ML19322A157
ML19322A157 | |
Person / Time | |
---|---|
Site: | Waterford |
Issue date: | 12/27/1978 |
From: | ARKANSAS POWER & LIGHT CO. |
To: | |
Shared Package | |
ML19322A154 | List: |
References | |
NUDOCS 7901030065 | |
Download: ML19322A157 (1) | |
Similar Documents at Waterford | |
---|---|
Category:DEFICIENCY REPORTS (PER 10CFR50.55E & PART 21)
MONTHYEARML20207M9231999-03-12012 March 1999
[Table view]Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results ML18066A2771998-08-13013 August 1998 Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency ML18065B1351998-01-0606 January 1998 Part 21 Rept Re Use of Deltstrat Code for RCS Flow Rate Determination.Code Corrects for Temps to Determine Hot Leg Bulk Coolant Temp ML20203J2521997-12-0101 December 1997 Deficiency Rept Re Failed Mdr Relays at Entergy Operations Inc,Waterford 3 Nuclear Generation Station.Caused by Contaminated Grease.Housekeeping Procedures Formalized & Added Enclosed Booth Isolating Mdr Final Assembly LD-97-033, Part 21 Rept Re Defect in Potter & Brumfield Mdr Relays, Models 170-1 & 7032.Extended Problem to Include All Mdr Relay Models W/Date Codes 93XX-95XX.Root Cause Analysis, Written Rept & Recommended Corrective Actions Due by 9712011997-11-20020 November 1997 Part 21 Rept Re Defect in Potter & Brumfield Mdr Relays, Models 170-1 & 7032.Extended Problem to Include All Mdr Relay Models W/Date Codes 93XX-95XX.Root Cause Analysis, Written Rept & Recommended Corrective Actions Due by 971201 LD-97-028, Part 21 Rept Re Contamination of Lubricant Which Has Led to Hardening of Lubricant in Certain Potter & Brumfield Mdr Relay Models 170-1 & 7032.Will Distribute Copy of Rept to Utils Having ABB-CE Designed Nuclear Steam Supply Sys1997-10-13013 October 1997 Part 21 Rept Re Contamination of Lubricant Which Has Led to Hardening of Lubricant in Certain Potter & Brumfield Mdr Relay Models 170-1 & 7032.Will Distribute Copy of Rept to Utils Having ABB-CE Designed Nuclear Steam Supply Sys LD-97-024, Part 21 Rept Re Error in Energy Redistribution Factor Used in LOCA Analysis for Listed Plants for Which ABB-CE Performed Analysis.Issued Recommendations Info Bulletin 97-0041997-08-14014 August 1997 Part 21 Rept Re Error in Energy Redistribution Factor Used in LOCA Analysis for Listed Plants for Which ABB-CE Performed Analysis.Issued Recommendations Info Bulletin 97-004 ML20140A9661997-05-29029 May 1997 Part 21 Rept Re Ksv Emergency Diesel Generator Power Piston Failure.Caused by Jacket Water in Combustion Chamber. Recommends That Users Verify That Crown Thickness at Valve Cutout Be 100 Minimum ML18065B0111996-10-18018 October 1996 Part 21 Rept Re Application of Certain Aspects of ABB-CE Safety Analysis Methodology ML20117K9731996-09-10010 September 1996 Follow-up Part 21 Rept of Re Failures of Waterford 3 Dedication Testing Process of Seven Commercial Grade Barksdale Pressure Switches ML20116C7031996-07-29029 July 1996 Part 21 Rept Re Failures Identified by Waterford 3 Dedication Testing Process of 7 Commercial Grade Barksdale Pressure Switches ML20117G4641996-05-14014 May 1996 Part 21 Rept Re Cooper Bessemer Reciprocating Products,Div of Cooper Cameron Corp,Issued Ltr to Define Utils/Plants Containing Similar Equipment as Supplied on Cooper Bessemer Ksv & Enterprise Dsr EDGs LD-96-009, Part 21 Rept Re Potential Instrumentation Decalibr at Low Power.Affected Utils Should Ensure That Log Power Channels Properly Calibr & cross-correlated to Linear Power Channels at 100% Reactor Power1996-04-15015 April 1996 Part 21 Rept Re Potential Instrumentation Decalibr at Low Power.Affected Utils Should Ensure That Log Power Channels Properly Calibr & cross-correlated to Linear Power Channels at 100% Reactor Power ML20077D3431994-11-29029 November 1994 