IR 05000454/2023004
| ML24032A271 | |
| Person / Time | |
|---|---|
| Site: | Byron |
| Issue date: | 02/02/2024 |
| From: | Hironori Peterson NRC/RGN-III/DORS/RPB3 |
| To: | Rhoades D Constellation Energy Generation, Constellation Nuclear |
| References | |
| IR 2023004 | |
| Download: ML24032A271 (1) | |
Text
SUBJECT:
BYRON STATION - INTEGRATED INSPECTION REPORT 05000454/2023004 AND 05000455/2023004
Dear David Rhoades:
On December 31, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Byron Station. On January 18, 2024, the NRC inspectors discussed the results of this inspection with A. Schuerman, Plant Manager, and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Hironori Peterson, Chief Reactor Projects Branch 3 Division of Operating Reactor Safety Docket Nos. 05000454 and 05000455 License Nos. NPF-37 and NPF-66
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000454 and 05000455
License Numbers:
Report Numbers:
05000454/2023004 and 05000455/2023004
Enterprise Identifier:
I-2023-004-0046
Licensee:
Constellation Energy Generation, LLC
Facility:
Byron Station
Location:
Byron, IL
Inspection Dates:
October 01, 2023 to December 31, 2023
Inspectors:
B. Bergeon, Senior Operations Engineer
N. Bolling, Project Engineer
J. Cassidy, Senior Health Physicist
A. Demeter, Resident Inspector
G. Hansen, Sr. Emergency Preparedness Inspector
R. Knutson, Illinois Emergency Management Agency
G. Roach, Senior Operations Engineer
J. Robbins, Senior Resident Inspector
A. Shaikh, Senior Reactor Inspector
Approved By:
Hironori Peterson, Chief
Reactor Projects Branch 3
Division of Operating Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Byron Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
PLANT STATUS
Unit 1 began the inspection period operating at full power. On September 16,2023, power was reduced to support replacement of a 1A reactor coolant loop flow instrument. Subsequently, the unit returned to full power. With the exception of minor reductions in power to support scheduled testing activities and load changes requested by the transmission system dispatcher, the unit remained operating at or near full power for the remainder of the inspection period.
Unit 2 began the inspection period operating at full power. With the exception of minor reductions in power to support scheduled testing activities and load changes requested by the transmission system dispatcher, the unit remained operating at or near full power until September 20, 2023. On October 9,2023, the unit was shut down. Following completion of refueling and other maintenance activities, the reactor was restarted and taken critical on October 26, 2023. The unit reached full power operation on October 29, 2023, and continued operating at or near full power for the remainder of the inspection period.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.01 - Adverse Weather Protection
Seasonal Extreme Weather Sample (IP Section 03.01) (1 Sample)
- (1) The inspectors evaluated readiness for seasonal extreme weather conditions prior to the onset of seasonal cold temperatures on November 21, 2023.
71111.04 - Equipment Alignment
Partial Walkdown Sample (IP Section 03.01) (3 Samples)
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
- (1) Unit 2 A Train of the Residual Heat Removal (RH) System during Refuel Outage B2R24 on October 11, 2023
- (2) Unit 2 B Train of RH System during Refuel Outage B2R24 on October 19, 2023
- (3) Unit 1 Spent Fuel Pool Train during Refuel Outage B2R24 on October 24, 2023
71111.05 - Fire Protection
Fire Area Walkdown and Inspection Sample (IP Section 03.01) (3 Samples)
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
- (1) Storage Tank Rooms following discovery of a leaking sprinkler in the 2B Diesel Oil Storage Tank (DOST) Room, as documented in Issue Report (IR) 4706956 on October 10, 2023
- (2) Units 1 and 2 Auxiliary Feedwater (AF) Pump and Day Tank Rooms following discovery of several leaking CO2 valves, as documented in various IRs on October 11, 2023
- (3) Review of disposition and acceptability of ultrasonic testing measurements of fire protection piping, as documented in various IRs on October 11, 2023
71111.06 - Flood Protection Measures
Flooding Sample (IP Section 03.01) (1 Sample)
- (1) The inspectors evaluated flooding mitigation protections in the Unit 2 Tendon Tunnel following the discovery of standing water in the tunnel, as documented in IR 4706273 on October 19, 2023.
===71111.08P - Inservice Inspection Activities (PWR) The inspectors verified that the reactor coolant system boundary, reactor vessel internals, risk-significant piping system boundaries, and containment boundary are appropriately monitored for degradation and that repairs and replacements were appropriately fabricated, examined, and accepted by reviewing the following activities from October 10 to 17, 2023.
PWR Inservice Inspection Activities Sample - Nondestructive Examination and Welding Activities (IP Section 03.01)===
The inspectors verified that the following nondestructive examination and welding activities were performed appropriately:
(1)
- Ultrasonic Examination on 2RC14AD-2 (Augmented MRP-146 exams) 2" Branched Connection off Reactor Coolant System (RCS) Leg
- Magnetic Particle Examination of 2SX06BB Closure Plate
- Liquid Penetrant Examination of Reactor Pressure Vessel (RPV) Upper Head Penetrations 6 and 68
- 2AF00A IST Disassembly and Inspection Welding PWR Inservice Inspection Activities Sample - Vessel Upper Head Penetration Inspection
Activities (IP Section 03.02) (1 Sample)
The inspectors verified that the licensee conducted the following vessel upper head penetration inspections and addressed any identified defects appropriately:
(1)
- RPV Upper Head Penetrations Bare Metal Visual (BMV) Examination PWR Inservice Inspection Activities Sample - Boric Acid Corrosion Control Inspection Activities (IP Section 03.03) (1 Sample)
The inspectors verified the licensee is managing the boric acid corrosion control program through a review of the following evaluations:
(1)
- IR 04678585 - Inactive Boric Acid Leak on 2CS01AA-16" Bolted Flange
- IR 04666344 - 2CV8516 Cation Inlet Isolation Leak
- IR 04501664 - Active Boric Acid Leak on 2FI-0631 Threaded Fittings
- IR 04506666 - Active Boric Acid Leak from Flange Upstream of 2SI077
71111.11 A - Licensed Operator Requalification Program and Licensed Operator Performance Requalification Examination Results (IP Section 03.03)
- (1) The inspectors reviewed and evaluated the licensed operator examination failure rates for the requalification annual operating exam administered between August 15 and September 25, 2023.
