MONTHYEARML20217M0721999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Pass Dates ML20217D8361999-10-11011 October 1999 Provides NRC with Summary of Activities at TMI-2 During 3rd Quarter of 1999 ML20217F8271999-10-0707 October 1999 Forwards Pmpr 99-13, CNWRA Program Manager Periodic Rept on Activities of CNWRA, for Fiscal Reporting Period 990828- 0924.Diskette Containing Pmpr in Wordperfect 8 Is Encl. All Variances Are Expressed with Regard to Current Plans ML20212L1831999-10-0101 October 1999 Responds to Recent Ltr to Wd Travers Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Performance of Millstone to Ensure Adequate Protection to Public Health ML20212L2081999-10-0101 October 1999 Responds to Recent Ltrs to President Wj Clinton,Chairman Jackson & Commissioners & Wd Travers,Expressing Concerns Re Millstone NPPs & Continued Lack of Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance ML20212K1241999-10-0101 October 1999 Responds to Recent Ltrs to Chairman Jackson,Commissioners & Wd Travers,Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performace of Millstone to Ensure That Public Health & Safety,Adequately Protected ML20212L1971999-10-0101 October 1999 Responds to Recent Ltr to Chairman Jackson & Commissioners Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance to Ensure Public Health & Safety ML20212J9991999-10-0101 October 1999 Responds to Recent Ltr to President Clinton,H Clinton, Chairman Jackson &/Or Wd Travers Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performance of Plant to Ensure That Public Health & Safety Adequately Protected ML20212L0061999-10-0101 October 1999 Discusses GL 97-06 Issued by NRC on 971231 & Gpu Response for Three Mile Island .Staff Reviewed Response & Found No New Concerns with Condition of SG Internals or with Insp Practices Used to Detect Degradation of SG Internals ML20212L2171999-10-0101 October 1999 Responds to Recent Ltr to President Wj Clinton,Chairman Jackson & Commissioners,Wd Travers & Ferc,Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island ML20212K8771999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Three Mile Island on 990913.No Areas Identified in Which Licensee Performance Warranted Addl Insp Beyond Core Insp Program.Provides Historical Listing of Plant Issues & Insp Schedule ML20212K8551999-09-30030 September 1999 Informs That During 990921 Telcon Between P Bissett & F Kacinko,Arrangements Were Made for Administration of Licensing Exams at Facility During Wk of 000214.Outlines Should Be Provided to NRC by 991122 ML20216J6581999-09-28028 September 1999 Provides Info as Requested of Licensees by NRC in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams ML20212J0011999-09-27027 September 1999 Forwards Insp Rept 50-289/99-07 on 990828.No Violations Noted ML20212E1971999-09-16016 September 1999 Forwards Rev 11 of Gpu Nuclear Operational QAP, Reflecting Organizational Change in Which Functions & Responsibilities of Nuclear Safety & Technical Support Div Were Assigned to Other Divisions ML20212A2101999-09-13013 September 1999 Forwards Rev 3 of Gpu Nuclear Post-Defueling Monitored Storage QAP for Three Mile Island Unit 2, Including Changes Made During 1998.Description of Changes Provided on Page 2 ML20216G4151999-09-0909 September 1999 Forwards Pmpr 99-12, CNWRA Program Manager Periodic Rept on Activities of CNWRA, for Fiscal Reporting Period 990731- 0827.All Variances Expressed with Regard to Current Operations Plans ML20211M5861999-09-0202 September 1999 Forwards non-proprietary & Proprietary Response to NRC 990708 RAI Re TS Change Request 272,reactor Coolant Sys Coolant Activity.Proprietary Encl Withheld ML20211M6591999-09-0101 September 1999 Forwards Errata Page to 990729 Suppl to TS Change Request 274,to Reflect Proposed Changes Requested by . Page Transmitted by Submitted in Error ML20211L2401999-09-0101 September 1999 Submits Response to NRC AL 99-02, Operator Reactor Licensing Action Estimates ML20211H3731999-08-27027 August 1999 Responds to NRC 990810 RAI Re TMI LAR 285 & TMI-2 LAR 77 Re Changes Reflecting Storage of TMI-1 Radioactive Matls in TMI-2 Facility.Revised License Page mark-up,incorporating Response,Encl ML20211H4001999-08-27027 August 1999 Responds to NRC 990810 RAI Re TMI-1 LAR 285 & TMI-2 LAR 77 Re Changes to Clarify Authority to Possess Radioactive Matls Without Unit Distinction.Revised License Page mark-up, Incorporating Response Encl ML20211K2391999-08-23023 August 1999 Forwards fitness-for-duty Performance Data Repts for TMI, Oyster Creek & Corporate Headquarters Located in Parsippany, Nj ML20211H5041999-08-20020 August 1999 Forwards Proprietary & non-proprietary Rept MPR-1820,rev 1, TMI Nuclear Generating Station OTSG Kinetic Expansion Insp Criteria Analysis. Affidavit Encl.Proprietary Rept Wihheld 05000289/LER-1999-007, Forwards LER 99-007-01 Re Increasing Failure Rate of ESAS Relays.Rept Supplements Preliminary Info Re Determination of Root Cause & Long Term Corrective Actions.Changes Made for Supplement Are Indicated in Bold Typeface1999-08-20020 August 1999 Forwards LER 99-007-01 Re Increasing Failure Rate of ESAS Relays.Rept Supplements Preliminary Info Re Determination of Root Cause & Long Term Corrective Actions.Changes Made for Supplement Are Indicated in Bold Typeface ML20211A4261999-08-19019 August 1999 Forwards Insp Rept 50-289/99-04 on 990606-0717.Two Severity Level 4 Violations Occurred & Being Treated as Noncited Violations ML20211H3571999-08-19019 August 1999 Forwards Itemized Response to NRC 990712 RAI Re TS Change Request 248 Re Remote Shutdown Sys,Submitted on 981019 ML20211A3931999-08-12012 August 1999 Requests NRC Concurrence with Ongoing Analytical Approach as Described in Attachment,Which Is Being Utilized by Gpu Nuclear to Support Detailed License Amend Request to Revise Design Basis for TMI-1 Pressurizer Supports ML20210R4691999-08-11011 August 1999 Forwards Update 3 to Post-Defueling Monitored Storage SAR, for TMI-2.Update 3 Revises SAR to Reflect Current Plant Configuration & Includes Minor Editorial Changes & Corrections.Revised Pages on List of Effective Pages ML20210N7601999-08-10010 August 1999 Informs That NRC Staff Reviewed Applications Dtd 990629, Which Requested Review & Approval to Allow Authority to Possess Radioactive Matl Without Unit Distinction Between Units 1 & 2.Forwards RAI Re License Amend Request 285 ML20210N7191999-08-0606 August 1999 Forwards Notice of Partial Denial of Amend to FOL & Opportunity for Hearing Re Proposed Change to TS 3.1.12.3 to Add LCO That Would Allow Continued HPI Operation ML20210L3831999-07-30030 July 1999 Responds to NRC 990617 RAI Re OTSG Kinetic Expansion Region Insp Acceptance Criteria That Was Used for Dispositioning Indications During Cycle 12 Refueling (12R) Outage ML20210K7371999-07-30030 July 1999 Forwards Rev 2 to 86-5002073-02, Summary Rept for Bwog 20% Tp LOCA, Which Corrects Evaluation Model for Mk-B9 non- Mixing Vane Grid Previously Reported in Util to Nrc,Per 10CFR50.46 ML20210L1151999-07-28028 July 1999 Confirms Two Senior Management Changes Made within Amergen Energy Co,Per Proposed License Transfer & Conforming Administrative License Amends for TMI-1 05000289/LER-1999-009, Forwards LER 99-009-00 Re 990626 Event Involving Partial Loss of Offsite Power & Subsequent Automatic Start of EDG 1A.Commitments Made by Util Are Contained in long-term Corrective Actions Section1999-07-22022 July 1999 Forwards LER 99-009-00 Re 990626 Event Involving Partial Loss of Offsite Power & Subsequent Automatic Start of EDG 1A.Commitments Made by Util Are Contained in long-term Corrective Actions Section ML20216D4001999-07-22022 July 1999 Provides Summary of Activities at TMI-2 During 2nd Quarter of 1999 ML20210B8231999-07-21021 July 1999 Forwards Exemption from Certain Requirements of 10CFR50.54(w) for Three Mile Island Nuclear Station,Unit 2 in Response to Licensee Application Dtd 990309,requesting Reduction in Amount of Insurance for Unit to Amount Listed ML20210G9471999-07-15015 July 1999 Forwards Pmpr 99-10, CNWRA Program Manager Periodic Rept on Activities of CNWRA, for Fiscal Reporting period,990605- 0702.Diskette Containing Pmpr in Wordperfect 8 Format Is Also Encl ML20209H9401999-07-15015 July 1999 Forwards Copy of Environ Assessment & Findings of No Significant Impact Re Application for Exemption Dtd 990309. Proposed Exemption Would Reduce Amount of Insurance for Onsite