULL CORE OFFLOAD.

i 19 123287

  • MAIN STEAM SYSTEM TEST - 99 099 NRR R8 PERFORM NYDROSTATIC TEST OF OTSG, MS AND FW PIPING. REQUIRED BY 10 CFR 50.55 29 126A09 OTSG EDOY CURRENT TESTING 09R MRR e R8 ECT OF SAMPLE INSPECTION GROUP:

' INSPECT 20s PER EPRI GUIDELINES TSCR 193 I 21 126C09 TMI INSERVICE INSPECTION (OUTAGE 9R) 09R MRR l ALL ASME SECT XI INSPECTIONSg AUGMENTED ISI j TO COMPLY WITH 10 CFR 50.55.

22 126203 RX VESSEL INSERVICE INSPECTION 9R 09R NR5r R8 PERFORM 10 YEAR RX VESSEL INSERVICE INSPECTIONS TO COMPLY WITH 10CFR50.55 AND T.S.4.2 i

23 41xADR LM'4ANCED DECAY HEAT REMOVAL ISONITORING 099 NOR R8 RESPONSE TO GENERIC LETTER 88-17 LOSS OF DN REGIOVAL. GPUN RESPONSE C311-88-2165.

. (REF LAI 89-9041)

  • = Added Proiect

TCI. 1 PQ ECT 1. I O T I- C3 0

_ = - - - - - - - - - -_ --- .......-.._-. ,.

CATEGORY *8' PROJECTS SORT SY CATEGORY /CYCLf!/BA STATUS AS Or 01NOVW

- - - - - - - - - - - - - - - - - - - . . . . . . _ - - = - - - - - . . . - - . . . . - - - . . . . . . . . . - - - .-- - - - - - -

..........--s.- .... ..........--..

OSS BA DESCRIPTION CYCLE / CLASSIFICATION NUMBER YEARS

= - - - _ _ - _ - - - - - . . . . - . . . . . . . - - - - - - - . . . . . . = = = _ - - - - . . . - - . . . . - - - - - - - = = - _


=-- --. --.......... ..............

23 412556 TMI-I MAIN ANNUNCIATOR REFORMATTING 094 ISM CR RELR ADD NEW ALARMS. COMBINE AND ELIMINATE ALARWSs RECONFIGURE OVERNEAD PANELS.

25 123289 ** ILRT . 10R 10R NRR R8 INTEGRATED LEAK RATE TEST OF CONTAINMENT . 1993.

23 123290 ** OTSG TUBE PLUGGING . 10R 10R NOR 98 PLUG OTSG TUBES AS NECESSARY.

27 123294 ** RX REFUELING . 104 10R NOR 98 l 80 MER FUEL ASSEMBLIES.

, 28 126A10 OTSG EDOY CURRENT TESTING 100 NOR R8 ECT OF SAMPLE INSPECTION GROUP INSPECT 20X PER EPRI GUIDELINES TSCR 193

29 126C10 TMI INSERVICE INSPECTION 10R NOR
ALL ASME SECT XI INSPECTIONS
AUGMENTED ISI TO COMPLY WITN 10 CFR 50.55.

4 33 128098 SAFETY PERF IMPROVEMENT PROG EVALUATIONS 86-89 NOR RELR CR EVALUATIONS OF RECOMMENDATIONS FOR PROCEDURE CHANGES-BWOG SPIP

' PROGRAM REF C311-88-2092 4

31 412512 SAFETY PERF IMPROVEMENT PROG (SPIP) 88 90 NOR MODS TO IMPLEMENT SPIP RECOMMENDATIONS.

REF. C311-88 2092 32 128099

  • TME-E INDIVIDUAL PLANT EVALUATION 88-92 NOR IKadSTRY DEGRADED CORE ACTIVITIES S PLANT SPECIFIC NRC SUBMITTAL.

(REF LAI 89-9201)

I

  • = Added Proiect

. 1 T01 1 PQ ECT t. I C T 1 0 0-

.... - =- _- - ..--....--...--.. - .

