ML19322A153

From kanterella
Jump to navigation Jump to search
Forwards Final Rept of Significant Constr Deficiency No 8 Re Containment Electric Penetration Bolting Failure
ML19322A153
Person / Time
Site: Waterford Entergy icon.png
Issue date: 12/29/1978
From: Aswell D
LOUISIANA POWER & LIGHT CO.
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19322A154 List:
References
LPL-10342, NUDOCS 7901030060
Download: ML19322A153 (1)


Text

o N=9

~

_ lot.IISIANA POWER & LIGH T

,4a ctt AnoNoc sintor P O E30X fs00t)

  • NEW OnLEANS. LOUIS!ANA 70174 * (504) 3GG 2345

$fuYUsOr$NI)

D t. ASWELL va P*the watea December 29, 1978 p.

LPL 10342 Q-3-A35.07.08 3-A1.01.04 Mr. K.V. Seyfrit, Director, Region IV U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012

SUBJECT:

Waterford SES Unit 3 Docket No. 50-382 Final Report of Significant Construction Deficiency No. 8

" Containment Electrical Penetration Bolting Failure"

Dear Mr. Seyfrit:

In accordance with the requirements of 10CFR50.55(e), we are submitting two copies of the final report for the subject Significant Construction Deficiency.

Yours very truly, D.L. Aswell DLA/TFG/ys Enclosure cc: 1) Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 (with 15 copies of report)

2) Director Office of Management Information and Program Control U.S. Nuclear Regulatory Commission 790103Cao Washington, D.C. 20555 (with one copy of report)

.