71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)
- (1) The inspectors observed and evaluated licensed operator performance in the control room during various on-watch shift crew observations including shutdown, cooldown, and Reactor Coolant System (RCS) drain down to reduced inventory for Unit 2 Refuel Outage B2R24 on October 26, 2023.
71111.12 - Maintenance Effectiveness
Maintenance Effectiveness (IP Section 03.01) (1 Sample)
The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:
- (1) Maintenance effectiveness review associated with the 2 A Emergency Diesel Generator Ventilation System following the failure of a ventilation fan, as documented in IR 4714774 on November 15, 2023.
71111.13 - Maintenance Risk Assessments and Emergent Work Control
Risk Assessment and Management Sample (IP Section 03.01) (1 Sample)
The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:
- (1) Evaluation of the B2R24 Shutdown Safety Plan, as documented on September 21, 2023, on October 2, 2023.
71111.15 - Operability Determinations and Functionality Assessments
Operability Determination or Functionality Assessment (IP Section 03.01) (5 Samples)
The inspectors evaluated the licensees justifications and actions associated with the following operability determinations and functionality assessments:
- (1) Evaluation of the operability of 2RH8716B following changes in conservative uncertainties, as documented in IR 4701984 on November 14, 2023
- (2) Evaluation of the operability of valve 2AF013A following issues stroking, as documented in IR 4707513 on October 6, 2023
- (3) Evaluation of the operability of 2 A Diesel Generator following the failure of the vent fan, as documented in IR 4714774 on November 2, 2023
- (4) Evaluation of the operability of valve 2AF005G following issues stroking, as documented in IR 477822 on October 7, 2023
- (5) Evaluation of the operability of the 2B Reactor Coolant Pump following identification of noises during startup and shutdown, as documented in IR 4708074 on October 9, 2023
71111.20 - Refueling and Other Outage Activities
Refueling/Other Outage Sample (IP Section 03.01) (1 Sample)
- (1) The inspectors evaluated refueling outage B2R24 activities from October 9 through October 26, 2023.
71111.24 - Testing and Maintenance of Equipment Important to Risk
The inspectors evaluated the following testing and maintenance activities to verify system operability and/or functionality:
Post-Maintenance Testing (PMT) (IP Section 03.01) (5 Samples)
- (1) Functional and operational testing of the 2B AF Pump testing following maintenance, as documented in multiple work orders (WOs) on October 26, 2023
- (2) Moveable Incore Detectors and Power Distribution Monitoring System testing following maintenance, as documented in multiple WOs on October 30, 2023
- (3) Functional and operational testing of the Fuel Transfer System following load cell following maintenance, as documented in WO 5309497 on October 11, 2023
- (4) Functional and operational testing of Unit 2 Containment Recirculation Sump Outlet Isolation Valve, 2SI8811B, following maintenance, as documented in WO 5126812 on October 3, 2023
- (5) Functional and operational testing of the 2 A Diesel Generator Ventilation System following failure of fan 2VD01CA, as documented in WO 5414289 on November 08, 2023
Surveillance Testing (IP Section 03.01) (3 Samples)
- (1) Unit 2 2B Diesel Generator (DG) Surveillance testing, as documented in multiple WOs on October 19, 2023
- (2) Multiple surveillances to restore operability to the 2B AF pump, as documented in various WOs on October 26, 2023
- (3) Unit Common 0 A Essential Service Water Makeup Pump Surveillance testing, as documented in WO 5415304 on November 29, 2023
Inservice Testing (IST) (IP Section 03.01) (1 Sample)
- (1) Unit 2 Comprehensive Inservice Testing (IST) Requirements for Safety Injection (SI) Pumps A and B, as documented in WOs 5291695 and 5295785 on October 18, 2023
Containment Isolation Valve (CIV) Testing (IP Section 03.01) (1 Sample)
(1)2BOSR 6.1.1-25; Unit 2 Primary Containment Type B Local Leak Rate Testing of Spare Containment Penetrations, as documented in WOs 5256840 and 5256841 on October 18, 2023
71114.04 - Emergency Action Level and Emergency Plan Changes
Inspection Review (IP Section 02.01-02.03) (1 Sample)
- (1) The inspectors completed an evaluation of Emergency Action Level (EAL) and Emergency Plan changes on December 18, 2023. For the inspection period from July 01, 2022, through June 30, 2023, the licensee did not make any changes to the site Emergency Plan and EAL Bases/Matrix documents. The inspectors independently reviewed the current revisions of these documents to verify no changes were completed.
This evaluation does not constitute NRC approval.
71114.06 - Drill Evaluation
Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01) (1 Sample)
- (1) Technical Support and Operations Support Centers Focus Area Drill Training on December 20,
RADIATION SAFETY
71124.01 - Radiological Hazard Assessment and Exposure Controls
Contamination and Radioactive Material Control (IP Section 03.03) (2 Samples)
The inspectors observed/evaluated the following licensee processes for monitoring and controlling contamination and radioactive material:
- (1) Licensee surveys of potentially contaminated material leaving the radiologically controlled area (RCA) and workers exiting the RCA at Unit 2 Contractors Access Facility during a refueling outage
- (2) Workers exiting the protected area through Whole Body Monitors at the Main Access Facility 1 during a refueling outage
71124.03 - In-Plant Airborne Radioactivity Control and Mitigation
Permanent Ventilation Systems (IP Section 03.01) (1 Sample)
The inspectors evaluated the configuration of the following permanently installed ventilation systems:
- (1) Fuel Handling Building Exhaust Filter Ventilation System
Self-Contained Breathing Apparatus for Emergency Use (IP Section 03.04) (1 Sample)
- (1) The inspectors evaluated the licensees use and maintenance of self-contained breathing apparatuses.
