1 9-GPU Nuclear Corporation

. U Nuclear

: c rd r a ~

o Middletown, Pennsylvania 17o57 0191 717 944 7621 TELEX 84 2386 Writer's Direct Dial Number:

March 22, 1990 C311-90-2028 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C.

20555 Gentlemen:

Three Mile Island Nuclear Station, Unit 1 (TMI-1)

Operating License No. DPR-50 Docket No. 50-289 Response to GL 90-01 NRC Regulatory Impact Survey NRC GL 90-01 requested a voluntary response to the NRC Regulatory Impact Survey. The attached sheets contain the Three Mile Island Station Unit i response. Please note we have added categories of Site Management and staff hours. The manheurs listed are the best estimates we have of the time spent.

As noted, this response is'for TMI-1. Oyster Creek Nuclear Generating Station will provide a separate response.

Sincerely, ill Vice President & Director, TM1-1 HDH/DVH/spb:2028 cc:- J. Partlow T. Martin R. Hernan F. Young lj p

gp2gggg[,$$$$

P.

GPU Nuclear Corporation is a subsidiary of General Public Utihties Corporation

NRC a

'a arr anact k rv.y r anna' re sneet 1.

Type of inspection audit or evaluation:

INPO EVALVATION 2.

Based on actual expertence over the past several years, about how often is this activity conducted?

EVERY 18 MONTHS 3.

Operations / Construction areas covered:

TYPICALLY CAN COVER ALL AREAS OF OPERATIONS 4

Extentoftheactivity(howeenypeople,forhowlong)

EACH EVALUATIOil 20 PEOPLE FOR TWO WEEKS (NOT CONTINUOU 5.

Approximate percentage of total time (on an annual basis) which the in response to the activity described in Itas fl.folleming annag a.

Plant Department Heads 120 HOURS (numberinvolved) 15 b.

Plant leonager 80 HOURS Corporate Department Heads 20 HOURS (number involved) c.

3 d.

Corporate Vice Presidents 20 HOURS (number involved) 5 e.

Chief Bluelear Officer 10 HOURS f.

Site Management 80 HOURS g.

Staff 1000 HOURS I

_ _ _ _. _. _ _ - -.. _ - _. _.. _.... _ _ _ _ _ _. ~. _. _..

IWtc "---la ary Emmact Survey MMM i

1.

Type of inspection, audit or evaluation IN%tiprRK - ANI AND NML i

2.

Based on actual er.perience over the past several years, about how o fs thts actfv1ty conducted?

i 4 PER YEAR i

3.

Operatfons/ Construction areas covered:

[

LIABILITY AND PROPERTY 4

Extent of the activity (how many people, for how long)

AVERAGE 2 INSPECTORS 3 DAYS l

5.

Approximate percentage of total time (on an annual basis) which the i

in response to the activity described in Item fl.following a i

Plant Department Heads M URS (numberinvolved) 4.

t 4

b.

Plant Manager 3 RS c.

Corporate Department Needs 0

i (numberinvolved) d.

Corporate Vice Presidents 0

(numberinvolved) e.

Chief Nuclear Officer n

f.

Site Management 16 HOURS l.

g.

Staff 680 HOURS i

i

-,.,-._r.-..

4 lWtc h la'arv

mmaet Surver 1

MMM 1.

Type of inspection. audit or evaluation:

EPA 2.

Based on actual experience over the past several years, about how often is this activity conducted?

LITTLE TO NO ACTIVITY IN THIS AREA 3.

Operations / Construction areas coveesd:

4.

Extent of the activity (how many people, for how long) 5.

Approximate percentage of total time (on an annual basis) which the in response to the activity described in Itas fl.following annag a.

Plant Department Heads (numberinvolved) b.

Plant Manager c.

Corporate Department Heads (numberinvolved) d.

Corporate Vice Presidents (neberinvolved) e.

Chief Nuclear Officer l'

alRC h latory.:maact Surver atea U enna'm 1.

Type of inspection, audit or evaluation:

nwA 2.

Based on actual experience over the past several years, about how often is this activity conducted?