CATEGORY 'S' PROJECTS SORT SY CATEGORY / CYCLE /BA STATUS AS OF 9tNOvet -i

--_..----____ - = - - _ _ - _ = - - = _ -_-_ _ _ _ . . . = _- __==_

._ __- --____ ___ -=......-.-- ._ _ _ _

OSS SA DESCRIPTION CYCLE / CLASSIFICATION NUMBER YEARS

- .--......== --- _ = - - - - = - . ------- __-==------- _

33 128097 SQUG USERS GROUP P5tOGRAM 88 93 NRR SEISMIC QUALIFICATION UTILITY GROUP PARTICIPATION 33 418057 CONSOLIDATICd PLA:t 88/89 NRR TASKS TO BE ACCOMPLISHED TO CONSOLIDATE TMI-1 AND 2 SECURITY; LAI 88 9019.

35 418714 MECH FILTER LEAD PROCESS SHIELD 39 NRR PURCNASE 3" LEAD PROCESS SHIELD ANO FILTER TRANSFER CASK LAI-87-9243 33 126209 ISI UPDATE $9 91 NRR UPDATA ISI PROGRAM IN ACCORDANCE WITH

, ASME S&PV CODE REQUIREMENTS i REQUIRED BY 10CFP50.55, LAI 48 9279 37 126201 ** OUTAGE GENERAL EMPLOYEE TRAINING . TMI.] 89 93 NRR i INSTRUCT IMOIVIDUALS WORKING IN NUCLEAR POWER PLANTS.

38 128108 TF SEISMIC QUALIFICATION OF EQUIP 89 93 NOR SCOPE.WALKDOWNS AND EVALUATIONS FOR SOUG PROGRAM AS REQUIRED SY NRC GL 87 02 5 LAI 87 9084.

33 412523 REPLICATE SIMULATOR CERTIFICATION UPGRO 89-93 tIRR UPGRADE SIMULATOR CONSISTENT WITH i CONTROL ROOM MODIFICATIONS.

  • = Added Proiect

~ - - . -.

~

b TOI-1 00 ECT L I 6 T I CI O

- - - = = -----==----:-=---_-- -

CATEGOCT C' PROJECTS SORT SY CATEGORY / CYCLE /BA STATUS AS OF GINOW99


_------_-----_-_--------_-----__------------__------_----_--- - = - - _ _ - _

_=--- ------_--------_--_--_-----------.---

NIS SA DESCRIPTION CYCLE / CLASSIFICATION NUMGER YEARS


_--_----- ==--- ------__-_---_____-----_--------_- -- ------- -- -------- _ -

40 412541 ADDITIONAL 8BAINTENANCE PLATFORMS 07 GWC 18 78 INSTALL ISAINTENANCE PLATFOReeS IN THE INTERGIEDIATE AND TUR8INE SUILDINGS

, 41 412ADN TUR8INE LUBE OIL STORAGE TANK 08 ~E REPLACE TUR8INE LUBE OIL TANK & PIPE W/

i FIBERGLASS W/ LEAK PREVENT 5 CCTECT.

REQUIRED BY 40CFR200 42 412577

  • ADD *L TURS. BLDG. 5 INT. BLOG. PLATFORMS 08 ISM T8 IB DESIGN, PROCURE AND INSTALL PEROSANENT RSAINTENANCE PLATFOResS IN THE TUR8INE BLG INTERGIEDIATE SLDG AND 8WST TUNNEL

! 43 412580 ** SPENT FUEL NANDLING BRIDGE UPGRADE 08 REL FN8 SPENT SRIDGE- REPAIR / REPLACE CONTROL ROD tsAST, REPLACE DILLON LOAD CELLS, INSTALL PROGgammaam E GEARED SWITCN i 44 123888 OTNER OUTAGE RELATED ACTIVITIES 08R ALL i ALL OUTAGE RELATED ACTIVITIES SUCN AS INSPECTIONS, REPAIRS, SURVEILLANCES.

WINOR 880DIFICATIONS, 1000 SUPPORT, ETC.

i 45 126206 STEAGI EROSION INSPECTION O9R Isas ALL AUGIBENTED INSPECTIONS TO DETECT EROSION / DEGRADATION OF TABI SYSTENS.

i 46 128128 OTSG SECONDARY SIDE INSPECTION 08R IARC RB l INSPECT AND SARIPLE OTSG SECONDARY SIDE TO PREPARE FOR CNElf CLEANING IN 9R 47 128135 OTSG FW NOZZLE SPRAY PLATE REPLACEIEENT G8R IIRC R8 REPLACE 64 ISAIN FW NOZZLE SPRAY j PLATES (32 PER OTSG) 48 128141 PRESSURIZER NTR 8100 (IIII-155) OdR 88RC REPLACE PRESSURIZER NEATER BUNDLE ELECTRICAL CONNECTORS 4

  • = Added Proiect

m , = -: - - , . . _ ___ ___ , .

j

..,s-y A- =  : . .