71124.04 - Occupational Dose Assessment
Source Term Characterization (IP Section 03.01) (1 Sample)
- (1) The inspectors evaluated licensee performance as it pertains to radioactive source term characterization.
External Dosimetry (IP Section 03.02) (1 Sample)
- (1) The inspectors evaluated how the licensee processes, stores, and uses external dosimetry.
Special Dosimetric Situations (IP Section 03.04) (2 Samples)
The inspectors evaluated the following special dosimetric situations:
- (1) Declared Pregnant Worker - EID 086635 and 9775022
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
MS10: Cooling Water Support Systems (IP Section 02.09)===
- (1) Unit 1 (October 1, 2022 through September 30, 2023)
- (2) Unit 2 (October 1, 2022 through September 30, 2023)
BI02: RCS Leak Rate Sample (IP Section 02.11) (2 Samples)
- (1) Unit 1 (October 1, 2022 through September 30, 2023)
- (2) Unit 2 (October 1, 2022 through September 30, 2023)
71152 A - Annual Follow-up Problem Identification and Resolution Annual Follow-up of Selected Issues (Section 03.03)
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
- (1) The inspectors performed a detailed review of various IRs pertaining to the process of scheduling, ordering, receipt, issuance, and installation of parts and equipment. An in-depth review of the barriers associated with this process flow was selected due to the inherent safety significance and quality control requirements associated with the procurement, acceptance, and use of safety related parts within the plant on December 13, 2023.
- (2) The inspectors performed a detailed review of oil sample test results for each emergency diesel generator in response to recent operating experience with diesel lubricating oil contamination on December 19, 2023.
71152 S - Semiannual Trend Problem Identification and Resolution Semiannual Trend Review (Section 03.02)
- (1) The inspectors reviewed the licensees corrective action program and other licensee trending programs for potential adverse trends that might be indicative of a more significant safety issue. The inspectors observed a potential trend in 0A Essential Service Water Makeup Pump trips as identified by the licensee in IR 4701152, Potential Trend in 0A Essential Service Water (SX) Makeup Pump Trips, on December 20,
INSPECTION RESULTS
Observation: Review of Oil Sample Test Results 71152A The inspectors performed a detailed review of oil sample test results in response to recent operating experience with diesel lubricating oil contamination as documented in IR 4718769, 2DG01KA (Prime Mover for the 2A Emergency Diesel Generator) Wear Metal Contamination.
Procedure MA-AA-716-230-1001, Oil Interpretation Guideline, identifies the alert range, for the Cooper Bessemer Diesels, for chromium, as > 5-10 ppm. The fault range for chromium is identified as > 10 ppm. The sample result dated November 3, 2023, indicated 13 ppm of chromium. An additional oil sample was subsequently taken and showed 7 ppm of chromium.
There is a scheduled work window for the 2DG01KA diesel in the spring of 2024. The licensee considered performing portions of this work early to address the potential concern with elevated chromium in the lubricating oil. Based on the additional oil sample test results, the license determined that it would be sufficient to monitor diesel performance, as this lower level of chromium is not expected to challenge the ability of the diesel to perform its function, until the scheduled work window arrives in the spring.
No findings or violations of NRC requirements of more than minor safety significance were identified by the inspectors in the course of this review.
Observation: Review of the Process of Scheduling, Ordering, Receipt, Issuance, and Installation of Parts and Equipment 71152A The inspectors performed a detailed review of various IRs pertaining to the process of scheduling, ordering, receipt, issuance, and installation of parts and equipment. An in-depth review of the barriers associated with these processes was selected due to the inherent safety significance and quality control requirements associated with the procurement, acceptance, and use of safety related parts within the plant.
Procedure WC-AA-101-1002, Work Scheduling, provides a process overview of the online scheduling process including guidance for support groups that participate in the online scheduling process. SM-AA-102, Warehouse Operations, establishes the process for receipt, storage, and handling material, parts, and components through the stations warehouses. The inspectors used WC-AA-101-1002 and SM-AA-102 to determine what barriers exist to prevent incorrect equipment from being installed in plant applications, then compared these to 28 issues involving incorrect parts pulled from the corrective action program (CAP). The inspectors made several observations with regards to the IRs:
- The most common themes documented under the why did the condition happen portion of the IR were errors in human performance and changes or substitutions made by the vendor without prior notification.
- Nine of the 28 IRs identified instances where the issue with parts was discovered at the last barrier prior to improper installation - during the execution of the work.
Despite this, the assessment of like-for-like parts at the jobsite proved successful in identifying problems with parts and documenting them in the CAP. This barrier proved to be effective even during periods of increased maintenance activities, such as during outages.
- An additional nine of the 28 IRs documented issues where incorrect parts were discovered to have already been installed in error without the physical changes being evaluated as required by procedure SM-AA-300-1002, Bill of Material Development and Right Parts Selection for Maintenance. Evaluations performed upon discovery determined the technical changes of the incorrect parts did not change the function of the part, nor impact component/system performance.
No findings or violations of NRC requirements of more than minor safety significance were identified by the inspectors in the course of this review.
Observation: Semiannual Trend Review of IR 4701152, Potential Trend in 0A Essential Service Water (SX) Makeup Pump Trips 71152S The inspectors performed a detailed review of IRs and corrective actions associated with IR 4701152, Potential Trend in 0A Essential Service Water (SX) Makeup Pump Trips.
In short, this document identifies four trips of the 0A SX Makeup Pump that occurred between April of 2022, and September of 2023. The individual failures were documented in IRs: 4489594, 4490482, 4539770, 4687057, and 4701020.