Part 21 Rept Re Suspect Master Connecting Rods & Contains Info Location in Engine for Rods ML20078G3051994-11-0909 November 1994 Rev to Part 21 Rept Re Potential Problem W/Master Power Connecting Rods.Vendor Recommends Listed Utils Perform Visual Insp of Master Rods to Determine Applicability of Rept LD-94-019, Suppl Part 21 Rept Re Notification of Potential Defect in motor-driven Relays Supplied by ABB-CE to Waterford Steam Electric Station Unit 3.Entergy Oparations Aware of Info1994-03-16016 March 1994 Suppl Part 21 Rept Re Notification of Potential Defect in motor-driven Relays Supplied by ABB-CE to Waterford Steam Electric Station Unit 3.Entergy Oparations Aware of Info LD-93-177, Part 21 Rept Re Potter & Brumfield motor-driven Relays Models 7032,7033 & 7034 Supplied by ABB/C-E to Entergy Operations Waterford Steam Electric Station,Unit 3.Eighty- Two Percent of Affected Relays Tested1993-12-23023 December 1993 Part 21 Rept Re Potter & Brumfield motor-driven Relays Models 7032,7033 & 7034 Supplied by ABB/C-E to Entergy Operations Waterford Steam Electric Station,Unit 3.Eighty- Two Percent of Affected Relays Tested LD-93-003, Part 21 Rept Re Defect in Potter & Brumfield Model 170-1 Relay.One of Two Rotor Return Springs Broke & Portion of Spring Lodged Between Rotor & Stator.Rotor Springs Supplied by Lewis Spring Co.Info Bulletin Being Prepared1993-01-13013 January 1993 Part 21 Rept Re Defect in Potter & Brumfield Model 170-1 Relay.One of Two Rotor Return Springs Broke & Portion of Spring Lodged Between Rotor & Stator.Rotor Springs Supplied by Lewis Spring Co.Info Bulletin Being Prepared ML20126J5961992-12-31031 December 1992 Part 21 Rept Re Potential Loss of RHR Cooling During Nozzle Dam Removal.Nozzle Dams May Create Trapped Air Column Behind Cold Leg Nozzle Dam.Mod to Nozzle Dams Currently Underway. Ltrs to Affected Utils Encl ML20125C7161992-12-0707 December 1992 Part 21 Rept Re Possibility for Malfunction of Declutching Mechanisms in SMB/SB-000 & SMB/SB/SBD-00 Actuators. Malfunction Only Occurs During Seismic Event.Balanced Levers May Be Purchased from Vendor.List of Affected Utils Encl ML20127M5201992-11-24024 November 1992 Final Part 21 Rept Re Reject Lot Serial Numbers of Defective Fuel Nozzle Tips,Consisting of Corrected Page 6 of 921102 Rept Re Reject Lots for Fuel Injector Assembly ML20127P5861992-11-23023 November 1992 Followup to 921005 Part 21 Rept Re Potential Defect in SB/SBD-1 Housing Cover Screws.Procedure Re Replacement of SBD-1 Spring Cover Bolts Encl.All Fasteners Should Be Loosened & Removed.List of Affected Utils Encl ML20115D6331992-10-15015 October 1992 Part 21 Rept Re Nuclear Logistics Inc 10CFR21 Notification for Gnb Industrial Battery Co Batteries.Util Will Obtain Replacement Batteries from C&D Power Sys,Inc & Alarm Features to Be Tested by End of Refuel 5 ML20118B4391992-09-11011 September 1992 Part 21 Rept Re Degradation in Abb Type 27N Undervoltage Relays Used in Electrical Switchgear.Recommends That Users Review Applications Requiring Exposures Greater than 1E03 Rads TID W/Time Delay Function Option ML20101Q9311992-07-0808 July 1992 Part 21 Rept Re Failure to Comply w/1 Minute Rating of NCX-17 Cells Mfg by Gnb Battery Co (Formally Gould).Addl Testing of Cell Sizes & End Voltages Scheduled to Begin on 920713 & Be Completed on 920815 L-91-002, Supplemental Part 21 Rept Re GE Reactor Trip Breakers Used in safety-grade Equipment.Initially Reported on 901228.List of Plants Supplied w/C-E Breakers Encl1991-01-0404 January 1991 Supplemental Part 21 Rept Re GE Reactor Trip Breakers Used in safety-grade Equipment.Initially Reported on 901228.List of Plants Supplied w/C-E Breakers Encl ML17223A7451990-01-26026 January 1990 Part 21 Rept Re Backup Rings Furnished in Spare Parts