^

- i T '* I - 1 1 'r M .- .E C T. L I 6 T I C3 *d 1 W i

-y ---. --- --. 4- _______ __ __

~ '

': . x.

CATEGORY *C* PROJECTS

' SORT BY CATEGORY / CYCLE /BA -

STATUS AS (F-OIMOV49

_ _ = - _ = - ..---------...w ----..... ....--...........--....

OBS BA DESCRIPTION CYCLF/ (,LASSIFICATION

' NUMBER YEARS

---...= ----...----- __-..-----...-- _ _ -_----------...----....:=. -_-- - ----

- _ - - . = - - - - - - - - . _

_40 412271 PLANT PERF MONITOR Ih3TRUMENTATION 08R. *W TB UPGRADE OF INSTRUMENTATL?N TO MEASURE PLANT AND COMPCNEUT PERFORMANCE 50 412522 REPLACE BAILEY TRANSMITTERS 08R MRC RB TB IB REPLACE 6 BAILEY BY TRANS, INSTALL NEW PWD SUPPLY MODULES, WIRING CHANGES WITHIN ICS/NNI 51 412540 REACTOR BLOG MAINTENANCE PLATFORMS 08R ISM RB PLATFORMS AT RCP lc LOWER MOTOR BEARINGS.RCP-1B COUPLING AREAS, CA-V-194 5 WOG-V2 AREAS 52 412546 OTSG UPPER MANWAY ACCESS PLATFORh. (PAN 08R GMC RB EXPANO EXISTING PLATFORMS TO PROVIDE-UPPER OTSG ACCESS. INSTALL ACCESS PLATFORM TO AH-V-lC.

53 412561 UPGRADE CABLE EOUIPMENT PROTECTION 08R ISet REPLACE 1 CABLE AND 6 CIRCUIT BREAKERS BKRS. REVIEW UNDERSIZED CKTS-SMALL FIXES 54 412562 OTSG COLD LEG DAMS $ HYDROLAZE 08R IDE RB PURCHASE AMD INSTALL DAMS WHICH WILL ALLOW OTSG BOTTOM HEAD ENTRY CONCURRENT WITH REFlJELING.

55 412563 GENERATOR RELAY PROTECTION 08R ORQ TB PROVIDE UNDERFREQUENCY PROTECTION FOR THE MAIN GENERATOR. .

56 412564 REACTOR BLDG FUEL HANDLING UPGRADE 08R REL RB AUX BRIDGE. INSTALL INCHING SYSTEM, INSTALL PROGRAMMABLE GEARED LIMIT SWITCH .

57 412565 MAIN FW FLOW INSTRUMENTATION 08R kEL REPLACE EXISTING FLOW ELEMENT WITH FLANGED VERSION

  • = Added Project

c, _~ ---

=

~ --

w TCI_1 P-D -E C.T. L I 13.T I N O CATEGORY *C' PROJECTS

-SORT BY' CATEGORY / CYCLE /BA .

STATUS AS OF OINOW49

......_____ .._....__..... ._.._______...._ ___.___ __- - - - - - - - - - - - - _ - - - - - - _ -- -__=.------- =...__..._. _....-- ------

OSS- BA DESCRIPTION CYCLE / CLASSIFICATION 11 . NUMBER YEARS

. ..________..____...._______--- =-- = - . . . . - - - - =_... __.. _________.- __---=- - - ....... _____________ --.._---- ... _

58 412076 POISON FUEL RACKS-POOL A 09 NRR FHB-RERACK FUEL RACKS IN POOL-A-TO PROVIDE END OF LICENSED LIFE STORAGE CAPACITY 59 123FFF OTHER OUTAGE RELATED ACTIVITIES 09R ALL ALL OUTAGE RELATED ACTIVITIES SUCH AS

, INSPECTIONS, REPAIRS, SURVEILLANCES.