Property Damage Coverage as Listed ML20209G2451999-07-15015 July 1999 Advises That Suppl Info in Support of Proposed License Transfer & Conforming Adminstrative License Amends,Submitted in & Affidavit,Marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML20212K1701999-07-13013 July 1999 Submits Concerns Re Millstone & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Should Provide Adequate Emergency Planning in Case of Radiological Accident ML20216D9861999-07-12012 July 1999 Forwards RAI Re 981019 Application Request for Review & Approval of Operability & SRs for Remote Shutdown Sys. Response Requested within 30 Days of Receipt of Ltr ML20209G5861999-07-0909 July 1999 Forwards Insp Rept 50-289/99-05 on 990510-28.No Violations Noted ML20209F2571999-07-0909 July 1999 Forwards Staff Evaluation Rept of Individual Plant Exam of External Events Submittal on Three Mile Nuclear Station, Unit 1 ML20209D8451999-07-0808 July 1999 Forwards Insp Rept 50-289/99-06 on 990608-11.No Violations Noted.Overall Performance of ERO Very Good & Demonstrated, with Reasonable Assurance,That Onsite Emergency Plans Adequate & That Util Capable of Implementing Plan ML20209D6291999-07-0808 July 1999 Forwards Notice of Withdrawal & Corrected TS Pages 3-21 & 4-9 for Amend 211 & 4-5a,4-38 & 6-3 for Amend 212,which Was Issued in Error.Amends Failed to Reflect Previously Changes Granted by Amends 203 & 204 ML20209D5141999-07-0808 July 1999 Forwards RAI Re 981019 Application & Suppl ,which Requested Review & Approval of Revised Rc Allowable Dose Equivalent I-131 Activity Limit with Max Dose Equivalent Limit of 1.0 Uci/Gram.Response Requested within 30 Days 05000289/LER-1999-008, Forwards LER 99-008-00 Re Discovery of Degraded But Operable Condition of RB Emergency Cooling Sys.Condition Did Not Adversely Affect Health & Safety of Public1999-07-0202 July 1999 Forwards LER 99-008-00 Re Discovery of Degraded But Operable Condition of RB Emergency Cooling Sys.Condition Did Not Adversely Affect Health & Safety of Public ML20196J3981999-07-0101 July 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. Y2K Readiness Disclosure for TMI-1 Encl ML20209C1131999-07-0101 July 1999 Forwards Signed Agreement as Proposed in NRC Requesting Gpu Nuclear Consent in Incorporate TMI-1 Thermo Lag Fire Barrier Final Corrective Action Completion Schedule Commitment of 000630 Into Co Modifying License 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217D8361999-10-11011 October 1999 Provides NRC with Summary of Activities at TMI-2 During 3rd Quarter of 1999 ML20217F8271999-10-0707 October 1999 Forwards Pmpr 99-13, CNWRA Program Manager Periodic Rept on Activities of CNWRA, for Fiscal Reporting Period 990828- 0924.Diskette Containing Pmpr in Wordperfect 8 Is Encl. All Variances Are Expressed with Regard to Current Plans ML20216J6581999-09-28028 September 1999 Provides Info as Requested of Licensees by NRC in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams ML20212E1971999-09-16016 September 1999 Forwards Rev 11 of Gpu Nuclear Operational QAP, Reflecting Organizational Change in Which Functions & Responsibilities of Nuclear Safety & Technical Support Div Were Assigned to Other Divisions ML20212A2101999-09-13013 September 1999 Forwards Rev 3 of Gpu Nuclear Post-Defueling Monitored Storage QAP for Three Mile Island Unit 2, Including Changes Made During 1998.Description of Changes Provided on Page 2 ML20216G4151999-09-0909 September 1999 Forwards Pmpr 99-12, CNWRA Program Manager Periodic Rept on Activities of CNWRA, for Fiscal Reporting Period 990731- 0827.All Variances Expressed with Regard to Current Operations Plans ML20211M5861999-09-0202 September 1999 Forwards non-proprietary & Proprietary Response to NRC 990708 RAI Re TS Change Request 272,reactor Coolant Sys Coolant Activity.Proprietary Encl Withheld ML20211M6591999-09-0101 September 1999 Forwards Errata Page to 990729 Suppl to TS Change Request 274,to Reflect Proposed Changes Requested by . Page Transmitted by Submitted in Error ML20211L2401999-09-0101 September 1999 Submits Response to NRC AL 99-02, Operator Reactor Licensing Action Estimates ML20211H3731999-08-27027 August 1999 Responds to NRC 990810 RAI Re TMI LAR 285 & TMI-2 LAR 77 Re Changes Reflecting Storage of TMI-1 Radioactive Matls in TMI-2 Facility.Revised License Page mark-up,incorporating Response,Encl ML20211H4001999-08-27027 August 1999 Responds to NRC 990810 RAI Re TMI-1 LAR 285 & TMI-2 LAR 77 Re Changes to Clarify Authority to Possess Radioactive Matls Without Unit Distinction.Revised License Page mark-up, Incorporating Response Encl ML20211K2391999-08-23023 August 1999 Forwards fitness-for-duty Performance Data Repts for TMI, Oyster Creek & Corporate Headquarters Located in Parsippany, Nj 05000289/LER-1999-007, Forwards LER 99-007-01 Re Increasing Failure Rate of ESAS Relays.Rept Supplements Preliminary Info Re Determination of Root Cause & Long Term Corrective Actions.Changes Made for Supplement Are Indicated in Bold Typeface1999-08-20020 August 1999 Forwards LER 99-007-01 Re Increasing Failure Rate of ESAS Relays.Rept Supplements Preliminary Info Re Determination of Root Cause & Long Term Corrective Actions.Changes Made for Supplement Are Indicated in Bold Typeface ML20211H5041999-08-20020 August 1999 Forwards Proprietary & non-proprietary Rept MPR-1820,rev 1, TMI Nuclear Generating Station OTSG Kinetic Expansion Insp Criteria Analysis. Affidavit Encl.Proprietary Rept Wihheld ML20211H3571999-08-19019 August 1999 Forwards Itemized Response to NRC 990712 RAI Re TS Change Request 248 Re Remote Shutdown Sys,Submitted on 981019 ML20211A3931999-08-12012 August 1999 Requests NRC Concurrence with Ongoing Analytical Approach as Described in Attachment,Which Is Being Utilized by Gpu Nuclear to Support Detailed License Amend Request to Revise Design Basis for TMI-1 Pressurizer Supports ML20210R4691999-08-11011 August 1999 Forwards Update 3 to Post-Defueling Monitored Storage SAR, for TMI-2.Update 3 Revises SAR to Reflect Current Plant Configuration & Includes Minor Editorial Changes & Corrections.Revised Pages on List of Effective Pages ML20210L3831999-07-30030 July 1999 Responds to NRC 990617 RAI Re OTSG Kinetic Expansion Region Insp Acceptance Criteria That Was Used for Dispositioning Indications During Cycle 12 Refueling (12R) Outage ML20210K7371999-07-30030 July 1999 Forwards Rev 2 to 86-5002073-02, Summary Rept for Bwog 20% Tp LOCA, Which Corrects Evaluation Model for Mk-B9 non- Mixing Vane Grid Previously Reported in Util to Nrc,Per 10CFR50.46 ML20210L1151999-07-28028 July 1999 Confirms Two Senior Management Changes Made within Amergen Energy Co,Per Proposed License Transfer & Conforming Administrative License Amends for TMI-1 05000289/LER-1999-009, Forwards LER 99-009-00 Re 990626 Event Involving Partial Loss of Offsite Power & Subsequent Automatic Start of EDG 1A.Commitments Made by Util Are Contained in long-term Corrective Actions Section1999-07-22022 July 1999 Forwards LER 99-009-00 Re 990626 Event Involving Partial Loss of Offsite Power & Subsequent Automatic Start of EDG 1A.Commitments Made by Util Are Contained in long-term Corrective Actions Section ML20216D4001999-07-22022 July 1999 Provides Summary of Activities at TMI-2 During 2nd Quarter of 1999 ML20210G9471999-07-15015 July 1999 Forwards Pmpr 99-10, CNWRA Program Manager Periodic Rept on Activities of CNWRA, for Fiscal Reporting period,990605- 0702.Diskette Containing Pmpr in Wordperfect 8 Format Is Also Encl ML20212K1701999-07-13013 July 1999 Submits Concerns Re Millstone & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Should Provide Adequate Emergency Planning in Case of Radiological Accident 05000289/LER-1999-008, Forwards LER 99-008-00 Re Discovery of Degraded But Operable Condition of RB Emergency Cooling Sys.Condition Did Not Adversely Affect Health & Safety of Public1999-07-0202 July 1999 Forwards LER 99-008-00 Re Discovery of Degraded But Operable Condition of RB Emergency Cooling Sys.Condition Did Not Adversely Affect Health & Safety of Public ML20196J3981999-07-0101 July 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. Y2K Readiness Disclosure for TMI-1 Encl ML20209C1131999-07-0101 July 1999 Forwards Signed Agreement as Proposed in NRC Requesting Gpu Nuclear Consent in Incorporate TMI-1 Thermo Lag Fire Barrier Final Corrective Action Completion Schedule Commitment of 000630 Into Co Modifying License