Seal Kits & in 25 Gpm 4 Way Valves as Part of Actuators Made of Incorrect Matl.Rings Should Be Viton & Have Been Identified as Buna N ML20246P7111989-07-17017 July 1989 Part 21 Rept Re Quench Cracks in Bar of A-SA-193 Grade B7 Component.Quench Cracks Found in One Bar of Matl.Listed Purchasers Informed of Potential Defect.Next Rept Will Be Submitted When Addl Info Becomes Available ML20247P7991989-04-0404 April 1989 Part 21 Rept Re Atmospheric Dump Valves.Cause of Failure Speculative But Result of Piston Ring That Failed to Seal. Resolution to Problem Requires Increasing Pilot Valve Capacity & Reworking of Plug to Enlarge Pilot Flow Area ML20234C7351987-06-23023 June 1987 Supplemental Part 21 Rept Re Silicone Foam Seal Anomolies at Wolf Creek Generating Station ML20211P7211987-02-23023 February 1987 Part 21 Rept Re Rockbestos Coaxial Cable Used in Sorrento Electronics Digital & Analog high-range Radiation Monitor. Insulation Resistance at High Temp Not High Enough for Ion Chamber & Associated Electronics to Operate Properly ML20215G6801986-10-10010 October 1986 Part 21 Rept Re Vendor Tests of air-operated Diaphragm Valves Revealing Natural Frequencies Less than Required Values of 33 Hz.Initially Reported on 841227.No Adverse Effects Noted During Testing ML20215G5351986-10-10010 October 1986 Part 21 Rept Re Vendor Tests of air-operated Diaphragm Valves Revealing Natural Frequencies Less than Required Values of 33 Hz.Initially Reported on 841227.No Adverse Effects Noted During Testing ML20153D8861986-02-17017 February 1986 Part 21 Rept Re Failure of Penetration & Conduit Seal Configurations During Fire Tests.Initially Reported on 860214.Evaluation of Number & Location of Defective Seals in Progress.Nrc Assistance Requested ML20140A5281985-12-19019 December 1985 Part 21 Rept Forwarding Ltr Sent to Customers Re Check Valves Missing Lock Welds on Hinge Supports or Hinge Support Capscrews,Per 851121 Request.List of Customers Receiving Ltr Also Encl ML20135E1161985-09-0505 September 1985 Part 21 Rept Re Use of Connectron non-IEEE Qualified Matl in Spare Part Terminal Blocks Supplied to Facilities. Appropriate Customers Notified.Terminal Blocks Should Be Reviewed to Identify Defective Matl W3P85-1442, Final Potentially Reportable Deficiency Rept 180 Re Failure to Maintain Adequate Control of Vendor Manuals.Initially Reported on 840918.Preventive Maint Program Implemented.Item Not Reportable Per 10CFR50.55(e)1985-08-0101 August 1985 Final Potentially Reportable Deficiency Rept 180 Re Failure to Maintain Adequate Control of Vendor Manuals.Initially Reported on 840918.Preventive Maint Program Implemented.Item Not Reportable Per 10CFR50.55(e) ML20133G9741985-07-31031 July 1985 Part 21 Rept Re Anchor/Darling Valve Co Swing Check Valves W/Loose Set Screws &/Or Missing Lock Welds,Reported by Palo Verde Nuclear Generating Station.All Customers W/Similar Valves Notified.Ltr Re Waterford 3 Valves Encl W3P85-1420, Potentially Reportable Deficiency Rept PRD-180 Re Failure to Maintain Adequate Document Control of Vendor Manuals. Initially Reported on 840918.Submittal of Written Rept on Deficiency Rescheduled for 8508011985-06-27027 June 1985 Potentially Reportable Deficiency Rept PRD-180 Re Failure to Maintain Adequate Document Control of Vendor Manuals. Initially Reported on 840918.Submittal of Written Rept on Deficiency Rescheduled for 850801 W3P85-1400, Potentially Reportable Deficiency 180 Re Failure to Maintain Adequate Document Control of Vendor Manuals.Initially Reported on 840918.Addl Time Needed to Evaluate Deficiency. Next Rept Will Be Submitted by 8507011985-05-29029 May 1985 Potentially Reportable Deficiency 180 Re Failure to Maintain Adequate Document Control of Vendor Manuals.Initially Reported on 840918.Addl