In accordance with corrective action program requirements, the licensee performed extent of condition and cause reviews. Additionally, preventive maintenance activities and schedules were also reviewed for potential modification. Lastly, these events were reviewed for impact to licensee performance goals established as part of their Maintenance Rule program.
No findings or violations of NRC requirements of more than minor safety significance were identified by the inspectors in the course of this review.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On January 18, 2024, the inspectors presented the integrated inspection results to A. Schuerman, Plant Manager, and other members of the licensee staff.
- On October 13, 2023, the inspectors presented the radiation protection inspection results to S. Leach, Radiation Protection Manager, and other members of the licensee staff.
- On October 17, 2023, the inspectors presented the Inservice Inspection (ISI) Exit Meeting inspection results to P. Murray, Engineering Manager, and other members of the licensee staff.
- On December 18, 2023, the inspectors presented the emergency preparedness inspection results to R. Pauley, Emergency Preparedness Manager, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
4698132
Install Thermal Covers on Empty HI Storms
08/23/2023
4713603
Heaters in MSIV Rebuild Building are Not Working
10/30/2023
4714534
DCS - Heaters Not Working in Dry Cask Storage Building
11/01/2023
4714554
1SH06AQ Fan Does Not Run
11/01/2023
4714555
0SH23AJ Fan Will Not Run and Needs Cleaning
11/01/2023
4714556
0SH23AN Fan Will Not Run and Needs Cleaning
11/01/2023
4714562
0SH23AR Fan Will Not Run
11/01/2023
4714563
0SH23AG Fan Will Not Run
11/01/2023
4714678
2SH15AB Fan Would Not Start. Winter Readiness
11/02/2023
4714679
2SH15AF Fan Would Not Start. Winter Readiness
11/02/2023
4714683
2SH15AH Fan Would Not Start. Winter Readiness
11/02/2023
4714684
2SH15AJ Fan Would Not Start. Winter Readiness
11/02/2023
4714686
2SH15AL Fan Would Not Start. Winter Readiness
11/02/2023
4714687
2SH15AS Fan Would Not Start. Winter Readiness
11/02/2023
4714688
2SH15AT Fan Would Not Start. Winter Readiness
11/02/2023
4714974
Dirty SH Heater
11/03/2023
4714976
SH Area Heater Fan Not Auto Starting
11/03/2023
4714977
SH Area Heater Fan Not Running
11/03/2023
4714978
SH Area Heater Fan Not Auto Starting
11/03/2023
4714981
SH Area Heater Fan Not Auto Starting
11/03/2023
4714982
SH Area Heater Fan Not Auto Starting
11/03/2023
4714984
SH Area Heater Fan Not Auto Starting
11/03/2023
4714986
Heater ESUH-2 Inoperable
11/03/2023
4716720
Unit 1 VA Supply Filters Need Changed Out
11/10/2023
4716988
Portion of TB Louvers Missing on 451
11/11/2023
Corrective Action
Documents
4717221
Broken Louvers on 426 for Turbine Building Louver LV-6
11/13/2023
0BOSR XFT-A1
Freezing Temperature Equipment Protection SH and
Department Support Requirements
0BOSR XFT-A2
Freezing Temperature Equipment Protection Auxiliary Steam
Boilers
Procedures
0BOSR XFT-A3
Freezing Temperature Equipment Protection Plant
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Ventilation Systems
0BOSR XFT-A4
Freezing Temperature Equipment Protection Protected Area
Buildings Ventilation Systems and Tanks
0BOSR XFT-A5
Freezing Temperature Equipment Protection Non-Protected
Area Buildings
OP-AA-108-111-
1001
Severe Weather and Natural Disaster Guidelines
Winter Safety
Seasonal Readiness
M-135, Sheet 1B
Diagram of Reactor Coolant Loop 1
BD
M-135, Sheet 2
Diagram of Reactor Coolant Loop 2
AQ
M-135, Sheet 3
Diagram of Reactor Coolant Loop 3
AX
M-135, Sheet 4
Diagram of Reactor Coolant Loop 4
M-136, Sheets 4,
5, and 6
Diagram of Safety Injection
AZ, P, and
RC-14
03/30/1981
SI-32
Safety Injection
03/30/1981
SI-34
Large Bore Isometric Safety Injection - SI
SI-34
Safety Injection
06/02/1981
SI-35
Large Bore Isometric Safety Injection - SI
SI-36
Safety Injection Containment Building Unit 2
06/18/1981
SI-40
Large Bore Isometric Safety Injection
Drawings
SI-50
Large Bore Isometric
BOP RH-E2A
Residual Heat Removal System Train A Electrical Lineup
BOP RH-M2A
Train A Residual Heat Removal System Valve Lineup
BOP SX-E2A
Essential Service Water Train A Electrical Lineup
Procedures
BOP SX-M2A
Train A Essential Service Water System Valve Lineup
4706956
2B DOST Room has a Leaking FP Sprinkler Head
10/04/2023
4707613
Concerns Associated with License Renewal Requirements
10/06/2023
4707706
Update Required to Fire Safe Shutdown Analysis
10/06/2023
4708108
0CO022 Leaking CO2
10/09/2023
4708130
Small Sparking Observed in 2AP15E (Substation 233Y)
10/09/2023
Corrective Action
Documents
4708133
0CO046 Leaking CO2
10/09/2023
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
4708137