ML20196J7651999-06-29029 June 1999 Provides Updated Info Re Loss of Feedwater & Loss of Electric Power Accident Analyses to Support TS Change Request 279 Re Core Protection Safety Limit,As Discussed at 990616 Meeting ML20196J7701999-06-29029 June 1999 Forwards LAR 285 for License DPR-50,clarifying Authority to Possess Radioactive Matls Without Unit Distinction,So That After Transfer of TMI-1 License to Amergen,Radioactive Matls May Continue to Be Moved Between TMI-1 & TMI-2 Units ML20209C0391999-06-29029 June 1999 Forwards LAR 77 to License DPR-73,clarifying Authority to Possess Radioactive Matls Without Unit Distinction,So That After Transfer of TMI-2 License to Amergen,Radioactive Matl May Continue to Be Moved Between TMI-1 & TMI-2 Units ML20196G2061999-06-23023 June 1999 Requests That NRC Update Current Service Lists to Reflect Listed Personnel Changes That Occurred at TMI 05000289/LER-1999-006, Forwards LER 99-006-00,providing Complete Description,Extent of Condition & Actions Taken in Association with Determination of Inability of Pressurizer Support Bolts to Meet FSAR Requirements1999-06-23023 June 1999 Forwards LER 99-006-00,providing Complete Description,Extent of Condition & Actions Taken in Association with Determination of Inability of Pressurizer Support Bolts to Meet FSAR Requirements ML20196D2171999-06-17017 June 1999 Forwards Pmpr 99-9, CNWRA Program Manager Periodic Rept on Activities of CNWRA, for Fiscal Reporting period,990508- 0604.New Summary Personnel Table Was Added to Rept Period.Matl Scientist Joined Staff Period ML20196A0431999-06-15015 June 1999 Providess Notification That Design Verification Activities Related to Calculations Supporting Analytical Values Identified in Gpu Nuclear Ltr to NRC Has Been Completed 05000289/LER-1999-004, Forwards LER 99-004-00,re Discovery of Emergency FW Pump Bearing Failure During Performance of Oil Change on 990510. Event Was Determined Reportable IAW 10CFR50.73,since Pump Was Determined to Be Inoperable Longer than TS AOT1999-06-0909 June 1999 Forwards LER 99-004-00,re Discovery of Emergency FW Pump Bearing Failure During Performance of Oil Change on 990510. Event Was Determined Reportable IAW 10CFR50.73,since Pump Was Determined to Be Inoperable Longer than TS AOT ML20212K2541999-06-0808 June 1999 Submits Concerns Re Millstone NPP & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Requests That NRC Provide Adequate Emergency Planning in Case of Radiological Accident ML20212K2671999-06-0808 June 1999 Submits Concerns Re Millstone NPP & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Requests That NRC Provide Adequate Emergency Planning in Case of Radiological Accident ML20195E2751999-06-0404 June 1999 Informs That PCTs & LOCA Lhr Limits Submitted in Util Ltr for LOCA Reanalysis Performed in Support of TMI-1 20% Tube Plugging Amend Request Have Been Revised.Revised PCT & LOCA Lhr Limit Values Are Provided on Encl Table 1 ML20195E3281999-06-0404 June 1999 Forwards Application for Amend to License DPR-50,modifying Conditions Which Allow Reduction in Number of Means for Maintaining Decay Heat Removal Capability During Shutdown Conditions ML20195C5721999-06-0202 June 1999 Forwards Description of Gpu Nuclear Plans for Corrective Actions for 1 H Fire Barriers in Fire Zones AB-FZ-3,AB-FZ-5, AB-FZ-7,FH-FZ-2 & Previous Commitments for Fire Zones CB-FA-1 & FH-FZ-6 ML20207E2561999-05-25025 May 1999 Submits 30-day Written Rept on Significant PCT Change in ECCS Analyses at TMI-1 ML20195B2461999-05-21021 May 1999 Forwards Itemized Response to NRC 990506 RAI for TS Change Request 279 Re Core Protection Safety Limit ML20206R6461999-05-13013 May 1999 Forwards Rev 39 of Modified Amended Physical Security Plan for TMI 05000289/LER-1999-003, Forwards LER 99-003-00, Discovery of Condition Outside UFSAR Design Basis for CR Habitability, Which Was Determined Reportable on 990310.Rept Is Being Submitted Four Weeks Later than Required,Per Discussion with NRC1999-05-0707 May 1999 Forwards LER 99-003-00, Discovery of Condition Outside UFSAR Design Basis for CR Habitability, Which Was Determined Reportable on 990310.Rept Is Being Submitted Four Weeks Later than Required,Per Discussion with NRC ML20206K6301999-05-0707 May 1999 Provides Addl Info Re TMI-1 LOFW Accident re-analysis Assumptions for 20% Average SG Tube Plugging as Discussed on 990421 ML20206H0781999-04-30030 April 1999 Forwards Rev 0 to 1092, TMI Emergency Plan. Summary of Changes Encl ML20206J4811999-04-30030 April 1999 Provides Summary of Activities at TMI-2 During First Quarter of 1999.TMI-2 RB Was Not Inspected During Quarter.Routine Radiological Surveys of Auxiliary & Fuel Handling Bldgs Did Not Identify Any Significant Adverse Trends ML20206E4121999-04-27027 April 1999 Requests That TS Change Request 257 Be Withdrawn ML20206C5211999-04-23023 April 1999 Requests Mod to Encl Indemnity Agreement Number B-64,on Behalf of Gpu & Affiliates,Meed,Jcpl,Penelec & Amergen Energy Co,Llc.Ltr Supersedes & Withdraws 990405 Request Submitted to NRC ML20206C8261999-04-22022 April 1999 Submits Financial Info IAW Requirements of 10CFR50.71(b) & 10CFR140.21 1999-09-09
[Table view] Category:UTILITY TO NRC
MONTHYEARML20059H5351990-09-10010 September 1990 Forwards Encls 1-3 of Generic Ltr 90-07 Re Operator Licensing Exam Schedule ML20059G0641990-08-31031 August 1990 Advises That Util Agreed to Revised Frequency of Once Every 12 Months for Corrective Actions Audits Per Tech Spec Change Request 65 Based on 900718 & 19 Discussions ML20059F1691990-08-30030 August 1990 Requests Exemption from Requirements of 10CFR50,App J, Section III.D.1(a) for Facility Re Schedule Requirements for Connecting Type a Testing w/10-yr Inservice Insp Interval, Per 10CFR50.12(a)(2) ML20064A4661990-08-30030 August 1990 Responds to 900803 SALP Rept 50-289/89-99.TMI Does Not Expect to Be Lead Plant for Installation of Advanced Control Sys.Maint Backlog Goals Established.Info on Emergency Preparedness & Engineering/Technical Support Encl ML20059C8791990-08-29029 August 1990 Forwards TMI-1 Semiannual Effluent & Release Rept for Jan - June 1990, Including Executive Summary of Effluent Release Rept,Disposal & Effluent Release Data & Assessment of Radiation Doses.No Changes to ODCM for Reporting Period ML20059D5491990-08-29029 August 1990 Responds to NRC Re Notice of Violation & Proposed Imposition of Civil Penalty Re Personnel Inattentiveness & Failure of Site Managers to Correct Condition.Shift & Immediate Supervisor Discharged ML20059C7851990-08-27027 August 1990 Forwards Rev 5 to Sys Description 3184-007, Solid Waste Staging Facility, Updating Minor Changes to Pages 6,8,9 & 13 ML20059C1091990-08-24024 August 1990 Forwards Rev 6 to Physical Security Contingency Plan.Rev Withheld ML20059B8251990-08-24024 August 1990 Forwards Payment of Civil Penalty in Amount of $50,000,per NRC ML20056B4651990-08-20020 August 1990 Corrects Statement Made in 900716 Response to NRC Bulletin 90-001, Loss of Fill-Oil in Rosemount Transmitters. Identified That Only Half of Operating Crews Provided W/ Briefing on Bulletin ML20058Q1851990-08-17017 August 1990 Requests That Distribution List for TMI-2 Correspondence Be Updated to Be Consistent W/Recently Implemented Organizational Changes.Ee Kintner,Mb Roche & Wj Marshall Should Be Deleted ML20058Q1721990-08-13013 August 1990 Forwards TMI-2 Effluent & Offsite Dose Rept,First Quarter 1990, Update ML20058Q1821990-08-13013 August 1990 Advises That Util Will No Longer Provide Annual Update to Dewatering Sys for Defueling Canisters Sys Description,Per NRC .W/Completion of Defueling & Shipment of All Defueling Canisters Offsite,Sys Has Been Deactivated ML20058M7201990-08-0303 August 1990 Forwards Rev 2 to TER 3232-019, Div Technical Evaluation Rept for Processed Water Disposal Sys. Mods Include Elimination of Pelletizer & Relocation of Druming Station to Discharge of Blender/Dryer ML20055J4581990-07-27027 July 1990 Responds to Violations Noted in Insp Rept 50-289/90-10. Corrective Actions:Missing Support Brace on Cable Tray Support Found & Corrected ML20055J4561990-07-27027 July 1990 Advises That Info Contained in Generic Ltr 90-06,not Applicable to Current Nonoperating & Defueled Condition of Facility.Generic Ltr Will Be Reevaluated,If Decision Made to Restart Facility ML20055H6901990-07-20020 July 1990 Forwards Rev 25 to TMI-2 Organization Plan for NRC Review & Approval.Rev Proposes