Time Needed to Evaluate Deficiency. Next Rept Will Be Submitted by 850701 ML20128G5101985-05-24024 May 1985 Part 21 Rept Re Heat Numbers to Be Added & Deleted from Sublist Sheet A,Based on Review of NRC W3P85-1240, Potentially Reportable Deficiency Rept PRD-180 Re Failure to Maintain Adequate Document Control of Vendor Manuals. Initially Reported on 840918.Written Rept Submittal Date Extended Until 8505311985-04-29029 April 1985 Potentially Reportable Deficiency Rept PRD-180 Re Failure to Maintain Adequate Document Control of Vendor Manuals. Initially Reported on 840918.Written Rept Submittal Date Extended Until 850531 W3P85-0785, Interim Deficiency Rept 180 Re Failure to Maintain Adequate Document Control of Vendor Manuals.Initially Reported on 840918.Addl Time to Evaluate Safety Significance Required. Submittal of Written Rept Rescheduled for 8504301985-03-25025 March 1985 Interim Deficiency Rept 180 Re Failure to Maintain Adequate Document Control of Vendor Manuals.Initially Reported on 840918.Addl Time to Evaluate Safety Significance Required. Submittal of Written Rept Rescheduled for 850430 W3P85-0551, Significant Const Deficiency Rept 93 Re Charging & Letdown Containment Isolation Valve.Potential Exists for Valve to Stick Open Due to Thermal Contraction.Testing Under Temp Conditions Being Performed1985-03-0606 March 1985 Significant Const Deficiency Rept 93 Re Charging & Letdown Containment Isolation Valve.Potential Exists for Valve to Stick Open Due to Thermal Contraction.Testing Under Temp Conditions Being Performed W3P85-0544, Supplemental Final Significant Const Deficiency 93 Re Failure of Containment Isolation Valve CVC-103 to Close After Plant Cooldown.Details Will Be Provided on Valve Failure When Info Obtained1985-02-27027 February 1985 Supplemental Final Significant Const Deficiency 93 Re Failure of Containment Isolation Valve CVC-103 to Close After Plant Cooldown.Details Will Be Provided on Valve Failure When Info Obtained W3P85-0509, Interim Rept of Potentially Reportable Deficiency 180 Re Failure to Maintain Adequate Document Control of Vendor Manuals.Initially Reported on 840918.Addl Time to Evaluate Safety Significance Needed.Next Rept Delayed Until 8503291985-02-26026 February 1985 Interim Rept of Potentially Reportable Deficiency 180 Re Failure to Maintain Adequate Document Control of Vendor Manuals.Initially Reported on 840918.Addl Time to Evaluate Safety Significance Needed.Next Rept Delayed Until 850329 W3P85-0337, Final Significant Const Deficiency Rept SCD-80 Re Unsatisfactory Stroking of Emergency Feedwater Pump Turbine Steam Supply shut-off Valves.Pneumatic Operators for Valves 2MS-V611A & V612 Replaced w/D-C Motors1985-02-22022 February 1985 Final Significant Const Deficiency Rept SCD-80 Re Unsatisfactory Stroking of Emergency Feedwater Pump Turbine Steam Supply shut-off Valves.Pneumatic Operators for Valves 2MS-V611A & V612 Replaced w/D-C Motors W3P85-0339, Final Significant Const Deficiency Rept SCD-93 Re Charging & Letdown Containment Isolation Valve Deficiency.Vendor Repaired Valve W/New Seats Sized for Max Interference Fit1985-02-21021 February 1985 Final Significant Const Deficiency Rept SCD-93 Re Charging & Letdown Containment Isolation Valve Deficiency.Vendor Repaired Valve W/New Seats Sized for Max Interference Fit W3P85-0338, Final Part 21 & Const Deficiency Rept SCD-37 Re Unreliable Temp Signals from Resistance Temp Detectors (Rtd).Initially Reported on 810710.Safety-related RTDs Replaced or Environmentally Sealed.Design Change Notice Issued1985-02-21021 February 1985 Final Part 21 & Const Deficiency Rept SCD-37 Re Unreliable Temp Signals from Resistance Temp Detectors (Rtd).Initially Reported on 810710.Safety-related RTDs Replaced or Environmentally