0CO002 Leaking CO2
10/09/2023
4708138
0CO003 CO2 Leak
10/09/2023
4708221
0FP09AB-12 UT Inspection Results
10/09/2023
4708223
0FP11AB-12 UT Inspection Results
10/09/2023
4708245
2FP010 Dual Indication While Performing 2BOSR 3.2.9-2
10/09/2023
4708313
Fire Protection Deluge Pipe Contacting Metal Bar Over 133Y
10/09/2023
4708327
Active Track Supervisory Low Pressure Switch
Alarm 2FP07J
10/09/2023
Drawings
M-52-4
Diagram of Fire Protection
01/31/1996
Engineering
Changes
456114
Various Low Min Wall Evaluations for SX Lines for Rawwater
Program EOC Inspections and Phased Array Inspections
01/11/2023
PRE-FIRE PLAN
- 132 FZ 11.4-0
NORTH
Aux. Bldg. 383'-0 Elev. General Area - North
PRE-FIRE PLAN
- 137 FZ 11.4A
Aux. Bldg. 383'-0 Elev. Unit 1 1B Aux. Diesel Feedwater
Pump and Day Tank Room
PRE-FIRE PLAN
- 138 FZ 11.4A-2
AUX. BLDG. 383'-0 Elev. Unit 2 2B Aux. Diesel Feedwater
Pump and Day Tank Room
PRE-FIRE PLAN
- 67 FZ 8.3-2
Southwest Turbine Bldg. 401'-0 Elev. Unit 2
Turbine Bldg. - SW
PRE-FIRE PLAN
- 89 FZ 9.1-2, FZ
9.4-2
Aux. Bldg. 401'-0 Elev. 2B Diesel Generator & Day Tank
Room
PRE-FIRE PLAN
- 91 FZ 9.2-2, FZ
9.3-2
Aux. Bldg. 401'-0 Elev. 2A Diesel Generator & Day Tank
Room
PRE-FIRE PLAN
- 93 FZ 10.1-2
Aux. Bldg. 383'-0 Elev. 2B Diesel Fuel Oil Storage Tank
Room
Fire Plans
PRE-FIRE PLAN
- 95 FZ 10.2-2
Aux. Bldg. 383'-0 Elev. 2B Diesel Fuel Oil Storage Tank
Room
0BOL 10.a
LCOAR Fire Detection Instrumentation TRM LCO # 3.10.a
0BOL 10.d
LCOAR CO2 Systems TRM LCO # 3.10.d
Procedures
BOP CO-M2
Carbon Dioxide System Valve Lineup
Work Orders
1549159
Fire Protection Deluge Pipe Contacting Metal Bar Over 133Y
10/10/2023
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
298154
10/09/2023
298161
10/09/2023
1679989
UNIT 2 Buttress #6 Never Had a Drain Line Installed
07/09/2014
2539344
Water in Containment Buttress #6
08/09/2015
2668952
DF Side of Buttress #6 has Standing Rain Water
05/13/2016
4032391
- 6 Buttress West Side has ~2 Feet of Water in Bottom
07/17/2017
22434
Excessive Runtime U2 Tendon Tunnel Sump 2A
2/28/2020
Corrective Action
Documents
23445
Discovery of Free Water in Five Unit 2 Tendons
03/03/2020
Drawings
Containment Bldg. Tendon Tunnel Floor Plan
06/09/2009
Miscellaneous
Submittal of Relief Request I4R-18 for Byron Station, Units 1
and 2, Concerning Containment Unbonded Post-Tensioning
System Inservice Inspection Requirements
07/24/2020
Procedures
BOP TF-108
Pumping Tendon Tunnel Sump with Temporary Sump
Pumps
1548513
Standing Water in U2 Tendon Tunnel
10/02/2023
Work Orders
5143028
Standing Water in The U-1 Tendon Tunnel
03/27/2023
04501664
Active Boric Acid Leak on 2FI-0631 Threaded Fittings
05/24/2022
04506666
Active Boric Acid Leakage from Flange Upstream of 2SI077
06/21/2022
04666344
2CV8516 Cation Inlet Isolation Leak
03/31/2023
Corrective Action
Documents
04678585
Inactive Boric Acid Leak on 2CS01AA-16" Bolted Flange
05/16/2023
04708911
NRC ID: Inadequate Evaluation on 2FE-0136 Bolting
10/11/2023
Corrective Action
Documents
Resulting from
Inspection
04709467
NRC ID: Incorrect Methodology for 2SIE8A-2" Active
Leakage
10/13/2023
Magnetic Particle Examination on 2SX06BB-16"
10/13/2023
Liquid Penetrant Examination on RPV Head Penetration
No. 68
10/14/2023
Liquid Penetrant Examination on RPV Head Penetration
No. 6
10/14/2023
Ultrasonic Examination on 2RC14AD-2 Zone 6
10/11/2023
NDE Reports
RPV Head Surface and Penetrations Bare Metal Visual
Examination
10/16/2023
Procedures
Liquid Penetrant (PT) Examination
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Magnetic Particle (MT) Examination
Ultrasonic Examination of Austenitic Piping Welds
Bare Metal Visual Examination of Nickle Alloy Materials
Work Orders
05091593-10
IST Disassembly and Inspection Welding on 2AF00A
2BGP 100-3
Power Ascension
105
Shutdown Of A Purification Loop For The Refueling Cavity
BOP RC-1
Startup of A Reactor Coolant Pump
BOP RC-10b
Draining an Isolated Reactor Coolant Loop for Unit 2
BOP RC-4
Reactor Coolant System Drain
BOP RE-5
Inerting the RCDT
BOP SI-23
Raising SI Accumulator Level in Mode 4, 5, or 6
Procedures
BOSR 0.1-5
Unit Two Mode 5 Shiftly and Daily Operating Surveillance
27465
Issues Identified on 1VD01CA Fan During DG Work
Window
06/03/2009
252529
2A DG Vent Fan Failed to Start During 2BOSR 8.1.2-1
08/17/2011
1567369
PI&R 2A DG Operability Concern
09/26/2013
4714774
Low dP Alarm on 2A DG Vent Fan
11/02/2023
4716165
EOC Work Due to DG Vent Fan Failure
11/08/2023
4716167
EOC Work Due to DG Vent Fan Failure
11/08/2023
Corrective Action
Documents
4716168
EOC Work Due to DG Vent Fan Failure
11/08/2023
BOP DG-11T2
Diesel Generator Operating Log
BOP VD-5
DG Room Ventilation System Operation
BOP VD-6
Emergency Restoration of the DG Room Ventilation System
