ML20043A232
| ML20043A232 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 05/11/1990 |
| From: | Hukill H GENERAL PUBLIC UTILITIES CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20043A233 | List: |
| References | |
| C311-90-2070, NUDOCS 9005210046 | |
| Download: ML20043A232 (1) | |
Text
.,
a.a
,1 lm' l
l
- c
. u Nuclear mera-GPU Nuclear Corporation
,,.u o
i
. Middletown, Pennsylvania 17057 0191
. 717 944 7621" TELEX 84 2386 Writer's Direct Dial Number:
-C311-90-2070 U.'S.
Nuclear'RegulatoryiCommission Attn:. Document. Control Desk'
' Washington,'DC' -20555-
Dear Sir:
Three-Mile Island' Nuclear Station,' Unit 1-(TMI-1).
Operating. License'No. DPR-50 Docket No. 50-289 Reactor Building Tendon Surveillance Test In.accordance with TMI-1 TechnicalcSpecificat' ions (TS) 4. 4. 2.1. 6. a, :
]
~
i enclosed--is the. report, "TMI-1 Rea'ctor-~ Building 1 Tendon < Surveillance j
Test Inspection Period 5 (15' Years) ~," Technical Report (TR) No.1 '069 ~
The:TR includes the=two volume contractor-(Precision l Surveillance'
]
~~
Corp.)-report entitled "15th Year Physical Surveillance of the Three Mile Island. Unit-1 Reactor-Building."'
j 1
Our evaluations conclude that the test _and-inspection results demonstrate the TMI-l' Reactor Building post: tensioning system cis; in good condition and capable of performing its intended function 1
during-all design basisfevents.
The functional' capability: of the i
system remains within design limits andino abnormal relaxation of prestressing forces in the tendons has occurred.
- qj q
Sincerely, d
i 1
ki 1-Vice President and Director,.TMI-1 a
Enclosure
{
HDH/MRK l
cc:
R. Hernan F. Young l
T. Martin J.
Stolz i
0\\
h 0
1 ggp24gggoggggg,
?
- i a
\\
GPU Nuclear Corporation is a subsidiary of General Pubiic'Uhhties Corporation
>