Consolidation of Plant Operations & Maint Sections Into Plant Operation & Maint Section ML20055G4431990-07-19019 July 1990 Forwards Rev 12 to 990-1745, TMI-1 Fire Hazards Analysis Rept & Update 9 to FSAR for TMI-1 ML20055G8781990-07-19019 July 1990 Discusses Compliance W/Reg Guide 1.97 Re Containment High Range Radiation Monitors,Per 900507-11 Insp.Physical Separation of Power Cables & Required Isolation Will Be Provided to Satisfy Reg Guide Category 1 Requirements ML20055F9601990-07-11011 July 1990 Forwards, 1990 TMI Nuclear Station Annual Emergency Exercise Scenario to Be Conducted on 900912.W/o Encl ML20044A9531990-07-0909 July 1990 Forwards Util Response to Weaknesses Identified in Maint Team Insp Rept 50-289/89-82.Corrective Actions:Engineering Personnel Reminded to Assure Documented Approval Obtained Prior to Proceeding W/Work ML20055E0481990-07-0505 July 1990 Documents Action Taken by Util to Improve Heat Sink Protection Sys & Current Status of Sys.Main Feedwater Logic Circuits Modified Prior to Startup from 8R Outage to Eliminate Potential for Inadvertent Isolation ML20055E0011990-07-0202 July 1990 Forwards Revs 1 & 2 to Topical Rept 067, TMI-1 Cycle 8 Core Operating Limits Rept, Per Tech Spec 6.9.5.4 ML20055C9971990-06-28028 June 1990 Forwards Rev 27 to Physical Security Plan.Rev Withheld ML20055D2071990-06-28028 June 1990 Forwards Certification of TMI-1 Simulation Facility,Per 10CFR55.45.b.5.Resumes of Personnel Involved Encl. Resumes Withheld (Ref 10CFR2.790(a)(6)) ML20055D0861990-06-25025 June 1990 Documents Deviation from Requirements of Reg Guide 1.97,per Insp on 900507-11.Based on Most Limiting Analysis,Existing Range of 0-1,200 Psi Sufficient.Deviation Consistent W/B&W Owners Group Task Force Evaluation of Reg Guide ML20043H4851990-06-18018 June 1990 Forwards Application for Amend to License DPR-50,consisting of Tech Spec Change Request 179 ML20043H4031990-06-18018 June 1990 Responds to Generic Ltr 90-04, Request for Info on Status of Licensee Implementation of Generic Safety Issue Resolved W/Imposition of Requirements or Corrective Actions. ML20043F9921990-06-11011 June 1990 Forwards Listing of Exam Ref Matl Sent on 900601 in Response to 900505 Ltr ML20043F0661990-06-0404 June 1990 Forwards Inservice Insp Data Rept for Period 880816-900304. Owner Rept for Repairs or Replacements Performed on ASME Section XI Class 1 & 2 Components,Also Encl ML20055C9041990-05-23023 May 1990 Advises That App a to Rept Is Set of Recommendations from Safety Advisory Board on Possible Research Opportunities ML20043B2391990-05-18018 May 1990 Revises Commitments in Encl Met Ed 800430 Ltr Re QA of Diesel Generator Fuel Oil.Requirement for QC Review for Acceptability Prior to Filling Diesel Generator Fuel Oil Storage Tanks Deleted from Procedure ML20043A5441990-05-16016 May 1990 Discusses Status of Safety & Performance Improvement Program Portion of B&W Owners Group EOP Review Project ML20043A5311990-05-15015 May 1990 Responds to Violations Noted in Insp Rept 50-289/89-82. Corrective Actions:Periodic Insp Program Established Utilizing Checklist for Stored Equipment & Existing Tool Rooms Will Be Purged of Controlled or Unneeded Matls ML20043A2321990-05-11011 May 1990 Forwards TMI-1 Reactor Bldg 15-Yr Tendon Surveillance (Insp Period 5) Technical Rept 069.Evaluations Conclude That Test & Insp Results Demonstrate TMI-1 Reactor Bldg post- Tensioning Sys in Good Condition ML20042G2741990-05-0404 May 1990 Forwards Semiannual Update of Projects Listed in Categories A,B & C of long-range Planning Program Integrated Schedule ML20012F2621990-04-0202 April 1990 Responds to Violation Noted in Insp Rept 50-289/89-26. Corrective Actions:Util Policy of Shift Supervisor Involvement in Bypassing & Resetting Safety Sys Expanded to Include Shutdown Conditions & Technicians Briefed ML20012F2611990-04-0202 April 1990 Provides Supplemental Response to Station Blackout Rule. Target Reliability of 0.975 Chosen for Emergency Diesel Generators.Diesel Generator Reliability Program May Change Based on Final Resolution of Generic Issue B-56 ML20012F2731990-03-30030 March 1990 Confirms 900328 Conversations & Provides Technical Basis for Planned Actions to Correct Present Power Limitation Due to High Steam Generator Secondary Side Differential Pressure. Main Turbine Will Be Tripped from 80% Power ML20042D8281990-03-23023 March 1990 Fulfills Requirements of Tech Spec Section 4.19.5.a Re once-through Steam Generator Tubes post-inservice Insp Rept for Unscheduled Outage 8U-1 ML20012D7001990-03-22022 March 1990 Forwards Util Response to Generic Ltr 90-01 Re NRC Regulatory Impact Survey.Site Mgt & Staff Hour Categories Added to Response ML20012D7121990-03-21021 March 1990 Forwards Rev 0 to TMI-1 Cycle 8 Core Operating Limits Rept. ML20012C4771990-03-12012 March 1990 Responds to Generic Ltr 89-19, Request for Action Re Resolution of USI A-47, 'Safety Implication of Control Sys in LWR Nuclear Power Plants,' Per 10CFR50.54(f). Current Design Adequate W/O Addl Tech Specs ML20012B8241990-03-12012 March 1990 Forwards Application for Tech Spec Change Request 199 to License DPR-50,revising Tech Specs Re Steam Generator Tube Insp Requirements ML20055C3931990-02-23023 February 1990 Documents Interpretation of Tech Spec 4.19.5.a Re once- Through Steam Generator Tube post-inservice Insp Rept for Refueling Interval 8R.Total of Eight Tubes Removed from Svc by Plugging ML20011F5251990-02-23023 February 1990 Documents Interpretation of Tech Spec 5.3.1.1 Re Design Features of Fuel Assemblies in Light of Issuance of Generic Ltr 90-02.Tech Spec Change Request Re Utilization of Dummy Fuel Rods or Open Water Channels Will Be Filed by 900420 ML20011F6651990-02-22022 February 1990 Forwards Updated Status Summary of Consideration of TMI-1 PRA Recommendations as of 891231.Changes to Torque Switch Settings for DH-V-4A & B Will Be Implemented in Refueling Outage 8 Re Closing Against High Differential Pressure ML20006C2901990-01-26026 January 1990 Provides Addl Info Supporting Deferral of Seismic Qualification Util Group Walkdowns to 10R Outage.Performance of Walkdowns Provide Proper Scheduling & Priority for Resolution of USI A-46 for TMI-1 ML20011E1221990-01-26026 January 1990 Forwards Response to Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment. Audit Rept Determined That Operation of Decay Heat Closed Cooling Water Sys Consistent W/Design Basis Documents ML19354E8601990-01-25025 January 1990 Requests Approval for Use of B&W Steam Generator Plugs Mfg W/Alternate Matl (nickel-base Alloy/Alloy 600).Alloy 600 Has Superior Corrosion Resistance to Primary Water Stress Corrosion Cracking 1990-09-10
[Table view] |
Text
p
- a. ,
y
- OPU Neoleer Corporation i
e my One Upper Pond Road -
Wu Parstaeny, New Jersey 07054 !
201 316 7000 :
TELEX 136-482 Wilter's Direct Dial Number: -
November 3, 1989 j
! C000-89-0758 C311-89-2114 ;
)
(TAC No. 65824)
U. S. Nuclear Regulatory Commission Attention: Document Control Dask }
Whshington, D.C. 20555 ,
I f
n L
, Centlemen
Subject:
Three Mile Island Nuclear Station, Unit No. 1 (THI-1)
Docket No. 50-299 Operating License No. DPR-50 ;
Long Range Planning Program (LRPP)
Update of Integrated Schedule
Pursuant to License DPR-50 Cond. tion No. 2.c.9, GPUN hereby submits the ;
required semi-annual update of projects listed in each of the Categories A, B, :
and C of the LRPP integrated schedule. The two attachments to this letter provide 1) the ABC project listing; and, 2) a rummary of changes since our last .
update (GPUN Letter No. CJ11-89-2051 dated May 4, 1989 ). These attachments I contain details as follows: ;
- 1. Attachment A - A new project listing of Category A, B, and C projects annotated by an asterisk (*) to identify new projects, and by a double !
astorisk (**) to identify changes in Budget Authorization (B/A) number assignments. Completed projects inave been removed f rom the schedule listing. Remaining projects are ongoing or are scheduled consistent '
.with cycle / year commitments. Any changes in schedule are reflected on i Attachments A and B. l
- 2. Attachment B - A-summary listing of category A and B projects which l have been completed, deferred, changed in scope, or otherwise have had (
schedule changes with explanations as appropriate. The listing also ,
j contains Category C project completions. Changes to the Category C ,
scope or schedule do not impact Categories A or B schedules. !
