IR 05000454/2023004

From kanterella
Jump to navigation Jump to search
Integrated Inspection Report 05000454/2023004 and 05000455/2023004
ML24032A271
Person / Time
Site: Byron  Constellation icon.png
Issue date: 02/02/2024
From: Hironori Peterson
NRC/RGN-III/DORS/RPB3
To: Rhoades D
Constellation Energy Generation, Constellation Nuclear
References
IR 2023004
Download: ML24032A271 (1)


Text

SUBJECT:

BYRON STATION - INTEGRATED INSPECTION REPORT 05000454/2023004 AND 05000455/2023004

Dear David Rhoades:

On December 31, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Byron Station. On January 18, 2024, the NRC inspectors discussed the results of this inspection with A. Schuerman, Plant Manager, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Hironori Peterson, Chief Reactor Projects Branch 3 Division of Operating Reactor Safety Docket Nos. 05000454 and 05000455 License Nos. NPF-37 and NPF-66

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000454 and 05000455

License Numbers:

NPF-37 and NPF-66

Report Numbers:

05000454/2023004 and 05000455/2023004

Enterprise Identifier:

I-2023-004-0046

Licensee:

Constellation Energy Generation, LLC

Facility:

Byron Station

Location:

Byron, IL

Inspection Dates:

October 01, 2023 to December 31, 2023

Inspectors:

B. Bergeon, Senior Operations Engineer

N. Bolling, Project Engineer

J. Cassidy, Senior Health Physicist

A. Demeter, Resident Inspector

G. Hansen, Sr. Emergency Preparedness Inspector

R. Knutson, Illinois Emergency Management Agency

G. Roach, Senior Operations Engineer

J. Robbins, Senior Resident Inspector

A. Shaikh, Senior Reactor Inspector

Approved By:

Hironori Peterson, Chief

Reactor Projects Branch 3

Division of Operating Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Byron Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

PLANT STATUS

Unit 1 began the inspection period operating at full power. On September 16,2023, power was reduced to support replacement of a 1A reactor coolant loop flow instrument. Subsequently, the unit returned to full power. With the exception of minor reductions in power to support scheduled testing activities and load changes requested by the transmission system dispatcher, the unit remained operating at or near full power for the remainder of the inspection period.

Unit 2 began the inspection period operating at full power. With the exception of minor reductions in power to support scheduled testing activities and load changes requested by the transmission system dispatcher, the unit remained operating at or near full power until September 20, 2023. On October 9,2023, the unit was shut down. Following completion of refueling and other maintenance activities, the reactor was restarted and taken critical on October 26, 2023. The unit reached full power operation on October 29, 2023, and continued operating at or near full power for the remainder of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Seasonal Extreme Weather Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated readiness for seasonal extreme weather conditions prior to the onset of seasonal cold temperatures on November 21, 2023.

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Unit 2 A Train of the Residual Heat Removal (RH) System during Refuel Outage B2R24 on October 11, 2023
(2) Unit 2 B Train of RH System during Refuel Outage B2R24 on October 19, 2023
(3) Unit 1 Spent Fuel Pool Train during Refuel Outage B2R24 on October 24, 2023

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Storage Tank Rooms following discovery of a leaking sprinkler in the 2B Diesel Oil Storage Tank (DOST) Room, as documented in Issue Report (IR) 4706956 on October 10, 2023
(2) Units 1 and 2 Auxiliary Feedwater (AF) Pump and Day Tank Rooms following discovery of several leaking CO2 valves, as documented in various IRs on October 11, 2023
(3) Review of disposition and acceptability of ultrasonic testing measurements of fire protection piping, as documented in various IRs on October 11, 2023

71111.06 - Flood Protection Measures

Flooding Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated flooding mitigation protections in the Unit 2 Tendon Tunnel following the discovery of standing water in the tunnel, as documented in IR 4706273 on October 19, 2023.

===71111.08P - Inservice Inspection Activities (PWR) The inspectors verified that the reactor coolant system boundary, reactor vessel internals, risk-significant piping system boundaries, and containment boundary are appropriately monitored for degradation and that repairs and replacements were appropriately fabricated, examined, and accepted by reviewing the following activities from October 10 to 17, 2023.