MINOR MODIFICATIONS, MOD SUPPORT, ETC.

50 126809 STEAM EROSION INSPECTION 09R NRR ALL AUGMENTED INSPECTIONS TO DETECT ~

EROSION / DEGRADATION OF TMI SYSTEMS.

(

61 128128 OTSG CNEM CLEANING SYSTEM 09R MRC RB CHEMICAL CLEANING OF BOTH OTSG'S USING EPRI/SGOG PROCESS i

62 412075 REPLACE CONTROL RODS 09R IOE

' RB REPLACE 8 CONTROL RODS.

4 63 412553 REPLACE BAILEY TRANSMITTERS - 9R 09R MRC RELR RB REPLACE 10 BAILEY BY TRANSMIT INSTAL NEW POWER SUPPLY MODULES WIRING f

CHANGES IN ICS/NNI 64 412569

  • MODIFICATION TO ENHANCE DC-V2/65 CONTROL 09R ISM CR
PROVIDE OPERATING CONTROLS FOR DC-V-2A/S ANO DC_V-65A/B AND FLOW INDICATION IN 1

THE MAIN CONTROL ROOM-65 412578

  • RCP S MS LINE HANGAR PLATFORMS 09R ISM kB 5
DESIGN, PROCURE S INSTALL PERMANANT PLATFORMS IN RB TO SERVICE RCP.1 AID '

LOWER MOTOR S COUPLNG S MS LINE HANGERS i 66 418705 INCORE DETECTOR REPLACEMENT 09R NRR t RB REPLACE 52 INCORE DETECTORS.

(

. _ =- -Added Proinc.t . . -.

' ~

~~

fQ- .

-- ky T O I.. I P de ECT LIQTICO w- CATEGORY 'C' PROJECTS '

4 SORT BY CATEGORY / CYCLE /BA

_________ ______..___..__________. ____________.. STATUS AS OF OIMOV89.

.--=-----_..______._____.._..=--------------- . . . _ . . . _ _ _ . _ _ _ _ _ _ _ . _ _ - _--- ....

- OBS BA DESCRIPTION CYCLE /

~

NUMBER -

CLASSIFICATION YEARS

. ...._____..________ ________._...____.____.___._ __.- . ---_-__..____._ .-- ---- =--- =-- -___.._______.._----. _ - - - _ - - - - --

67 418759

G8 123DDD OTHER OUTAGE RELATED ACTIVITIES 10R ALL

' ALL OUTAGE RELATED ACTIVITIES SUCH AS INSPECTIONS. REPAIRS, SURVEILLANCES.

MINOR MODIFICATIONS, MOD SUPPORT. ETC.

69 126810 STEAM EROSION INSPECTION IOR NOR ALL AUGMENTED INSPECTIONS TO DETECT EROSION / DEGRADATION OF TMI SYSTEMS.

70 418058 SECURITY ACCESS CONTROL COMPUTER ENHANCE 88-90 NRR ALL REPLACE CARD READERS: UPGRADE MAIN COMPUTER; NEW PRINTER.

, 71 419477 EMERGENCY COMMUNICATIONS SYS UPGRADE 88-90 NRR REPLACE 31 DEDICATED TELEPHONE CIRCUITS WITH MICROWAVE TRANSMISSION SYSTEM.

72 126101 PLANT LIFE ASSURANCE / EXTENSION 88-93 REL

SUPPORT OF STUDIES BY EPRI S-BWOG FOR FEASIBILITY OF EXTENOING OPERATING LIFE.

73 128114 EPRI STEAM CESERATOR RELIABILITY PROGRAM 88_93 MRC CO-FUNDING FOR EPRI SGRP TASK 404.

74 412536 ADVANCED CONTROL SYSTEM 88-93 ISM DEVELOP A SYSTEM CONFIGURATION TO -

REPLACE THE ICS/NNI SYSTEM WITH THE' ADVANCED CONTROL SYSTEM 75 128122 B&W CNNER' S GRGUP PROGRAW 1988/89 88/89 NRR GPUN PARTICIPATION IN THE BWOG.