- r 31015389 .
l 891114C1225 891103 PDR ADOCK 05000299 g PDC
/40ol f \ .
GPU Nuclear Corporation is a subsidiary of General Pubhc Utilites Corporation
' 'El y, Page Two (C311-89-2114; TAC N3. 65824) :
November 3,-1989- ,
i U. S. Nuclear Regulatory Commission , .;
one addition to the list of Category A projects has been made by this submittal i for the mandated Fitness-for-Duty Program required by 10 CFR 26; and, four (4)- .
additions have been made to the list of Category 3 projects. In addition, i
- - Attachment B descri';?e several changes to the list of category B projecte bq affacting schsiv*,d, scope, or project identifications. Pursuant to the LRPP-
[
for THI-1, .it' will be assumed that you are in agreement with the above category >
B changes if you do not respond to this submittal within 30 days of receipt. . t c,
I' !j Sincerely, ,
R. L. Longg / ;
- g. Vice Presige6t.and Director of I
[- Planning and Nuclear Safety ~ ,
GMG/RLL/ag j i, a cci R. Hernan (NRC) ~
[
J. S';olts (NRC) .
W. Russel (NRC) {
( F. Young'(NRC Resident Inspector THI-1) !
f t
f I
[
, t s ?
I L 1 v ,
i $
L L i i f i-V s
[
31015389 ;
.i
.;z
-.i ECT . LIOT100 TOI.1 PO
-____ .. _- .._.-- --- =__ .--____ -.
CATECORY
- A' PROJECTS SORT SY CATEGORY / CYCLE /BA STATUS AS OF 91089W99
_.._ _............-__......- ..__---... _...=-_-- =-- =-.......- _..... --__....._-..... _......_--..____ _.......................
083 BA DESCRIPTION CYCLE /
NUW8ER CLASSIFICATION YEARS
_ _ . . _ - - - - - - ------__=. __..._.- - - - - - = _ = ===---=--- - ___--..._.....__ - ..._...... __.______ .....------ -.. ..........__.-
1 412491 REG GUIDE 1.97 0800S D8R MNt CR FINAL TIE-INS WITN PLANT COtepuTER.
REF RIEaIO 5211 87-3180,LAI 87-9155 2 412531 Puesp RECIRC FLOWaIETERS FOR IST 084 NRR AS INSTALL FLOWIEETER ON RECIRC LINE FOR '
WDL-P13A/8; INSTALL RECIRC LOOP AND FLOWIAETER FOR CAP-1A/8. LAI 87-9045 3 412462 ANTICIPATE TRANSIENT W/O SCRAas(ATWS) RULE 09R NRR CR RELR C8 T8 ~
asODIFICATIONS TO FULFILL REOUIREGIENTS OF 10 CFR 50.62. LAI 88 9260 4 412567 STATION BLACKOUT 09R NRR ENGINEER AND INSTALL RECOesIEENDED PLANT 8800S IN ACCOROANCE WITN 10CFR50.63, LAI 89-9083 5 126212
TCI-1 PQ ECT LICTIQQ' CATEGORY '8' PROJECTS SORT SY CATEGORY / CYCLE /BA
_ ------------------------------------------------------_---- STATUS AS Or eleseve9 OSS BA
=--
- ---- -. - ------------- = ==-------------------
DESCRIPTION CYCLE / CLASSIFICATION NUMBER YEARS 6 123227 INSERVICE RX BLOG TENOON SURVEILLANCE 07 NRR INSPECT APPROXItsATELY 10 TENDONS REF. NUREG 135.1.T.S. 4.4.2.1 7 412551 INSTRutsENT AIR UPGRADES 08 ISM INCREASE CAPACITY Or INSTRuteENT AIR SYSTEMS. (SPIP REC.)
REF. C311-88-2092 8 123230 ILRT 08R NRR R8 INTEGRATED LEAK RATE TEST OF CONTAINRIENT - 1990.
9 123253 OTSG TUBE PLUGGING - SR 08R NRR R8 PLUG OTSG TUBES AS NECESSARY. '
10 123257 FUEL esOVEasENT FOR 8R CORE. LOAD 08R NRR
, R8 ALL tsORK REQUIRED FOR REACTOR HEAD AND PLENUIs REtIOVAL $ REINSTALLATION. FUEL
. SHUFFLE S INSTALLATION OF THE SEAL PLATE 11 123280
- PRESSURIZER SURGE LINE INSPECTION 08R NOR R8 VISUALLY INSPECT THE 10" PRESSURIZER SURGE LINE.EEO. BY NRC BULLETIN 88-11.
! FUNOING BA 123250sLAI 89-9030.89-9026 12 126204 OTSG EDOY CURRENT TESTING 08R NRR R8 ECT OF SAtsPLE INSPECTION GROUPS INSPECT 20% PER EPRI GUIDELINES TSCR 193 13 126205 TMI INSERVICE INSPECTION (OUTAGE 8R) 08R NRR
, ALL ASesE SECT XI INSPECTIONS: AUGesENTED ISI TO COGIPLY WITH 10 CFR 50.55.
le 412538 HEAT SINK PROTECTION SYSTEni UPGRADE 08R NRR CR C8 INSTALL DIFFERENT CR INDICATOR FOR -
asSRO: OTHER asOOS IDENTIFIED SY OPS, MAINT AND PLANT ENG.LAI 87-9283.
d -
ECT
~
TCI-1 PQ L I O Y I C3 O CATEGORY *8* PROJECTS SORT SY CATEGORY / CYCLE /SA STATUS AS Or 01NOVs9
~
= - . - - - - - - - - - - - - . - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
=== = --- ---------------------------------------;
-OSS BA DESCRIPTION CYOLEI CLASSIFICATION NUMBER TEARS
-- ------------- =_- .- ----- -
.-_--- --- ------------------ ----___-_ - - - - - - - - - . . . . - - . . . _ = _ - - - - - - - - - - . - - - . - - - - - - - - - . - -
15 412551 INSTRUMENT AIR UPGRADES 08R ISM IMPROVE FILTRATION AND INSTRUMENT. MODIFY IA-SA X-OVER.
(SPIP RECIREF.C311-88-2092 1G 412566 CONTROL ROOM NOISE REDUCTION MOOS OSR ISM CR CHIME.GLO8AL SILENCE. TILES, FIRE DET DANEL esOO, RMS SYPASS (SPIP REC) REF. C311-88-2992 17 123275 OTSG TUSE PLUGGING 099 NOR R8 PLUG OTSG TUBES AS NECESSARY.
18 123278 9R REACTOR REFUELING 099 NRR R8 80 NEW FUEL ASSEMBLIES. FULL CORE OFFLOAD.
i 19 123287
- MAIN STEAM SYSTEM TEST - 99 099 NRR R8 PERFORM NYDROSTATIC TEST OF OTSG, MS AND FW PIPING. REQUIRED BY 10 CFR 50.55 29 126A09 OTSG EDOY CURRENT TESTING 09R MRR e R8 ECT OF SAMPLE INSPECTION GROUP:
' INSPECT 20s PER EPRI GUIDELINES TSCR 193 I 21 126C09 TMI INSERVICE INSPECTION (OUTAGE 9R) 09R MRR l ALL ASME SECT XI INSPECTIONSg AUGMENTED ISI j TO COMPLY WITH 10 CFR 50.55.
22 126203 RX VESSEL INSERVICE INSPECTION 9R 09R NR5r R8 PERFORM 10 YEAR RX VESSEL INSERVICE INSPECTIONS TO COMPLY WITH 10CFR50.55 AND T.S.4.2 i
23 41xADR LM'4ANCED DECAY HEAT REMOVAL ISONITORING 099 NOR R8 RESPONSE TO GENERIC LETTER 88-17 LOSS OF DN REGIOVAL. GPUN RESPONSE C311-88-2165.
. (REF LAI 89-9041)
TCI. 1 PQ ECT 1. I O T I- C3 0
_ = - - - - - - - - - -_ --- .......-.._-. ,.
CATEGORY *8' PROJECTS SORT SY CATEGORY /CYCLf!/BA STATUS AS Or 01NOVW
- - - - - - - - - - - - - - - - - - - . . . . . . _ - - = - - - - - . . . - - . . . . - - - . . . . . . . . . - - - .-- - - - - - -
..........--s.- .... ..........--..
OSS BA DESCRIPTION CYCLE / CLASSIFICATION NUMBER YEARS
= - - - _ _ - _ - - - - - . . . . - . . . . . . . - - - - - - - . . . . . . = = = _ - - - - . . . - - . . . . - - - - - - - = = - _
=-- --. --.......... ..............