PWR Inservice Inspection Activities Sample - Nondestructive Examination and Welding Activities (IP Section 03.01)===

The inspectors verified that the following nondestructive examination and welding activities were performed appropriately:

(1)

  • Magnetic Particle Examination of 2SX06BB Closure Plate
  • 2AF00A IST Disassembly and Inspection Welding PWR Inservice Inspection Activities Sample - Vessel Upper Head Penetration Inspection

Activities (IP Section 03.02) (1 Sample)

The inspectors verified that the licensee conducted the following vessel upper head penetration inspections and addressed any identified defects appropriately:

(1)

  • RPV Upper Head Penetrations Bare Metal Visual (BMV) Examination PWR Inservice Inspection Activities Sample - Boric Acid Corrosion Control Inspection Activities (IP Section 03.03) (1 Sample)

The inspectors verified the licensee is managing the boric acid corrosion control program through a review of the following evaluations:

(1)

71111.11 A - Licensed Operator Requalification Program and Licensed Operator Performance Requalification Examination Results (IP Section 03.03)

(1) The inspectors reviewed and evaluated the licensed operator examination failure rates for the requalification annual operating exam administered between August 15 and September 25, 2023.

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

(1) The inspectors observed and evaluated licensed operator performance in the control room during various on-watch shift crew observations including shutdown, cooldown, and Reactor Coolant System (RCS) drain down to reduced inventory for Unit 2 Refuel Outage B2R24 on October 26, 2023.

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (1 Sample)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:

(1) Maintenance effectiveness review associated with the 2 A Emergency Diesel Generator Ventilation System following the failure of a ventilation fan, as documented in IR 4714774 on November 15, 2023.

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (1 Sample)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1) Evaluation of the B2R24 Shutdown Safety Plan, as documented on September 21, 2023, on October 2, 2023.

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (5 Samples)

The inspectors evaluated the licensees justifications and actions associated with the following operability determinations and functionality assessments:

(1) Evaluation of the operability of 2RH8716B following changes in conservative uncertainties, as documented in IR 4701984 on November 14, 2023
(2) Evaluation of the operability of valve 2AF013A following issues stroking, as documented in IR 4707513 on October 6, 2023
(3) Evaluation of the operability of 2 A Diesel Generator following the failure of the vent fan, as documented in IR 4714774 on November 2, 2023
(4) Evaluation of the operability of valve 2AF005G following issues stroking, as documented in IR 477822 on October 7, 2023
(5) Evaluation of the operability of the 2B Reactor Coolant Pump following identification of noises during startup and shutdown, as documented in IR 4708074 on October 9, 2023

71111.20 - Refueling and Other Outage Activities

Refueling/Other Outage Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated refueling outage B2R24 activities from October 9 through October 26, 2023.

71111.24 - Testing and Maintenance of Equipment Important to Risk

The inspectors evaluated the following testing and maintenance activities to verify system operability and/or functionality:

Post-Maintenance Testing (PMT) (IP Section 03.01) (5 Samples)

(1) Functional and operational testing of the 2B AF Pump testing following maintenance, as documented in multiple work orders (WOs) on October 26, 2023
(2) Moveable Incore Detectors and Power Distribution Monitoring System testing following maintenance, as documented in multiple WOs on October 30, 2023
(3) Functional and operational testing of the Fuel Transfer System following load cell following maintenance, as documented in WO 5309497 on October 11, 2023
(4) Functional and operational testing of Unit 2 Containment Recirculation Sump Outlet Isolation Valve, 2SI8811B, following maintenance, as documented in WO 5126812 on October 3, 2023
(5) Functional and operational testing of the 2 A Diesel Generator Ventilation System following failure of fan 2VD01CA, as documented in WO 5414289 on November 08, 2023

Surveillance Testing (IP Section 03.01) (3 Samples)

(1) Unit 2 2B Diesel Generator (DG) Surveillance testing, as documented in multiple WOs on October 19, 2023
(2) Multiple surveillances to restore operability to the 2B AF pump, as documented in various WOs on October 26, 2023
(3) Unit Common 0 A Essential Service Water Makeup Pump Surveillance testing, as documented in WO 5415304 on November 29, 2023

Inservice Testing (IST) (IP Section 03.01) (1 Sample)

(1) Unit 2 Comprehensive Inservice Testing (IST) Requirements for Safety Injection (SI) Pumps A and B, as documented in WOs 5291695 and 5295785 on October 18, 2023

Containment Isolation Valve (CIV) Testing (IP Section 03.01) (1 Sample)

(1)2BOSR 6.1.1-25; Unit 2 Primary Containment Type B Local Leak Rate Testing of Spare Containment Penetrations, as documented in WOs 5256840 and 5256841 on October 18, 2023

71114.04 - Emergency Action Level and Emergency Plan Changes

Inspection Review (IP Section 02.01-02.03) (1 Sample)

(1) The inspectors completed an evaluation of Emergency Action Level (EAL) and Emergency Plan changes on December 18, 2023. For the inspection period from July 01, 2022, through June 30, 2023, the licensee did not make any changes to the site Emergency Plan and EAL Bases/Matrix documents. The inspectors independently reviewed the current revisions of these documents to verify no changes were completed.