Sealed.Design Change Notice Issued W3P85-0083, Deficiency Rept PRD-180 Re Failure to Maintain Adequate Document Control of Vendor Manuals.Initially Reported on 840918.Safety-related & Environmentally Qualified Equipment Manuals to Be Reviewed.Next Rept Anticipated by 8502281985-01-14014 January 1985 Deficiency Rept PRD-180 Re Failure to Maintain Adequate Document Control of Vendor Manuals.Initially Reported on 840918.Safety-related & Environmentally Qualified Equipment Manuals to Be Reviewed.Next Rept Anticipated by 850228 1999-03-12 Category:TEXT-SAFETY REPORT MONTHYEARML20217F2891999-10-13013 October 1999
[Table view]Drill 99-08 Emergency Preparedness Exercise on 991013 05000382/LER-1999-014, :on 990910,reactor Shutdown Due to Loss of Controlled bleed-off Flow,Occurred.Caused by Rotating Baffle failure.Two-piece Rotating Baffle of Original Design Was Located & Installed,In Order to Repair RCP 2B1999-10-12012 October 1999
ML20199C9101998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Waterford 3.With ML20198F4691998-12-21021 December 1998 Safety Evaluation Supporting Amend 147 to License NPF-38 ML20196F4911998-12-0101 December 1998 SER Accepting Request for Relief ISI2-09 for Waterford Steam Electric Station,Unit 3 & Arkansas Nuclear One,Unit 2 ML20206N4131998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Waterford 3.With ML20195C4841998-11-0606 November 1998 SER Accepting QA Program Change to Consolidate Four Existing QA Programs for Arkansas Nuclear One,Grand Gulf Nuclear Station,River Bend Station & Waterford 3 Steam Electric Station Into Single QA Program 1999-09-30 |
Text
Y b
LOUISIANA POWER & LICliT COMPANY
' #' WATERFORD SES - UNIT NO 3 FINAL REPORT OF SIGNIFICANT CONSTRUCTION DEFICIENCY NO 8 CONTAlta!ENT ELECTRICAL PENETRATION BOLTING FAILURE l
DECE11BER 27,1978
(
l 7901030066
FINAL REPORT SIGNIFICANT DEFICIENCY NO 8 CONTAINMENT ELECTRICAL PENETRATION BOLTING FAILURE INTRODUCTION This report is submitted pursuant to 10CFR50.55(c)(3) . It describes deficiencies in gontainment electrical penetrations at Waterford Unit 3.
BACKCROUND A. Synopsis of Incident During the installation of Conax Corporation containment electri-cal penetrations, at the Waterford Unit 3 project, it was noted that the bolted connections that connect the horizontal channel sections of the termination subassembly to the header mounting brackets were loose or disengaged. Conax Corporation has confirmed that this method of attachment was employed in 32 low voltage control and in-strumentation penetrations.
B. Resolution Conax Corporation has modified their design for Waterford 3 such that the pemnuts are welded in place, in IIeu of the pressed connections in question.
DISCUSSION The "pemnuts" were installed by Conax Corporation (manuf acturers drawings 7320-10001, Ebasco No 1564-2332 R3). The problem identified at Waterford 3 cast doubt on the scismic capabilitics of the "pemnuts" although further investigations would be necessary to make a conclusive statement. A management decision was made to modify the design rather than undertake an extensive evaluation program to justif y the acceptability of the design.
We have been informed by Conax Corporation that. the " press fit" pemnut de-sign has been utilized in electrical penetration terminal block mounting brackets delivered to Millstone Nuclear Power Station Unit 3, North Anna Units 3 and 4, St Lucie Plant Unit 2 and LaSalle County Station Unit 1.
CORRECTIVE ACTION The termination sub-assembly connections have been redesigned to utilize ,
welded pemnuts. The modified connections have now been received at the Waterford 3 project and the modification procedure has been approved.
Work to change out the connections will be accomplished to support the construction plan.