Equipment Reliability Program Description
Preventive Maintenance Program
Equipment Classification
System And Equipment Health Monitoring
System And Equipment Health Monitoring
Maintenance Rule Functions - Safety Significance
Classification
Maintenance Rule Implementation per NEI 18-10
Predictive Maintenance Program
Procedures
Torquing and Tightening of Bolted Connections
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Miscellaneous
PORC Mtg: 23-
20
B2R24 Shutdown Safety Plan
09/21/2023
4540295
NRC-ID: 1CC685 Limit Control Scheme
2/01/2022
4540308
NRC IDd 2RY8000B Vale Factor Discrepancy
2/01/2022
4541139
NRC ID - POV Inspection Valve Factor Application
2/06/2022
4541231
NRC ID - Byron MOV Program Valve Factor Discrepancies
2/06/2022
4701984
2RH8716B Options for Diagnostic Testing in B2R24
09/12/2023
4707513
2AF013A Issues During Valve Stroke in The Open Direction
10/06/2023
4707822
2AF005G Appeared to Not Fully Close Locally
10/07/2023
Corrective Action
Documents
4708074
2B Reactor Coolant Pump Abnormal Noises on Shutdown
10/09/2023
MOV Rising Stem Motor Operated Valve Thrust and Torque
Sizing and Set-Up Window Determination Methodology
Procedures
Motor-Operated Valve Maintenance and Testing Guideline
1632009
MOV PM, Actuator Inspection, Diagnostic Testing
10/07/2014
Work Orders
250359
PM Inspection, In-Service Diag Test, PIT
10/14/2023
4709459
2RC8003C has the Wrong Gear in it
10/13/2023
Corrective Action
Documents
4709630
Security - Fatigue Assessment
10/14/2023
2BGP 100-2
Plant Startup
2BGP 100-2A1
Reactor Startup
2BGP 100-3
Power Ascension
105
2BGP 100-3T2
Mode 2 to 1 Checklist
OP-AA-106-101-
1006
Operational Decision Making (ODM) Process
Refuel Outage Management
Procedures
Shutdown Safety Management Program Byron/Braidwood
Annex
4377305
2PS9356B Doesnt Stroke Fully Open Following
Maintenance
10/17/2020
4377380
2PS9356B is not Operable
10/17/2020
4403064
MOV 2SI8811B Actuator Grease at Grade 3
2/17/2021
4418017
2E Incore Withdrawn Limit Switch Issue
04/21/2021
4465875
2E Incore Withdrawn Limit Switch Failed PMT
2/10/2021
Corrective Action
Documents
4495518
B2R23 2PS9356B Failed as Left LLRT
04/25/2022
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
4497046
2PS9356B Requires New Solenoid REF WO 5089242-06
05/02/2022
4701152
Potential Trend in 0A SX Makeup Pump Trips.
09/08/2023
4701868
0A SX Makeup Pump Battery Charger Would Not Go on
Equalize.
09/11/2023
4709604
2B AF Pump Diesel Driver Cylinder and Piston Degradation
10/14/2023
4710010
2PS9356B Failed As-Found LLRT at 36.6 SCFH
10/16/2023
4711043
CeramAlloy Repairs Needed on 2B AF HX
10/19/2023
4712979
2E Withdraw Limit Still Not Making Up
10/27/2023
4714774
Low dP Alarm on 2A DG Vent Fan
11/02/2023
20421
Unexpected Alarm SX Makeup Pump Auto Start
11/29/2023
Miscellaneous
- 20-023
PORC Meeting Minutes for ER-AA-380 Appendix J Leakage
Discussions
10/19/2020
2BGP 100-1T3
Mode 4 to 3 Checklist
2BOSR 0.5-
2.SI.2-4
Unit Two 2SI8801A and 2SI8801B Stroke Time and Position
Indication Test
2BOSR 1.6.1-1
Unit Two Predicted Critical Control Rod Position Surveillance
2BOSR
5.5.8.AF.5-2a
Unit Two Group A Inservice Testing (IST) Requirements for
the Diesel Driven Auxiliary Feedwater Pump 2AF01PB
2BOSR
5.5.8.AF.5-2b
Unit Two Group B Inservice Testing (IST) Requirements for
Diesel Driven Auxiliary Feedwater Pump 2AF01PB
2BOSR
5.5.8.SI.5-1c
Unit Two Comprehensive Inservice Testing (IST)
Requirements for Safety Injection Pump 2SI01PA
2BOSR 6.1.1-25
Unit Two Primary Containment Type B Local Leakage Rate
Test of Spare Containment Penetrations
2BOSR 7.5.4-2
7.5.4-2 Unit Two Diesel Driven Auxiliary Feedwater Pump
Monthly Surveillance
2BOSR 7.5.7-2
Unit Two Train B Auxiliary Feedwater Flowpath Operability
Surveillance Following Shutdown
2BOSR 8.1.11-2
Unit Two 2B Diesel Generator Sequencer Test
2BOSR 8.1.17-2
Unit Two 2B Diesel Generator SI Signal Override Test
2BOSR Z.7.a.1
Unit Two Auxiliary Feedwater Diesel Engine Starting
Sequence and Overspeed Trip Test
Procedures
2BVSR 3.a.1-1
Unit Two Moveable Incore Detectors Operability Check
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
2BVSR 6.1.1-24
Unit 2 Summation of Primary Containment Type B & C
Local Leakage Tests for Acceptance Criteria
BMP 3203-1
Preventive Maintenance of Auxiliary Feedwater Pump Diesel
Drive Unit
BOP AF-1
Diesel Driven Aux Feedwater Pump Alignment to Standby
Condition
BOP AF-7
Diesel Driven Auxiliary Feedwater Pump B Startup on Recirc
BOP AP-32
Synchronizing A SAT to A Bus Being Fed by A DG
BOP CD/CB-3
Condensate/Condensate Booker System Fill and Vent
BOP DG-1
Unit One/Two Diesel Generator Alignment to Standby
Condition
BOP DG-11
Diesel Generator Startup
BOP IC-3
Moveable Incore Detectors Flux Mapping Procedure
BOP IC-7