2 TIMES A YEAR 3.

Operations / Construction amas covered:

INDUSTRIAL HYG1ENE AND SAFETY 4

Extent of the activity (how many people, for how long)

? INRprrTIONE FAPH VISIT EACH VISIT IS ABOUT 1/2 DAY 5.

Approximate percentage of total time (on an annual basis) which the in response to the activity described in Item fl.following mana a.

Plant Department Heads 20 HOURS (numberinvolved)

I b.

Plant Manager 4 HOURS c.

Corporate Department Heads 0

(numberinvolved) 0 d.

Corporate Vice Presidents 2 HOURS (numberinvolved)

I e.

Chief Nuclear Officer o

f.

Site Management 2 HOURS g.

Staff Time =40 HOURS / YEAR

_ _ _ _ _.. _ _ _ _.. _ __ _ _ ___ ____.__ _ _~__ _ _.____.__. _ _

NRC Resula"mry :: enact Survey m:t' onna < re sneet 1.

Type of inspection, audit or evaluation:

Nor TrtJi INSPECTIONS 2

Based on actual expertence over the past several years, about how often is this actfv1ty conducted?

2 INSPECTIONS PER YEAR 3.

Operations / Construction areas covered:

AREAS THAT HAVE BEEN COVERED IN THE LAST FEW YEARS ARE MAINTENANCE, MOVs EQ. B&W SPIP PROGRAM. E'iERGENCY OPERATING PROCEDURES. AND O RE-EXAMINATION PROGRAM 1

4 Extent of the activity (how many people, for how long)

THIS VARIES BUT AS AN AVERAGE FOR A TEAM INSPECTION IS 5 INSPECTORS FOR 2 WEEKS 5.

Approxinste percentage of total time (on an annual basis) which thn following managers must spend in direct involvement before, during, and in response to the activity described in Item fl.

a.

Plant Department Heads 30 HOURS (numberinvolved) 3 i.

b.

Plant Manager W RS l

l c.

Corporate Department Heads 0

(numberinvolved) d.

Corporate Vice Presidents 2 HOURS (numberinvolved) e.

Chief Nuclear Officer 0

f.

Site Management

_30 HOURS I

g.

Staff 500 HOURS THE ABOVE HOURS ARE REPRESENTATIVE OF THE MAINTENANCE INSPECTION.

TOTAL INVOLVEMENT WILL VARY DEPENDING ON THE SCOPE AND IMPORTANCE OF THE INSPECTION.

AS AN EXAMPLE THE 1986 PAT I INSPECTION WAS ESTIMATED AT 1600 HOURS FOR GPUN.

9 MRC Raoula'ary Janact i

aey M

.9BE.CL.HS$1 1.

Type of inspection, audit or evaluation:

NRc prC10NAL AND HEA000ARTERS 2.

Based on actual experience over the past several years. about is this activity conducted?

30 INSPECTIONS PER YEAR 3.

Operations / Construction areas covered:

ROUTINE MONTHLY. EMERGENCY PREPAREDNESS. SECURITY TRAINING. SATETY i

i 4

Extent of the activity (how many people, for how long)

PER INSPECTION:

ROUTINE MONTHLY - USUALLY 2 RESIDENTS PERIODIC TH OTHERS AVERAGE 2-3 FOR 1 WEEK IN LENGTH

(

i-i

(

5.

- Approximate percentage of total time (on an annual basis) which the in response to the activity described in Itas #1.followin Plant Department Needs 60 HOURS (number involved) 3 a.

b.

Plant Manager g,q,,,H,,0,VRS Corporate Department Heads 100 HOURS (number involved) c.

5 d.

Corporate Vice Presidents 80 HOURS (number involved) 5 e.

Chief Nuclear Officer 0

f.

Site Management 80 HOURS 1

l l

g.

Staff 1200 HOURS l

1 l.--____.____________._.____.,,,__m

________m.,_.,,___._m,

,_.,,,,_,,o,,-*,,,-,i,,,g..-

w,,---

g,,9

=

NRC "- ~1a wry maact Survey BRAL.tEL.!S JMil 1.