  • = Added Project

, , .- _. ~ 2 -, . . _ . . . . ~~ ._ _ -_ __ __#.___ . _ _ _ _ _ _ _._

< - qs . ,,

+ -

p

.  :-~ __

7  ;-

2 _

~ _ _

~ -

T C I ECT- L I'O T-I Q 6~

~

+


-- - .1- ~ P M.__----_-_ ---__ __'----- .-- --

.~

CATEGORY *C' PROJECTS-SORT BY CATEGORY / CYCLE /BA ~ STATUS AS OF 01MOV859 $

-_____--__-_-________-___-________---_---__-________--___-_-___ -_______-__... - - -------- -= ___---____ ____-_-_______ -

OBS BA ' DESCRIPTION . CYCLE /

NUMBER CLASSIFICATION 4 YEARS

-____ ------__-------_---_-------__--_-__ ---- __--___ -----__.--___- - - _ _ _ - - - - - - - ____---_. ------ -______--__----.__--__ =.

76 128132 AS FOUNO DOCUMENT S DRAWING UPDATE: 88/89 NRR

MAINTAIN AS-FOUNO DOCUMENTATION (PER 10CFR50 APP
D .

77 412521 UPGRADE RADWASTE SOLIDIFICATION CAPABIL 88/89 RAD UPGRADE EXISTING SOLID WASTE FACILITY 78 128137 CONFIGURATION MGMT UPGRADE ACTIVITIES 89 -ISM ILLEGIBLE DRAWING REDRAW. CAD CR PANEL DRAWING UPGRADE. CIRCUIT-SCHEDULE DATA BASE GEN.,CARIRS/EDB TAG 8 INTERFACE 79 128138 DESIGN BASIS PROGRAM 89 ISM

' DESIGN BASIS RECONSTITUTION, PERFORM SSFI*S.

80 419648 ADMINISTRATION BUILDING NORTH 89 FAC CONSTRUCT A 200X150 THREE STORY OFFICE BUILDING.

81 419671 ROOF REPLACEMENTS 89 ~FAC l

REPLACE ROOF ON SIMULATOR BLDG 85 l AND EG5G BUILDING 82 419633 UPGRADE DOMESTIC WATER SYSTEM 89 90 FAC SURVEY EXISTING DOMESTIC WATER SYSTEM REPLACE / UPGRADE AS NECESSARY.

83 419665 CONSTRUCT TRAINING LASS 89 90 FAC i

PROVIDE FOR TRAINING LASS IN EXISTING STRUCTURES.

84 412543 PRA SAFETY ENHANCEMENT MODS 89_91 ISM IMPLEMENT MODS RESULTING FROM TMI 1 PRA l

  • = Added Drnient-

. -- - - - ~ - - - - .._ - -.-__-- - - --

g. wp L I C T I C3 d -

. .TCI- 1 P Ct c 'E C T.

- = _ _ _ _ _ - - - - - - - - - - - _ _ - - - - _ _ - - - - = = _ - *~

i CATEGORY *C' PROJECTS

. . SORT BY CATEGORY / CYCLE /BA STATUS AS OF OIMOV89

_--_-_----- . .-------.___----_-__.---------.---. .--_---------=- - . - - - _ _ - - __--- - . . - - - =.----_.-_--.-_------ ==-=..--.-

OOS BA DESCRIPTION ' CYCLE / CLAS3IFICATION NUMBER _i YEARS

-_-----------------------------------_---.------ = _ _ _ - _ - - = - - - - - - - - - - - . . . - - - - - - - _ _ - - - - _ _ - _ - - - - - - - - _ - - - _---- _ _--__.-

85 412570 REPLACE GASEOUS CHLORINATION SYSTEM 89-91 ISM ~

STUDY TO REPLACE GASEOUS CHLORINATION SYSTEM FOR CIRC WTR ANO RIVER WTR SYS WITH SODIUM HYPOCHLORITE SYS.

4 86 419X12 ROOF REPLACEMENTS 89-91 FAC REPLACE ROOFS ON BLDG 36. WAREHOUSE 1, WAREHOUSE 3 ANG DEWEY HOUSE.

87 123262 RELIABILITY CENTERED MAINTENANCE DROG 89-93 MRC RCM EVALUATION OF PLANT SYSTEMS TO DEFINE MAINT. ACTIVITIES THAT IMPROVE RELIABILITY.(APPROX. 40 SYSTEMS TOTAL).

