Responds to NRC 791211 Ltr Re Violation Noted in IE Insp Repts 50-424/79-17 & 50-425/79-17.Corrective Actions: Increased Emphasis of Written & Oral Communication Re Backfill Given to All Appropriate Personnel
ML19305C526
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 12/27/1979
From: Dutton D
GEORGIA POWER CO.
To: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19305C523 List:
References
NUDOCS 8003310018
Download: ML19305C526 (2)


Text

- + ._ __ . .

6,

, -:R C P E~"C ~

. f ;T.t Georgia Power Company Post Offce Box 4545 Atlanta, Georgia 30302

- ] { , p p' 7 pq.*

Vogtle Proj,ect Telephone 404 522-6060 Southem Company Services, Inc.

Post Once Box 2625 Birmingham, Alabama 35202 Telephone 205 870-6011 December 27, 1979 United States Nuclear Regulatory Commission

REFERENCE:

Office of Inspection and Enforcement RII: JRH Region II - Suite 3100 50-424/79-17 101 Marietta Street 50-425/79-17 Atlanta, GA 30303

- Attention: Mr. C. E. Murphy File: X7BC10 Log: GM-540 Gentlemen:

With reference to your December 11, 1979 transmittal of inspection .

report number 50-424/79-17 and 50-425/79-17 and per discussions in the Region II I6E offices this morning with Mr. Jack Bryant and others of your staff, we are submitting the following information.

1. With reference to *Se non-compliance discussed in item 5 of the inspection report and Appendix A of your transmittal, we note that prior to the present circumstances surrounding backfill at Plant Vogtle we had not considered this type occurrence as falling under the reporting requirements of 10CFR50.55(c) until our preliminary evaluations were availabic. However, since the exit interview at the Vogtle site where this non-compliance was first discussed we have taken corrective measures to assure that other occurrence of this nature will tut reported to the Region II I&E offices. These measures were implemented via increased emphasis from Georgia Power Company management to all appropriate personnel in the form of both written and oral communications. Full compliance with the referenced requirements is considered to be achieved.
2. With reference to the third paragraph of Appendix A it was agreed the word "possible" is to be inserted between the words "and undermining".

e g f l k ak h & B

O( -: o .

.I -

United States Nuclear Regulatory Commission Mr. C. E. Murphy Page two of letter December 27,'1979

3. With reference to item 6 of the inspection report it was agreed the information requested would be submitted to NRR as part of our FSAR effort per our present plans.

Neither the inspection report nor this reply contain any proprietary information and may be placed in the NRC's Public Document Rooms.

Very truly yours, i

% N Doug Dut on Proj ect General Manager DED:lb xc: M. D. Hunt - Region II

. J. H. Miller, Jr.

W. E. Ehrensperger .

F. G. Mitchell, Jr.

C. F. Whitmer R. J. Kelly R. E. Conway R. W. Staffa C. W. Hayes W. M. Johnston E. D. Groover C. R. Miles K. M. Gillespie D. L. McCrary R. A. Thomas J. A. Bailey J. L. Leamon J. L. Vota B. L. Lex l

l

, __ _