Moveable Incore Detector Operation
BOP RH-6
Operation of the RH System in Shutdown Cooling
BOP SI-1
Safety Injection System Startup
BVP 500-31
Moveable Incore Detectors Core Limit Alignment Procedure
BVP 800-39
Byron Containment Leakage Rate Testing Program
Plant Barrier Control Program
CC-AA-201-F-01
Plant Barrier Impairment Permit 23-199
Power Distribution Monitoring System Calibration
Byron Station Transfer System Winch Load Cell Calibration
1339886
Replace Live Load Packing Belleville Washers on 2AF004B
10/22/2023
1342621
OPS - Post Maintenance Testing - STT/PIT 2SI8811B
10/03/2023
1344261
Work Request Needed for Grease in 2SI8811B
10/03/2023
1782794
AF Diesel Flywheel Inspection (Non-Intrusive)
10/25/2023
1782795
Replace AF Diesel Fuel Injectors
10/25/2023
1782795
Replace AF Diesel Fuel Injectors
10/20/2023
1914932
Rebuild Actuator, Replace Regulators / Replace Elastomers
10/17/2020
4956020
Replace AF PP/Gearbox Lube Oil System Relief Valve
10/20/2023
5088095
Failed PMT on 2SX176
10/20/2023
Work Orders
5088844
Flowscan Valve 2SX168
10/19/2023
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
5089242
2PS9356B Doesnt Stroke Fully Open Following
Maintenance
04/25/2022
26812
Inspect Motor Pinion Gear for Correct Size
10/03/2023
250145
2B Diesel Generator SI Signal Override Test
10/17/2023
250147
2B Diesel Generator Sequencer Test
10/18/2023
250154
2AF014G IST Disassembly and Inspection
10/25/2023
250156
AF Diesel Turbocharger Inspection
10/25/2023
250157
10/25/2023
250158
Change Grease in Couplings (2) per BMP 3229-1 Section
10/20/2023
250219
2B AF Valve Emergency Actuation Signal Verification Test
10/24/2023
250486
Replacement of the Fuel Shutoff Solenoid
10/25/2023
252245
2A/B Stagger - AF VLV Emerg ACT SIG Test
10/24/2023
256840
As Found LLRT of Spare CNMT Penetrations P-74
10/17/2023
256841
LLRT for P-64 - Spare
10/17/2023
258572
Aux Feedwater Diesel Prime Mover Inspection Schedule
10/25/2023
260502
MIDS Operability Check (Full Power Plateau)
10/27/2023
260503
MIDS Operability Check (Low Power Plateau)
10/29/2023
260507
Inspect 10 Path Transfer Unit & Plungers
10/27/2023
260819
Axial Flux Difference Single Point Calibration (>15% T)
10/27/2023
260982
AF004B Requires Packing Retorque in 1 Year or
Refuel Cycle
10/24/2023
267996
LR-2AF01AB - HX Inspection per Generic Letter 89-13
10/25/2023
267997
Replace Actuators with Refurbished Spare
10/22/2023
270811
LR-2SX02K - HX Inspection per Generic Letter 89-13
10/25/2023
270814
LR-2AF02A - HX Inspection per Generic Letter 89-13
10/25/2023
275678
2B AF Diesel Driven Pump Flexible Hoses Replacement
10/25/2023
291695
2SI01PA Comprehensive IST RQMTS for Safety Injection
Pump
10/11/2023
295785
2SI01PB Comprehensive IST Rqmts for Safety Injection
Pump
10/11/2023
5303074
ECCS Subsystem Automatic Valve Actuation Test
10/03/20203
5306202
Diesel Driven AF PP Insp to Support 2BVSR Z.7.A.1
10/21/2023
5308035
Change Actuator on 2AF004B to CAT ID 01443459
10/24/2023
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
5309497
EWP IM Support RXS with Emergent Issues During
Fuel Moves
10/11/2023
5315794
AF Diesel Rocker Covers, Exhaust Maniforlds, and
Insulation
10/25/2023
5405605
0SX02PA Comprehensive IST Requirements for SX Makeup
Pump
11/29/2023
5406818
(NEIL) - 2B Diesel Driven AF Pump Monthly Surveillance
10/25/2023
5406844
Quadrant Power Tilt Ratio Calculation
10/30/2023
5406845
Axial Flux Difference Surveillance
10/30/2023
5414289
Low dP Alarm on 2A DG Vent Fan
11/08/2023
5415304
LR - 0A SX Makeup Pump Operability Surveillance
11/29/2023
21566
URI Shift Dose Assessment Training - Improper Scenarios
2/05/2023
22338
4Q2023 Unannounced Call-In Augmentation Drill Results
2/07/2023
23288
Byron Station Core Damage Assessment (CDAM)
Drill 12-13-23
2/13/2023
23545
Cal Expiring on EP Van Inventory
2/14/2023
Corrective Action
Documents
24510
TSC/OSC Audio Issues
2/19/2023
Emergency Preparedness Program Description
Radiological Emergency Plan Annex for Byron Station
Addendum 3
Emergency Action Levels for Byron Station
Operating Stations Emergency Preparedness Process
Description
Assessment of Emergencies
EP Fundamentals
ERO Fundamentals
Emergency Response Organization (ERO)/Emergency
Response Facility (ERF) Activation and Operation
TSC Activation and Operation
Operations Support Center Activation and Operation
Procedures
EP-AA-112-300-
F16
OSC Staff Guidelines
A
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Termination and Recovery
Emergency Plan Administration
Drills and Exercise Program
Drill and Exercise Planning and Scheduling
Drill and Exercise Execution
Drill and Exercise Evaluation
Emergency Preparedness Self Evaluation Process
Byron Station Radiological Emergency Plan
Corrective Action
Documents