23 412556 TMI-I MAIN ANNUNCIATOR REFORMATTING 094 ISM CR RELR ADD NEW ALARMS. COMBINE AND ELIMINATE ALARWSs RECONFIGURE OVERNEAD PANELS.
25 123289 ** ILRT . 10R 10R NRR R8 INTEGRATED LEAK RATE TEST OF CONTAINMENT . 1993.
23 123290 ** OTSG TUBE PLUGGING . 10R 10R NOR 98 PLUG OTSG TUBES AS NECESSARY.
27 123294 ** RX REFUELING . 104 10R NOR 98 l 80 MER FUEL ASSEMBLIES.
, 28 126A10 OTSG EDOY CURRENT TESTING 100 NOR R8 ECT OF SAMPLE INSPECTION GROUP INSPECT 20X PER EPRI GUIDELINES TSCR 193
- 29 126C10 TMI INSERVICE INSPECTION 10R NOR
- ALL ASME SECT XI INSPECTIONS
- AUGMENTED ISI TO COMPLY WITN 10 CFR 50.55.
4 33 128098 SAFETY PERF IMPROVEMENT PROG EVALUATIONS 86-89 NOR RELR CR EVALUATIONS OF RECOMMENDATIONS FOR PROCEDURE CHANGES-BWOG SPIP
' PROGRAM REF C311-88-2092 4
31 412512 SAFETY PERF IMPROVEMENT PROG (SPIP) 88 90 NOR MODS TO IMPLEMENT SPIP RECOMMENDATIONS.
REF. C311-88 2092 32 128099
- TME-E INDIVIDUAL PLANT EVALUATION 88-92 NOR IKadSTRY DEGRADED CORE ACTIVITIES S PLANT SPECIFIC NRC SUBMITTAL.
(REF LAI 89-9201)
I
. 1 T01 1 PQ ECT t. I C T 1 0 0-
.... - =- _- - ..--....--...--.. - .
CATEGORY 'S' PROJECTS SORT SY CATEGORY / CYCLE /BA STATUS AS OF 9tNOvet -i
--_..----____ - = - - _ _ - _ = - - = _ -_-_ _ _ _ . . . = _- __==_
._ __- --____ ___ -=......-.-- ._ _ _ _
OSS SA DESCRIPTION CYCLE / CLASSIFICATION NUMBER YEARS
- .--......== --- _ = - - - - = - . ------- __-==------- _
33 128097 SQUG USERS GROUP P5tOGRAM 88 93 NRR SEISMIC QUALIFICATION UTILITY GROUP PARTICIPATION 33 418057 CONSOLIDATICd PLA:t 88/89 NRR TASKS TO BE ACCOMPLISHED TO CONSOLIDATE TMI-1 AND 2 SECURITY; LAI 88 9019.
35 418714 MECH FILTER LEAD PROCESS SHIELD 39 NRR PURCNASE 3" LEAD PROCESS SHIELD ANO FILTER TRANSFER CASK LAI-87-9243 33 126209 ISI UPDATE $9 91 NRR UPDATA ISI PROGRAM IN ACCORDANCE WITH
, ASME S&PV CODE REQUIREMENTS i REQUIRED BY 10CFP50.55, LAI 48 9279 37 126201 ** OUTAGE GENERAL EMPLOYEE TRAINING . TMI.] 89 93 NRR i INSTRUCT IMOIVIDUALS WORKING IN NUCLEAR POWER PLANTS.
38 128108 TF SEISMIC QUALIFICATION OF EQUIP 89 93 NOR SCOPE.WALKDOWNS AND EVALUATIONS FOR SOUG PROGRAM AS REQUIRED SY NRC GL 87 02 5 LAI 87 9084.
33 412523 REPLICATE SIMULATOR CERTIFICATION UPGRO 89-93 tIRR UPGRADE SIMULATOR CONSISTENT WITH i CONTROL ROOM MODIFICATIONS.
~ - - . -.
~
b TOI-1 00 ECT L I 6 T I CI O
- - - = = -----==----:-=---_-- -
CATEGOCT C' PROJECTS SORT SY CATEGORY / CYCLE /BA STATUS AS OF GINOW99
_------_-----_-_--------_-----__------------__------_----_--- - = - - _ _ - _
_=--- ------_--------_--_--_-----------.---
NIS SA DESCRIPTION CYCLE / CLASSIFICATION NUMGER YEARS
_--_----- ==--- ------__-_---_____-----_--------_- -- ------- -- -------- _ -
40 412541 ADDITIONAL 8BAINTENANCE PLATFORMS 07 GWC 18 78 INSTALL ISAINTENANCE PLATFOReeS IN THE INTERGIEDIATE AND TUR8INE SUILDINGS
, 41 412ADN TUR8INE LUBE OIL STORAGE TANK 08 ~E REPLACE TUR8INE LUBE OIL TANK & PIPE W/
i FIBERGLASS W/ LEAK PREVENT 5 CCTECT.
REQUIRED BY 40CFR200 42 412577
- ADD *L TURS. BLDG. 5 INT. BLOG. PLATFORMS 08 ISM T8 IB DESIGN, PROCURE AND INSTALL PEROSANENT RSAINTENANCE PLATFOResS IN THE TUR8INE BLG INTERGIEDIATE SLDG AND 8WST TUNNEL
! 43 412580 ** SPENT FUEL NANDLING BRIDGE UPGRADE 08 REL FN8 SPENT SRIDGE- REPAIR / REPLACE CONTROL ROD tsAST, REPLACE DILLON LOAD CELLS, INSTALL PROGgammaam E GEARED SWITCN i 44 123888 OTNER OUTAGE RELATED ACTIVITIES 08R ALL i ALL OUTAGE RELATED ACTIVITIES SUCN AS INSPECTIONS, REPAIRS, SURVEILLANCES.
WINOR 880DIFICATIONS, 1000 SUPPORT, ETC.
i 45 126206 STEAGI EROSION INSPECTION O9R Isas ALL AUGIBENTED INSPECTIONS TO DETECT EROSION / DEGRADATION OF TABI SYSTENS.
i 46 128128 OTSG SECONDARY SIDE INSPECTION 08R IARC RB l INSPECT AND SARIPLE OTSG SECONDARY SIDE TO PREPARE FOR CNElf CLEANING IN 9R 47 128135 OTSG FW NOZZLE SPRAY PLATE REPLACEIEENT G8R IIRC R8 REPLACE 64 ISAIN FW NOZZLE SPRAY j PLATES (32 PER OTSG) 48 128141 PRESSURIZER NTR 8100 (IIII-155) OdR 88RC REPLACE PRESSURIZER NEATER BUNDLE ELECTRICAL CONNECTORS 4
m , = -: - - , . . _ ___ ___ , .
j
..,s-y A- = : . .
^
- i T '* I - 1 1 'r M .- .E C T. L I 6 T I C3 *d 1 W i
-y ---. --- --. 4- _______ __ __
~ '
': . x.
CATEGORY *C* PROJECTS
' SORT BY CATEGORY / CYCLE /BA -
STATUS AS (F-OIMOV49
_ _ = - _ = - ..---------...w ----..... ....--...........--....
OBS BA DESCRIPTION CYCLF/ (,LASSIFICATION
' NUMBER YEARS
---...= ----...----- __-..-----...-- _ _ -_----------...----....:=. -_-- - ----
- _ - - . = - - - - - - - - . _
_40 412271 PLANT PERF MONITOR Ih3TRUMENTATION 08R. *W TB UPGRADE OF INSTRUMENTATL?N TO MEASURE PLANT AND COMPCNEUT PERFORMANCE 50 412522 REPLACE BAILEY TRANSMITTERS 08R MRC RB TB IB REPLACE 6 BAILEY BY TRANS, INSTALL NEW PWD SUPPLY MODULES, WIRING CHANGES WITHIN ICS/NNI 51 412540 REACTOR BLOG MAINTENANCE PLATFORMS 08R ISM RB PLATFORMS AT RCP lc LOWER MOTOR BEARINGS.RCP-1B COUPLING AREAS, CA-V-194 5 WOG-V2 AREAS 52 412546 OTSG UPPER MANWAY ACCESS PLATFORh. (PAN 08R GMC RB EXPANO EXISTING PLATFORMS TO PROVIDE-UPPER OTSG ACCESS. INSTALL ACCESS PLATFORM TO AH-V-lC.
53 412561 UPGRADE CABLE EOUIPMENT PROTECTION 08R ISet REPLACE 1 CABLE AND 6 CIRCUIT BREAKERS BKRS. REVIEW UNDERSIZED CKTS-SMALL FIXES 54 412562 OTSG COLD LEG DAMS $ HYDROLAZE 08R IDE RB PURCHASE AMD INSTALL DAMS WHICH WILL ALLOW OTSG BOTTOM HEAD ENTRY CONCURRENT WITH REFlJELING.
55 412563 GENERATOR RELAY PROTECTION 08R ORQ TB PROVIDE UNDERFREQUENCY PROTECTION FOR THE MAIN GENERATOR. .
56 412564 REACTOR BLDG FUEL HANDLING UPGRADE 08R REL RB AUX BRIDGE. INSTALL INCHING SYSTEM, INSTALL PROGRAMMABLE GEARED LIMIT SWITCH .