Type of inspection, audit or evaluation:

B&T 2.

l Based on actual experience over the past several years, about Is this activ1ty conducted?

BI-ANNUAL i

3.

Operations / Construction areas covered:

TRANSPORTATION L

I 4.

Extent of the activity (how many people, for how long) 36 EFFECTIVE ON SITE NRC HOURS l

l~

i 5.

Approximate percentage of total time (on an annual basis) which the in response to the activity described in Itas fl.following L

a.

Plant Department Heads 50 HOURS (number involved) 5 b.

Plant Manager 4 HOURS Corporate Department Heads 0

c.

(number involved) _ 0

(

d.

Corporate Vice Presidents 0

(numberinvolved) 0 F

e.

Chief fluclear Officer 0

f.

Site Management 8 HOURS V

I g

g.

Staff 60 HOURS l-l l

i

i Imc "-la arv manet Survar M A L.tB E.M R M il 1.

Type of inspection audit or evaluation hlRC OA Rr00 FRED AUDITS

  • i 2.

Based on actual experience over the past several years, about h is this activity conducted?

i 18-24 MONTH CYCLE 3.

Operations /Censtruction areas covered:

srcuntiv. EnrRctNcy PREPARE 0 NESS. TRANSPORTATION, SPECIAL NUCLEAR MATERIAL, i

MEDICAL i

4.

Extent of the activity (how many people, for how long)

IN-HOUSE ONLY l

5.

Approximate percentage of total time (en an annual basis) which the in response to the activity described in Item fl.followingj j

a.

Plant Department Heads 50 HOURS (numberinvolved) 6 b.

Plant Manager 8 HOURS Corporate Department Heads c.

(numberinvolved) 1 n

d.

Corporate Vice Presidents (numberinvolved) 1 4

s e.

Chief Nuclear Officer 4

)

f.

Site Management 8 HOURS g.

Staff 1800 HOURS

  • THESE AUDITS ARE THOSE REQUIRED BY THE CODE OF FEDERAL REGULATIONS,

(, *.

m e - ~1a<ary

enact k n ey 3REH..tDBLZLintti 1.

Type of inspection. audit or evaluation:

PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL RESOURCES 2.

Based on actual experience over the past several years, about how this activfty conducted?

3.

Operations / Construction areas covered:

ENVIRONMENTAL -

WATER QUALITY, AIR QUALITY, SOLID WASTE, ETC.

I l

4 Extentoftheactivity(howsahypeople,forhowlong) 6 INSPECTIONS, 1-3 INSPECTORS, 1 DAY IN LENGTH I

l 5.

Approximate percentage of total time (en an annual basis) which the l

in response to the activity described in item #1.followin Plant Departsment Heads gL,[ LOURS (numberinvolved) 3 a.

l-b.

Plant Manager g,,jgRS c.

Corporate Department Heads 0

(numberinvolved) d.

Corporate Vice Presidents 5 HOURS (numberinvolved) 1 e.

Chief Nuclear Officer 0

f.

Site Management 6 HOURS l

g.

Staff 400 HOURS I

l e,,--,

4

  1. C hla'ary Lamaet Surver evest' onna' re sneet 1.

Type of inspection, audit er evaluation:

PENNSYLVANIA DEPARTMENT OF INVIRote4 ENTAL RESOURCES - BUREAU OF RADIATION PROTECTION 2.

Based on actual experience over the past several years, about how often is this activity conducted?

ON-SITE PRESENCE - NO FORMAL INSPECTIONS 3.

Operations / Construction areas covered:

4.

Extentoftheactivity(howasnypeople,forhowlong) 5.

Approximate percentage of total time (on an annual basis) which the following managers must spend in direct involvement before, during, and in response to the activity described in Item #1.

a.

Plant Department Needs 30 HOURS (numberinvolved) 5 b.

Plant Manager 30 HOURS c.

Corporate Department Heads 0

(numberinvolved) d.

Corporate Vice Presidents afggS (numberinvolved) 1 e.

Chief lluelear Officer 4 HOURS f.

Site Management 12 HOURS g.

Staff Hours 100 HOURS t

/