Forwards Rev 12 to 990-1745, TMI-1 Fire Hazards Analysis Rept & Update 9 to FSAR for TMI-1
ML20055G443
Person / Time
Site: Crane Constellation icon.png
Issue date: 07/19/1990
From: Hukill H
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20055G444 List:
References
C311-90-2093, NUDOCS 9007230187
Download: ML20055G443 (1)


Text

-

n.

-~

u.., g, i 5

s MNuoiear MmW ~"

Route 441 South

(.

Middletown, PennsyNania 17057 '

-717 944 7621 TELEX 84 2386 July 19, 1990 Wnter"s Direct Cial Number:

C311-90-2093

- e' 4

9. S ; Nuclear Regulatory Commission J

Attention:

Document Control Desk

.l k

-. ashington, D.C. -20555 W

Gentlemen:

b Three Mile. Island Nuclear Station Unit 1 (TMI-1)

Ic,

-Operating License No. DPR-50 Docket No. 50-289

[

Final Safety Analysis bed. Update -9 W""F Lire Hazards Analysis 4c9rt. RaoWnn 19 [g L

L Enclosed.are one signed original and ten copies of the Final Safety Analysis L'

Report, Update 9, for TMI-1 filed pursuant to 10 CFR 50.71(e). This UFSAR-update contains changes necessary to reflect information, facility changes,-

-i procedure. changes _and analyses up through January 22,-1990, as required by the-rule.. Further, as later information became available, the more current information was incorporated into the; update, time permitting,- e.g., all revised figures in~this Update are based on the latest design drawings revised up through March 30, 1990.

L

.This update reflects a reduction in the number of page changes for Chapter's 3 l

.and 14, as refueling update, (Update 8R) was-submitted on March 5, 1990 and it incorporated fuel cycle changes related to the new fuel core.

h

~

In addition,,as part of the annual SAR update process enclosed [ herewith:is.one

'(1)-copy'of. Revision 12 to the TMI-IgFHAR.

The FHAR, Revision 12, reflects the methodology used at TMI-1~ to meet 10- CFR 50, Appendix R.

Revision of the f

document < resulted from changes to the facility, procedures, 'and.new design L

information having been incorporated since Revision 11, up through

'. March 30,.1990, as annotated by revision bars, l

p gfC'{

l C.]

f'RC N A3 M Q&-

$ rJ A L.

R. p r.

Recd 7 D.

11 Vice President and Director, TMI-1 HDH/GMG/piv Enclosure Sworn and subscribed to before rpe this /Mday of cc:

F. Young, USNRC (w/FSAR and FHAR)

On hk

, 1990.

R. Hernan, USNRC (w/o encl.)

X v

.3 s_L d e nt [.

MM' W. Ruland, USNRC (w/ FSAR only) p 90072301e7 900719 7

Notary public f Namef3mg

'.{DR ADOCK 05000989 SheenRaraum ManyPubic C

ggg,yg mc 4

l GPU Nucleat Ourporation is a subsidiary of the General Public Utihties Corpoe l

~=. -

mAnermsonct w d -

A

- - - - - -