Resulting from
Inspection
04709260
Procedure Revision Needed RP-BY-1003
10/13/2023
Checklist #:
2.12.2200.87
Respiratory SAR and SPR Monthly Checklist
07/28/2023
Checklist #:
2.12.2200.87
Respiratory SAR and SPR Monthly Checklist
09/28/2023
Respiratory SAR
and SPR Monthly
Checklist
Respiratory SAR and SPR Monthly Checklist
06/09/2023
S/N LA059454
Posi3 USB Test Results - Complete SCBA Test
07/19/2023
S/N LAG059463
Posi3 USB Test Results - Complete SCBA Test
07/20/2023
S/N LAG59457
Posi3 USB Test Results - Complete SCBA Test
07/18/2023
Miscellaneous
TRM Appendix K
Ventilation Filter Testing Program
Maintenance, Care and Inspection of Respiratory Protective
Equipment
Monthly Inspection and Maintenance of MSA FireHawk
Mask Mounted Regulator SCBAs
Procedures
RP-BY-825-1003
MSA FireHawk M7 Air Mask Self-Contained Breathing
Apparatus (SCBA) and Quarterly Breathing Air Testing
Work Orders
05404427 01
Charcoal Adsorber 720 Hour Check
10/05/2023
BYR-23-001
23 Bioassay Program Annual Review at Byron Nuclear
Power Station
03/15/2023
Miscellaneous
Unit 1 Alpha Area Level Assessment
05/26/2023
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Unit 2 Alpha Area Level Assessment
06/22/2022
05045238 01
0A Fuel Handling Building Exhaust Ventilation System
2/04/2020
05125798 01
0A Fuel Handling Building Exhaust Ventilation System
2/09/2021
Work Orders
269152 01
0A Fuel Handling Building Exhaust Ventilation System
06/08/2023
22870
0FP03PB Crankcase Breather Installed Without Evaluation
05/11/2021
25714
Parts Not Available for Scheduled Work due to
Obsolescence
05/26/2021
27571
Part Not Available for Scheduled Work - Vendor Lead Time
06/04/2021
4432445
Incorrect O-Ring Material Installed
06/30/2021
4445949
1CV01FA - 1A CV Seal Injection Filter not
Reserved/Available
09/13/2021
4448192
Snubber Changed DRS for CID 1396543, 1033720, and
26368
09/23/2021
4494037
Incorrect Replacement Part Ordered for Troubleshooting
04/19/2022
4495760
Incorrect Heat Exchangers Reserved for Work
04/26/2022
4496678
Rebuild Kit Not Compatible with 2AF004B Actuator
04/26/2022
24190
Cat ID 318514 Installed Without Evaluation
09/23/2022
4532749
New Firing Board CID 5704-1 Unexpected Configuration
10/27/2022
4532996
EC 635940 Install Milestone Missed - Parts Not Ordered
10/19/2022
4533917
Replacement Main Plug Installed Without Evaluation
11/01/2022
4543088
0CW216B and 0CW217B Replacement Installed Opposite
2/15/2022
4545606
Incorrect Batteries for FLEX Tractors
2/30/2022
4558412
Material Not Available for WO Execution
03/01/2023
4561752
1RH8701B Rotation Check Unsat
03/14/2023
4671933
Bolting Issue for SXCT Windows
04/21/2023
4688482
Replacement Wear Rings Installed Without Evaluation
07/03/2023
4690368
1SI8812B Motor Mounting Bolts Not Long Enough
07/12/2023
4701738
2SI8808C B2R24 Replacement Motor Not Like for Like
09/11/2023
Corrective Action
Documents
4701952
1RH8701B - Installed Motor Constructed Using Alum vs
09/12/2023
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Magn
4709459
2RC8003C has the Wrong Gear in It
10/13/2023
4709463
APS - 2RD01E MG Set Motor Lead Box Does Not Align
10/13/2023
4709558
APS Expanded Scope - 2AS162 Vlv Internal Build Up
10/14/2023
4709601
Incorrect Parts Stocked in Stores
10/14/2023
4709918
Unit 2 Refuel Machine Main Hoist Wire Rope Issue
10/16/2023
4709934
Incorrect POT Fuses Identified in Model Work Order
10/16/2023
4715992
Question on Configuration of New Actuators
11/06/2023
4716756
NRC ID: 2B DG Oil Leak from Cylinder 2R
11/09/2023
4718769
2DG01KA Wear Metal Contamination
11/20/2023
20552
Supply Ops - BYR WH Ops Assessment Report Action
Required
11/29/2023
21377
2A EDG Low Cylinder Peak Firing Pressure - 1L
2/04/2023
21470
Fuel Dilution in 2AF01PB-K Diesel Engine is in Alert Range
2/04/2023
22225
2B AF Diesel Crankcase Confirmatory Oil Sample Results
2/07/2023
F2372 Volume 1
Vendor Technical Manual - Cooper Energy Services Diesel
Engine Generator
Miscellaneous
Various
Lube Oil Sample Results for Each of the Emergency Diesel
Generators from July 2022 thru November of 2023
MA-AA-716-230-
1001
Oil Analysis Interpretation Guideline
MA-AA-716-230-
1004
Lubricant Sampling Guideline
Warehouse Operations
Bill of Material Development and Right Parts selection for
Maintenance
Nuclear Material Procurement
Procedures
On-Line Scheduling Process
4489594
0A SX M/U Pump Fuel Oil Filter Bullseye Air Bubble
04/01/2022
4490482
0A SX Makeup Pump Trip
04/05/2022
4539770
0A SX Makeup Pump Trip
11/30/2022
4687057
0A SX Makeup Pump Trip
06/27/2023
Corrective Action
Documents
4701020
0A SX Makeup Pump Trip
09/07/2023
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Maintenance Rule Implementation Per NEI 18-10
Procedures
Corrective Action Program Procedure