Security Baseline Inspection Report 05000456/2023401 and 05000457/2023401
ML23290A266
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 10/18/2023
From: Steven Orth
NRC/RGN-III/DRSS/SEPIR
To: Rhoades D
Constellation Energy Generation, Constellation Nuclear
References
IR 2023401
Download: ML23290A266 (1)


Text

SUBJECT:

BRAIDWOOD STATION - SECURITY BASELINE INSPECTION REPORT 05000456/2023401 AND 05000457/2023401

Dear David Rhoades:

On September 29, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Braidwood Station and discussed the results of this inspection with Christopher Abbott, Senior Manager, Site Security, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Steven K. Orth, Chief Security, Emergency Preparedness, and Incident Response Branch Division of Radiological Safety and Security Docket Nos. 05000456 and 05000457 License Nos. NPF-72 and NPF-77

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000456 and 05000457

License Numbers:

NPF-72 and NPF-77

Report Numbers:

05000456/2023401 and 05000457/2023401

Enterprise Identifier:

I-2023-401-0052

Licensee:

Constellation Energy Generation, LLC

Facility:

Braidwood Station

Location:

Braceville, IL

Inspection Dates:

January 23, 2023 to September 29, 2023

Inspectors:

A. Anderson, Physical Security Inspector

G. Bonano, Physical Security Inspector

J. Kutlesa, Emergency Preparedness Inspector

Approved By:

Steven K. Orth, Chief

Security, Emergency Preparedness, and Incident

Response Branch

Division of Radiological Safety and Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Braidwood Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

inspection elements: Access Control

(1)

  • Tier I: All Requirements
  • Tier II: 02.06 a - d; 02.07 a; 02.08 a, b, f, i
  • Tier III: 02.09

71130.05 - Protective Strategy Evaluation

The inspectors evaluated the licensee's protective strategy through completion of the following inspection elements:

Protective Strategy Evaluation (2 Samples)

(1)

  • Tier I: All Requirements
  • Tier II: 02.05 a; 02.06 a, d, g, i - n; 02.07 a - e
  • Tier III: 02.09 a, b; 02.10a; 02.11 a
(2) Evaluated the licensee annual FOF drill conducted on September 21, 2023

71130.08 - Fitness For Duty Program

The inspectors evaluated the fitness for duty program by completing the following inspection

elements: Fitness For Duty Program

(1)

  • Tier I: All Requirements
  • Tier II: 02.05 a - e, i - k; 02.06 a - g; 02.07 a - e; 02.08 a, b; 02.09 a - e
  • Tier III: 02.10; 02.11 a; 02.12 a; 02.13 a - c

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On September 29, 2023, the inspectors presented the security baseline inspection results to Christopher Abbott, Senior Manager, Site Security, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Access Control Device: Key/Core Inventories and Change

Outs

06/24/2022,

07/05/2022,

09/04/2022,

06/26/2023

Duress Checks

05/01/2022 -

2/22/2022;

07/27/2023 -

08/03/2023

Access Control Turnstile Testing Logs

07/30/2023

Uninterruptible Power Supply Operating Experience

Diagrams

04/04/2023

SY-AA-101-106

Control and Classification of Safeguards Information (SGI)

and Sensitive Unclassified Non-Safeguards Information

(SUNSI)

Miscellaneous

SY-AA-101-106-

F-01

Safeguards Information Control Data Sheet Logs

SY-AA-101-112

Exelon Security Search Processes

SY-AA-101-116

Conducting Patrols

SY-AA-101-124

Operation of the Security Control Centers

Procedures

SY-BR-101-112

Braidwood Search Operations

71130.02

Self-Assessments

PI-AA-126-1001-

F-01

Self-Assessment Plan: 04668449, Pre-NRC Inspection

71130.02

07/06/2023

Braidwood Station Security Plan, Training and Qualification

Plan, Safeguards Contingency Plan, and Independent Spent

Fuel Storage Installation Security Program

Large Vehicle Analysis

06/02/2016

Miscellaneous

SY-AA-150-102-

F-09

Exercise Operations Action Report

EC 630081

ENG-001, Design Change Package

SY-AA-101-103

Observation and Inspection of Security Barriers

71130.05

Procedures

SY-AA-101-132-

1003

Responding to an Unmanned Aerial System (UAS)

Unmanned Aerial Vehicle (UAV) - SUNSI

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

SY-AA-101-133

Integrated Response Plan with Off-Site Response Agencies

SY-AA-101-133-

F-01

LLEA Response Capability

2/15/2023

SY-AA-105-102

Security Drills and Exercises

SY-AA-150-1006

Timelines (SUNSI)

SY-AA-150-102

Primary and Alternate Adversary Pathways: Security Drills

and Exercises

71130.05

Procedures

SY-BY-101-116

Braidwood Security Vehicle and Foot Patrols

Miscellaneous

Initial and Refresher FFD Training Records Samples

07/31/2023

Procedures

SY-AA-103-500

Access Authorization Program

71130.08

Self-Assessments

PI-AA-126-1001-

F-01

Self-Assessment Plan 04668453, Security Pre-NRC

Self Assessment for Fitness for Duty

07/31/2023

through