57 412565 MAIN FW FLOW INSTRUMENTATION 08R kEL REPLACE EXISTING FLOW ELEMENT WITH FLANGED VERSION
c, _~ ---
=
~ --
w TCI_1 P-D -E C.T. L I 13.T I N O CATEGORY *C' PROJECTS
-SORT BY' CATEGORY / CYCLE /BA .
STATUS AS OF OINOW49
......_____ .._....__..... ._.._______...._ ___.___ __- - - - - - - - - - - - - _ - - - - - - _ -- -__=.------- =...__..._. _....-- ------
OSS- BA DESCRIPTION CYCLE / CLASSIFICATION 11 . NUMBER YEARS
. ..________..____...._______--- =-- = - . . . . - - - - =_... __.. _________.- __---=- - - ....... _____________ --.._---- ... _
58 412076 POISON FUEL RACKS-POOL A 09 NRR FHB-RERACK FUEL RACKS IN POOL-A-TO PROVIDE END OF LICENSED LIFE STORAGE CAPACITY 59 123FFF OTHER OUTAGE RELATED ACTIVITIES 09R ALL ALL OUTAGE RELATED ACTIVITIES SUCH AS
, INSPECTIONS, REPAIRS, SURVEILLANCES.
MINOR MODIFICATIONS, MOD SUPPORT, ETC.
50 126809 STEAM EROSION INSPECTION 09R NRR ALL AUGMENTED INSPECTIONS TO DETECT ~
EROSION / DEGRADATION OF TMI SYSTEMS.
(
61 128128 OTSG CNEM CLEANING SYSTEM 09R MRC RB CHEMICAL CLEANING OF BOTH OTSG'S USING EPRI/SGOG PROCESS i
62 412075 REPLACE CONTROL RODS 09R IOE
' RB REPLACE 8 CONTROL RODS.
4 63 412553 REPLACE BAILEY TRANSMITTERS - 9R 09R MRC RELR RB REPLACE 10 BAILEY BY TRANSMIT INSTAL NEW POWER SUPPLY MODULES WIRING f
CHANGES IN ICS/NNI 64 412569
- MODIFICATION TO ENHANCE DC-V2/65 CONTROL 09R ISM CR
- PROVIDE OPERATING CONTROLS FOR DC-V-2A/S ANO DC_V-65A/B AND FLOW INDICATION IN 1
THE MAIN CONTROL ROOM-65 412578
- RCP S MS LINE HANGAR PLATFORMS 09R ISM kB 5
- DESIGN, PROCURE S INSTALL PERMANANT PLATFORMS IN RB TO SERVICE RCP.1 AID '
LOWER MOTOR S COUPLNG S MS LINE HANGERS i 66 418705 INCORE DETECTOR REPLACEMENT 09R NRR t RB REPLACE 52 INCORE DETECTORS.
(
. _ =- -Added Proinc.t . . -.
' ~
~~
fQ- .
-- ky T O I.. I P de ECT LIQTICO w- CATEGORY 'C' PROJECTS '
4 SORT BY CATEGORY / CYCLE /BA
_________ ______..___..__________. ____________.. STATUS AS OF OIMOV89.
.--=-----_..______._____.._..=--------------- . . . _ . . . _ _ _ . _ _ _ _ _ _ _ . _ _ - _--- ....
- OBS BA DESCRIPTION CYCLE /
~
NUMBER -
CLASSIFICATION YEARS
. ...._____..________ ________._...____.____.___._ __.- . ---_-__..____._ .-- ---- =--- =-- -___.._______.._----. _ - - - _ - - - - --
67 418759
G8 123DDD OTHER OUTAGE RELATED ACTIVITIES 10R ALL
' ALL OUTAGE RELATED ACTIVITIES SUCH AS INSPECTIONS. REPAIRS, SURVEILLANCES.
MINOR MODIFICATIONS, MOD SUPPORT. ETC.
69 126810 STEAM EROSION INSPECTION IOR NOR ALL AUGMENTED INSPECTIONS TO DETECT EROSION / DEGRADATION OF TMI SYSTEMS.
70 418058 SECURITY ACCESS CONTROL COMPUTER ENHANCE 88-90 NRR ALL REPLACE CARD READERS: UPGRADE MAIN COMPUTER; NEW PRINTER.
, 71 419477 EMERGENCY COMMUNICATIONS SYS UPGRADE 88-90 NRR REPLACE 31 DEDICATED TELEPHONE CIRCUITS WITH MICROWAVE TRANSMISSION SYSTEM.
72 126101 PLANT LIFE ASSURANCE / EXTENSION 88-93 REL
- SUPPORT OF STUDIES BY EPRI S-BWOG FOR FEASIBILITY OF EXTENOING OPERATING LIFE.
73 128114 EPRI STEAM CESERATOR RELIABILITY PROGRAM 88_93 MRC CO-FUNDING FOR EPRI SGRP TASK 404.
74 412536 ADVANCED CONTROL SYSTEM 88-93 ISM DEVELOP A SYSTEM CONFIGURATION TO -
REPLACE THE ICS/NNI SYSTEM WITH THE' ADVANCED CONTROL SYSTEM 75 128122 B&W CNNER' S GRGUP PROGRAW 1988/89 88/89 NRR GPUN PARTICIPATION IN THE BWOG.
, , .- _. ~ 2 -, . . _ . . . . ~~ ._ _ -_ __ __#.___ . _ _ _ _ _ _ _._
< - qs . ,,
+ -
p
. :-~ __
7 ;-
2 _
~ _ _
~ -
T C I ECT- L I'O T-I Q 6~
~
+
-- - .1- ~ P M.__----_-_ ---__ __'----- .-- --
- .~
CATEGORY *C' PROJECTS-SORT BY CATEGORY / CYCLE /BA ~ STATUS AS OF 01MOV859 $
-_____--__-_-________-___-________---_---__-________--___-_-___ -_______-__... - - -------- -= ___---____ ____-_-_______ -
- OBS BA ' DESCRIPTION . CYCLE /
NUMBER CLASSIFICATION 4 YEARS
-____ ------__-------_---_-------__--_-__ ---- __--___ -----__.--___- - - _ _ _ - - - - - - - ____---_. ------ -______--__----.__--__ =.
76 128132 AS FOUNO DOCUMENT S DRAWING UPDATE: 88/89 NRR
- MAINTAIN AS-FOUNO DOCUMENTATION (PER 10CFR50 APP
- D .
77 412521 UPGRADE RADWASTE SOLIDIFICATION CAPABIL 88/89 RAD UPGRADE EXISTING SOLID WASTE FACILITY 78 128137 CONFIGURATION MGMT UPGRADE ACTIVITIES 89 -ISM ILLEGIBLE DRAWING REDRAW. CAD CR PANEL DRAWING UPGRADE. CIRCUIT-SCHEDULE DATA BASE GEN.,CARIRS/EDB TAG 8 INTERFACE 79 128138 DESIGN BASIS PROGRAM 89 ISM
' DESIGN BASIS RECONSTITUTION, PERFORM SSFI*S.
80 419648 ADMINISTRATION BUILDING NORTH 89 FAC CONSTRUCT A 200X150 THREE STORY OFFICE BUILDING.
81 419671 ROOF REPLACEMENTS 89 ~FAC l
REPLACE ROOF ON SIMULATOR BLDG 85 l AND EG5G BUILDING 82 419633 UPGRADE DOMESTIC WATER SYSTEM 89 90 FAC SURVEY EXISTING DOMESTIC WATER SYSTEM REPLACE / UPGRADE AS NECESSARY.
83 419665 CONSTRUCT TRAINING LASS 89 90 FAC i
PROVIDE FOR TRAINING LASS IN EXISTING STRUCTURES.
84 412543 PRA SAFETY ENHANCEMENT MODS 89_91 ISM IMPLEMENT MODS RESULTING FROM TMI 1 PRA l
. -- - - - ~ - - - - .._ - -.-__-- - - --
- g. wp L I C T I C3 d -
. .TCI- 1 P Ct c 'E C T.
- = _ _ _ _ _ - - - - - - - - - - - _ _ - - - - _ _ - - - - = = _ - *~
i CATEGORY *C' PROJECTS
. . SORT BY CATEGORY / CYCLE /BA STATUS AS OF OIMOV89
_--_-_----- . .-------.___----_-__.---------.---. .--_---------=- - . - - - _ _ - - __--- - . . - - - =.----_.-_--.-_------ ==-=..--.-
OOS BA DESCRIPTION ' CYCLE / CLAS3IFICATION NUMBER _i YEARS
-_-----------------------------------_---.------ = _ _ _ - _ - - = - - - - - - - - - - - . . . - - - - - - - _ _ - - - - _ _ - _ - - - - - - - - _ - - - _---- _ _--__.-
85 412570 REPLACE GASEOUS CHLORINATION SYSTEM 89-91 ISM ~
STUDY TO REPLACE GASEOUS CHLORINATION SYSTEM FOR CIRC WTR ANO RIVER WTR SYS WITH SODIUM HYPOCHLORITE SYS.
