ML20043F992
| ML20043F992 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 06/11/1990 |
| From: | Hukill H GENERAL PUBLIC UTILITIES CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| C311-90-2087, NUDOCS 9006180396 | |
| Download: ML20043F992 (2) | |
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _
l.
3 J. 1 L' gf Post Office Box 480 GPU Nuclear Corporstlon Route 441 South Middletown, Pennsylvania 17057 0191 717 944 7621 TELEX 84 2386 Writer's Direct Dial Number:
June 11, 1990 C311-90-20B7 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C.
20555 Gentlemen:
Three Mile Island Nuclear Station, Unit 1 (TMI-1)
Operating License No. DPR-50 Docket No. 50-289 Reactor Operator and Senior Reactor Operator Licensing Examinatioit Reference Material is a listing of Exam Reference Material that was sent to Barry Norris, NRC Region 1.
This material was sent June 1,1990 in response to a NRC letter dated May 5, 1990.
Sincerely,
(
')
. D.
uk 11 Vice President & Director, TMI-1 HDH/DVH/spb:2087 Attachment 9006180396 90061.1 PDn ADOCK 0S0002q9 E
PDb GPU Nuclear Corporation is a subsidiay of General Pubhc Utihbes Corporation
l ATTAC] MENT 1 C311 90-2087 EXAM REFERENCE MATERIAL RE-EXAM FOR SRO GROUP #14 (D.MAY)
RE-EXAM FOR LICENSED OPERATOR REQUAL (D.ATHERHOLT)
BOOK BOX NO.
DESCRIPTION NO.
1 PROCEDURE INDEX 1
2 EMERGENCY PROCEDURES - 1202-2 THRU 1202-42 1
3 ABNORMAL PROCEDURES - 1203-1 THRU 1203-45 1
ABNORMAL TRANSIENT PROCEDURES 1210-1 THRU 1210-10 4
STANDING ORDERS (OPS MEMOS) 1 5
ANNUNCIATOR / ALARM RESPONSE PROCEDURES 1
AH-CP-1A PANEL ANNUNCIATOR (AH-CP-1A)
THRU LIQUID WASTE DISPOSAL SYSTEM ANNUNCIATOR PANEL (LWDS) 6 ANNUNCIATOR / ALARM RESPONSE PROCEDURES 1
MAIN ANNUNCIATOR PANEL "A" (MAP A)
THRU MAIN ANNUNCIATOR PANEL "K" (MAP K) 7 ANNUNCIATOR / ALARM RESPONSE PROCEDURES 1
MAIN ANNUNCIATOR PANEL "L" (MAP L)
THRU PANEL LEFT ANNUNCIATOR "A"
(PLA) 8 ANNUNCIATOR / ALARM RESPONSE PROCEDURES 1
PANEL LEFT ANNUNCIATOR "B" (PLB)
THRU UPS DIESEL GENERATOR (UPS) 9 EMERGENCY PLAN IMPLEMENTING PROCEDURE (INDEX IN 2
THE FRONT OF THE BOOK) 10 TECHNICAL SPECIFICATIONS 2
11 SRO SIMULATOR EXERCISE GUIDES (INDEX IN THE FRONT 2
OF THE BOOK) 12 SRO SIMULATOR UNANNOUNCED SCENARIOS 2
13 SRO SIMULATOR EXAM SCENARIOS (LOR) 2 14 SIMULATOR: REMOTE FUNCTIONS; INITIAL CONDITIONS; 2
SPECS & INSTRUCTOR STATION FEATURES; OPERATIONAL LIMITS 15 SIMULATOR: CAUSE AND EFFECTS 2
16 SIMULATOR: DR REPORT 2
- -