I 88 419669 TWI ROADS UPGRADE 89-93 FAC HORTH BRIDGE PAVING. LIBERTY LANE UPGRADE,RESTRIPING. UNIT 2 RX HATCH IMPROVEMENT I

89 418749 TURBINE BUILDING SOUTH ADDITION 89/90 FAC I CONSTRUCT A THREE FLOOR ADDITION ON THE SOUTH SIDE OF THE TURBINE BUILDING TO CONSOLIDATE THE OPERATIONS DEPARTMENT 90 418750

  • SERVICE BUILDING ADDITION 89/90 FAC CONSTRUCT AN ADDITION TO THE NORTH SIDE OF TH5i SERVICE BUILDING I

91 419206 MOCK UP FOR QUAL OF RV NOZZLE INSPECT 89/90 NRR FABRICATE RV CORE FLOOD NOZZLE WOCKUPS FOR UT QUALIFICATION FOR ISI INSPECTIONS.

} 92 126207 OPERATOR TRAINING ANALYSIS 89/92 NRR CONOUCT ANALYSIS OF AO.CRO.SF/SS POSITIONS

REFERENCE:

NUREG 1122 93 128139 POST 1989 - CONFIG.MGMT. 90-93 ISM SUPPLEMENT BA 128137 CONFIG MANGT UPGRDE ANO IDENTIFY FUNDING FOR DESIGN BASIS .i RECONSTITUTION BEYONO 1989 l

  • = Added.Proiect

'~- ~ ~

-~~

3

, .. 7 ., .

+

~ .

l'. PG t C TL

~

' T D I _ -L I 2 T I N O' -

_-------_---------- _ =-- _-- - - _

...O CATEGORY.*C* PROJECTS ^

4 SORT BY CATEGORY / CYCLE /BA STATUS AS OF 01NOWW9 OBS BA DESCRIPTION CYCLE / CLASSIFICATION-HUMBER YEARS -

= = _ _ -- - - - - - = - - - - - - -...--- __-- __-------------=- ---. _...-...-

94 412581 POST 1989 CONFIG. MANGMNT DESIGN BAS REC 90-93 IDE FUNDING FOR DESIGN BASIS RECONSTITUTION BEYOND 1989 95 128ABH BSW OWNER *S GROUP PROGRAM - 1990/91 90/91 NRR PARTICIPATION IN BSW' OWNERS GROUP PROGRAM.

56 12691D ** TECH SPEC SIMPLITICATION 91 ISM PLANT SPECIFIC IMPLEMENTATION OF BWOG TECH SPEC SIMPLIFICATION PROGRAM 97 418755 RC-P SEAL CARTRIDGE TEST EOPT. 91 MRC PURCHASE CARTRIDGE SEAL TESTER

$8 419XX2 TURBINE BUILDING TOOL SHOP 91 ORR CONSTRUCT MAINT CONTRACTOR. TOOL SHOP ON 305* LEVEL OF TB TO REPLACE PLYWOOD-SHED.

59 419X28 UNIT 2 ADMIN BLDG 91 FAC ENGINEERING STUDY, VENTILATION AND HVAC MODIFICATIONS 100 41989G EMERGENCY PREPAREDNESS AUTO CALLDUT SYS 91 ISM PURCHASE S INSTALL AN AUTODIAL TELEPHONE BASED SYS. TO SUPPLEMENT PAGERS FOR CALL OF ERO PERSONNEL 101 128ABT

  • GSW OWNER *S GROUP PROGRAM - 1992/93 92/93 NRR ,

PARTICIPATION IN 88W OWNERS GROUP PROGRAM l02 412552 SOUG MOOS 93 NRR F - , ;.

ALL ,

MODIFY ANCHORAGES / SUPPORTS, REPLACE ^

PROTECTIVF RELAYS TO COMPLY.WITH SEISMIC QUALIFICATIONS. SCOPE NOT DEFINED.

  • = Added Proiect .~,.u-...,..c..-,.

.- . - - - . . -. . ~ . , . . , - . - , , . _ . . _ . _ _ - - . . . _ . ~ . _ . -_ . . - . .

p ,

m-:

n.,- - ,

i

g. 'Il e ..

lf; , > '

+

ATTACHMENT B -

j

}'

CHANGES TO THI-l NUCLEAR GENERATING STATION INTEGRATED SCHEDULE SEMIANNUAL UPDATE (NOVEMBER 4,1989) ,

t QAI1 GORY A PROJECTS Additions: As denoted by

  • next to the project title in Attachment A.

