ML20059C879

From kanterella
Jump to navigation Jump to search
Forwards TMI-1 Semiannual Effluent & Release Rept for Jan - June 1990, Including Executive Summary of Effluent Release Rept,Disposal & Effluent Release Data & Assessment of Radiation Doses.No Changes to ODCM for Reporting Period
ML20059C879
Person / Time
Site: Crane 
Issue date: 08/29/1990
From: Hukill H
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20059C883 List:
References
C311-90-2115, NUDOCS 9009050400
Download: ML20059C879 (2)


Text

_

]

j r

GPU Nuclear Corpotetton

)

f Post Office Box 480

)

Route 441 South Middletown, Pennsylvania 170$7 0191 717 944 7621 I

TELEX 84 2386 i

Writer's Direct Dial Number:

l August 29, 1990 i

C311-90-2115 US Nuclear Regulatory Comission Attn: Document Control Desk Washington, DC 20555

Dear Sir:

Three Mlle Island Nuclear Station, Unit 1 (TMI-1)

Operating License No. DPR-50 Docket No. 50-289 First' Half - 1990 Semiannual Effluent and Release Report Enclosed is the.TMI-1 Semiannual Effluent and Release Report for-the period January 1, 1990 through June 30, 1990. This report includes an Executive t

Sumary of the Effluent Release Report, the Disposal and Effluent Release Data, and an assessment 09 the radiation doses due to liquid and gaseous effluents released from the unit during the reporting pe.:od.

i.

i TMI-1 Technical Specification Sections 6.9.4.2.1 and 6.9.4.2.2 require

' reporting of effluent and solid waste shipment data in accordance with Reg.

Guide 1.21 for the semiannual report period. The attached tables include sumaries of solid waste shipments and liquid and gaseous effluents for the i

reporting period.

TMI-1 Technical Specification Section 6.9.4.2.3 requires a sumary of unplanned releases from the site to unrestricted areas. During this report period there were no unplanned releases.

'TMI-1 Technical Specification Section 6.9.4.2.4 requir e that changes to the Process Control Program (PCP) and Offsite Dose Calculatior, Manual (ODCM) be reported. There were no changes to the ODCM or the PCP during this report period.

Section 6.9.4.2.4 also requires "a listing of new locations for dose calculations and/or monitoring identified by the land use census pursuant to Specification 3.23.2." There were no new locations identified during this semiannual period.

^

900905040o'900829

{DR ADOCK 05000289 PDC r&42 GPU Nuclear Corporation is a subsidiary of General Puohe Utihties Corporation

1

\\

6311-90-2115 August 29. 1990 j

[

j i

TMI-1 Technical Specification Section 6.9.4.2.5 requires reporting of instrumentation not returned to GPEiiABLE status within 30 days per Section 3.21.1.b and 3.21.2.b.

l.11 such instrumentation was returned to OPERABLE J

service within 30 days.

i l

1

?

Sincerely, bb f

H. D. ' H ill' Vice President & Director, TMI-1 HDH/DVH/spb

- cc:

T. Martin R. Hernan i

J. Stolz F. Young Enclosures t

I' L

i

-