4 86 419X12 ROOF REPLACEMENTS 89-91 FAC REPLACE ROOFS ON BLDG 36. WAREHOUSE 1, WAREHOUSE 3 ANG DEWEY HOUSE.
87 123262 RELIABILITY CENTERED MAINTENANCE DROG 89-93 MRC RCM EVALUATION OF PLANT SYSTEMS TO DEFINE MAINT. ACTIVITIES THAT IMPROVE RELIABILITY.(APPROX. 40 SYSTEMS TOTAL).
I 88 419669 TWI ROADS UPGRADE 89-93 FAC HORTH BRIDGE PAVING. LIBERTY LANE UPGRADE,RESTRIPING. UNIT 2 RX HATCH IMPROVEMENT I
89 418749 TURBINE BUILDING SOUTH ADDITION 89/90 FAC I CONSTRUCT A THREE FLOOR ADDITION ON THE SOUTH SIDE OF THE TURBINE BUILDING TO CONSOLIDATE THE OPERATIONS DEPARTMENT 90 418750
- SERVICE BUILDING ADDITION 89/90 FAC CONSTRUCT AN ADDITION TO THE NORTH SIDE OF TH5i SERVICE BUILDING I
91 419206 MOCK UP FOR QUAL OF RV NOZZLE INSPECT 89/90 NRR FABRICATE RV CORE FLOOD NOZZLE WOCKUPS FOR UT QUALIFICATION FOR ISI INSPECTIONS.
} 92 126207 OPERATOR TRAINING ANALYSIS 89/92 NRR CONOUCT ANALYSIS OF AO.CRO.SF/SS POSITIONS
REFERENCE:
NUREG 1122 93 128139 POST 1989 - CONFIG.MGMT. 90-93 ISM SUPPLEMENT BA 128137 CONFIG MANGT UPGRDE ANO IDENTIFY FUNDING FOR DESIGN BASIS .i RECONSTITUTION BEYONO 1989 l
'~- ~ ~
-~~
3
, .. 7 ., .
- +
~ .
l'. PG t C TL
~
' T D I _ -L I 2 T I N O' -
_-------_---------- _ =-- _-- - - _
...O CATEGORY.*C* PROJECTS ^
4 SORT BY CATEGORY / CYCLE /BA STATUS AS OF 01NOWW9 OBS BA DESCRIPTION CYCLE / CLASSIFICATION-HUMBER YEARS -
= = _ _ -- - - - - - = - - - - - - -...--- __-- __-------------=- ---. _...-...-
94 412581 POST 1989 CONFIG. MANGMNT DESIGN BAS REC 90-93 IDE FUNDING FOR DESIGN BASIS RECONSTITUTION BEYOND 1989 95 128ABH BSW OWNER *S GROUP PROGRAM - 1990/91 90/91 NRR PARTICIPATION IN BSW' OWNERS GROUP PROGRAM.
56 12691D ** TECH SPEC SIMPLITICATION 91 ISM PLANT SPECIFIC IMPLEMENTATION OF BWOG TECH SPEC SIMPLIFICATION PROGRAM 97 418755 RC-P SEAL CARTRIDGE TEST EOPT. 91 MRC PURCHASE CARTRIDGE SEAL TESTER
$8 419XX2 TURBINE BUILDING TOOL SHOP 91 ORR CONSTRUCT MAINT CONTRACTOR. TOOL SHOP ON 305* LEVEL OF TB TO REPLACE PLYWOOD-SHED.
59 419X28 UNIT 2 ADMIN BLDG 91 FAC ENGINEERING STUDY, VENTILATION AND HVAC MODIFICATIONS 100 41989G EMERGENCY PREPAREDNESS AUTO CALLDUT SYS 91 ISM PURCHASE S INSTALL AN AUTODIAL TELEPHONE BASED SYS. TO SUPPLEMENT PAGERS FOR CALL OF ERO PERSONNEL 101 128ABT
- GSW OWNER *S GROUP PROGRAM - 1992/93 92/93 NRR ,
PARTICIPATION IN 88W OWNERS GROUP PROGRAM l02 412552 SOUG MOOS 93 NRR F - , ;.
ALL ,
MODIFY ANCHORAGES / SUPPORTS, REPLACE ^
PROTECTIVF RELAYS TO COMPLY.WITH SEISMIC QUALIFICATIONS. SCOPE NOT DEFINED.
- = Added Proiect .~,.u-...,..c..-,.
.- . - - - . . -. . ~ . , . . , - . - , , . _ . . _ . _ _ - - . . . _ . ~ . _ . -_ . . - . .
p ,
m-:
n.,- - ,
i
- g. 'Il e ..
lf; , > '
+
ATTACHMENT B -
j
}'
CHANGES TO THI-l NUCLEAR GENERATING STATION INTEGRATED SCHEDULE SEMIANNUAL UPDATE (NOVEMBER 4,1989) ,
t QAI1 GORY A PROJECTS Additions: As denoted by
- next to the project title in Attachment A.
Completions: None Deletions: None !
Schedule Changes: None i
e f
f g ,I '
t i
i f
J T
9
, B-1
, ,,, l'
t," ,
V r
i
- e, i
THI-1 Integrated Schedule ATTACHMENT B (continued) ,
CATEGORY B PROJECTS L Additions: Ar denoted by
- next to the project title in Attachment A.
Completions: None i
Deletions: None Schedule Changes: Obs 33 BA 128097 SOUG Users Group Procram and Obs 38 BA 128108 Seismie cualification of' Eauioment - Reschedule of Walkdowns - On October 10, 1988 (C311-88-2134) CPUN provided to the NRC a schedule for the plant walkdown associated with the implementation of USI A-46 at THI-1. This schedule was contingent upon the schedule for completion of generic efforts submitted by the seismic Qualification i Utility Group (SQUG) in its October 9, ;
1987 letter. The SQUG schedule provided i for completion of the Generie Implementation Procedure (GIP) by the end ,
of calendar 1988, followed by NRC review and issuance of a final SER in the second a quarter of 1989.
It is our understanding that the NRC will issue a preliminary SER for A-A6 .,
. implementation in late 1989 with a final SER in mid 1990.- Based.on this SER schedule slippage, the resources that l would be needed'for performing the L walkdowns in the Cycle 9R refueling have l L
been reassigned to other higher priority [
activities at part of the Long Range Planning process. With Cycle 9R resources reassigned, the walkdown is now scheduled for the Cycle 10R outage, currently scheduled to commence October 1993. It is ,
GPUN policy that resources must be '
allocated for refueling outage projects based on the Long Range Plan. The new schedule for TMI is, therefore, consistent with the Long Range Planning Program, CPUN policy and the Integrated Schedule license condition.
B-2 P
U i; '
[ .- -
a'
,; 9 1 V >
i I
Delay of the A-46 walkdown to IOR does not I represent a safety concern since the original design and qualification criteria- !
applied to installed equipment l incorporated inherent conservatisms which provide established. safety margins. These criteria and margins were reviewed and i approved by the NRC during the Licensing ,
Process. The objective of A-46 implementation is to reassess the existing j; margins of safety and to confirm that- ,
acceptable safety margins exist for equipment designed and qualified before i current criteria were developed.
As part of pilot programs, training and i D' other interfaces with EQE Inc. (the prime contractor for SQUG), selective review of i a sampling of THI components and cable. '
trays has already taken place. The result indicates no problems exist with respect to seismic qualification by use of experience data.
obs 37 126201 Outace General Emolovee Trainino was extended to include Outage 10R' ;
currently scheduled for October 1993. '
obs 39 412523 Reclicate simulator Certificatiqn i Unorades was extended through'1993 to be consistent with the current budget.
Other Changes: 1. Budoet Activity (BA) Number Chances l
The following BA_ numbers have been
! changed. There is no change in scope or schedule associated with these changes.
bas which have had their numbers changed i are indicated by a ** in Attachment A.
Qgi Previous BA Number New BA 25 123H10 ILRT-10R 123289 26 123C10 OTSG Tube plugging 10R 123290 27 123A10 Rx Refueling 10R 123294 I 37 12689A outage General Employee 126201 Training B-3
y- ,
r
,; , Q'. N*' ,,
L;;
' ~
V.
- . , , i I '
- TMI-1 Integrated' schedule
!? !
[ 'i' !
+
ATTACHMENT B (continued) I
~ l CATECORY C PROJECTS i Completioect. None. ;
I
/
i
' Deletions: 12690B rsAR Verification !
I:
418707' Letdown' Cooler Replacement. ;
416706 Incore Detector Replacement i 419639 Refurbish. Green Building (BLDG 222) ,"
I: 419670 Electrical Upgrades ;
L-3 Budget Activity !
' Number' Changes:
c4 I- L . ~f-p !QR1 . Previous BA Number New BA .
s'- i 43 412ADA spent Fuel Handling Bridge 412580
'+
Upgrade 96 '128102 Tech spec simplification 12691D -
e
. .+
1h, i
l' i 4 f
I
- (
i -i i
[ '
r
- o. . ,.
t' .
c' f h '
l i
?
i w
t l.
B-4 4 <
7 L i o
- . i. . c_.._., _ . _ , _ . . _ . . .._ ,_ . . , , _ . . _ . -_