Completions: None Deletions: None  !

Schedule Changes: None i

e f

f g ,I '

t i

i f

J T

9

, B-1

, ,,, l'

t," ,

V r

i

- e, i

THI-1 Integrated Schedule ATTACHMENT B (continued) ,

CATEGORY B PROJECTS L Additions: Ar denoted by

  • next to the project title in Attachment A.

Completions: None i

Deletions: None Schedule Changes: Obs 33 BA 128097 SOUG Users Group Procram and Obs 38 BA 128108 Seismie cualification of' Eauioment - Reschedule of Walkdowns - On October 10, 1988 (C311-88-2134) CPUN provided to the NRC a schedule for the plant walkdown associated with the implementation of USI A-46 at THI-1. This schedule was contingent upon the schedule for completion of generic efforts submitted by the seismic Qualification i Utility Group (SQUG) in its October 9,  ;

1987 letter. The SQUG schedule provided i for completion of the Generie Implementation Procedure (GIP) by the end ,

of calendar 1988, followed by NRC review and issuance of a final SER in the second a quarter of 1989.

It is our understanding that the NRC will issue a preliminary SER for A-A6 .,

. implementation in late 1989 with a final SER in mid 1990.- Based.on this SER schedule slippage, the resources that l would be needed'for performing the L walkdowns in the Cycle 9R refueling have l L

been reassigned to other higher priority [

activities at part of the Long Range Planning process. With Cycle 9R resources reassigned, the walkdown is now scheduled for the Cycle 10R outage, currently scheduled to commence October 1993. It is ,

GPUN policy that resources must be '

allocated for refueling outage projects based on the Long Range Plan. The new schedule for TMI is, therefore, consistent with the Long Range Planning Program, CPUN policy and the Integrated Schedule license condition.

B-2 P

U i; '

[ .- -

a'

,; 9 1 V >

i I

Delay of the A-46 walkdown to IOR does not I represent a safety concern since the original design and qualification criteria-  !

applied to installed equipment l incorporated inherent conservatisms which provide established. safety margins. These criteria and margins were reviewed and i approved by the NRC during the Licensing ,

Process. The objective of A-46 implementation is to reassess the existing j; margins of safety and to confirm that- ,

acceptable safety margins exist for equipment designed and qualified before i current criteria were developed.

As part of pilot programs, training and i D' other interfaces with EQE Inc. (the prime contractor for SQUG), selective review of i a sampling of THI components and cable. '

trays has already taken place. The result indicates no problems exist with respect to seismic qualification by use of experience data.

obs 37 126201 Outace General Emolovee Trainino was extended to include Outage 10R'  ;

currently scheduled for October 1993. '

obs 39 412523 Reclicate simulator Certificatiqn i Unorades was extended through'1993 to be consistent with the current budget.

Other Changes: 1. Budoet Activity (BA) Number Chances l

The following BA_ numbers have been

! changed. There is no change in scope or schedule associated with these changes.

bas which have had their numbers changed i are indicated by a ** in Attachment A.

Qgi Previous BA Number New BA 25 123H10 ILRT-10R 123289 26 123C10 OTSG Tube plugging 10R 123290 27 123A10 Rx Refueling 10R 123294 I 37 12689A outage General Employee 126201 Training B-3

y- ,

r

,; , Q'. N*' ,,

L;;

' ~

V.

. , , i I '
TMI-1 Integrated' schedule

!?  !

[ 'i'  !

+

ATTACHMENT B (continued) I

~ l CATECORY C PROJECTS i Completioect. None.  ;

I

/

i

' Deletions: 12690B rsAR Verification  !

I:

418707' Letdown' Cooler Replacement.  ;

416706 Incore Detector Replacement i 419639 Refurbish. Green Building (BLDG 222) ,"

I: 419670 Electrical Upgrades  ;

L-3 Budget Activity  !

' Number' Changes:

c4 I- L . ~f-p !QR1 . Previous BA Number New BA .

s'- i 43 412ADA spent Fuel Handling Bridge 412580

'+

Upgrade 96 '128102 Tech spec simplification 12691D -