This evaluation does not constitute NRC approval.

71114.06 - Drill Evaluation

Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01) (1 Sample)

(1) Technical Support and Operations Support Centers Focus Area Drill Training on December 20,

RADIATION SAFETY

71124.01 - Radiological Hazard Assessment and Exposure Controls

Contamination and Radioactive Material Control (IP Section 03.03) (2 Samples)

The inspectors observed/evaluated the following licensee processes for monitoring and controlling contamination and radioactive material:

(1) Licensee surveys of potentially contaminated material leaving the radiologically controlled area (RCA) and workers exiting the RCA at Unit 2 Contractors Access Facility during a refueling outage
(2) Workers exiting the protected area through Whole Body Monitors at the Main Access Facility 1 during a refueling outage

71124.03 - In-Plant Airborne Radioactivity Control and Mitigation

Permanent Ventilation Systems (IP Section 03.01) (1 Sample)

The inspectors evaluated the configuration of the following permanently installed ventilation systems:

(1) Fuel Handling Building Exhaust Filter Ventilation System

Self-Contained Breathing Apparatus for Emergency Use (IP Section 03.04) (1 Sample)

(1) The inspectors evaluated the licensees use and maintenance of self-contained breathing apparatuses.

71124.04 - Occupational Dose Assessment

Source Term Characterization (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated licensee performance as it pertains to radioactive source term characterization.

External Dosimetry (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated how the licensee processes, stores, and uses external dosimetry.

Special Dosimetric Situations (IP Section 03.04) (2 Samples)

The inspectors evaluated the following special dosimetric situations:

(1) Declared Pregnant Worker - EID 086635 and 9775022
(2) Use of EDEX for RWP BY-2-23-00647 CRDM Inspections

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

MS10: Cooling Water Support Systems (IP Section 02.09)===

(1) Unit 1 (October 1, 2022 through September 30, 2023)
(2) Unit 2 (October 1, 2022 through September 30, 2023)

BI02: RCS Leak Rate Sample (IP Section 02.11) (2 Samples)

(1) Unit 1 (October 1, 2022 through September 30, 2023)
(2) Unit 2 (October 1, 2022 through September 30, 2023)

71152 A - Annual Follow-up Problem Identification and Resolution Annual Follow-up of Selected Issues (Section 03.03)

The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:

(1) The inspectors performed a detailed review of various IRs pertaining to the process of scheduling, ordering, receipt, issuance, and installation of parts and equipment. An in-depth review of the barriers associated with this process flow was selected due to the inherent safety significance and quality control requirements associated with the procurement, acceptance, and use of safety related parts within the plant on December 13, 2023.
(2) The inspectors performed a detailed review of oil sample test results for each emergency diesel generator in response to recent operating experience with diesel lubricating oil contamination on December 19, 2023.

71152 S - Semiannual Trend Problem Identification and Resolution Semiannual Trend Review (Section 03.02)

(1) The inspectors reviewed the licensees corrective action program and other licensee trending programs for potential adverse trends that might be indicative of a more significant safety issue. The inspectors observed a potential trend in 0A Essential Service Water Makeup Pump trips as identified by the licensee in IR 4701152, Potential Trend in 0A Essential Service Water (SX) Makeup Pump Trips, on December 20,

INSPECTION RESULTS

Observation: Review of Oil Sample Test Results 71152A The inspectors performed a detailed review of oil sample test results in response to recent operating experience with diesel lubricating oil contamination as documented in IR 4718769, 2DG01KA (Prime Mover for the 2A Emergency Diesel Generator) Wear Metal Contamination.

Procedure MA-AA-716-230-1001, Oil Interpretation Guideline, identifies the alert range, for the Cooper Bessemer Diesels, for chromium, as > 5-10 ppm. The fault range for chromium is identified as > 10 ppm. The sample result dated November 3, 2023, indicated 13 ppm of chromium. An additional oil sample was subsequently taken and showed 7 ppm of chromium.

There is a scheduled work window for the 2DG01KA diesel in the spring of 2024. The licensee considered performing portions of this work early to address the potential concern with elevated chromium in the lubricating oil. Based on the additional oil sample test results, the license determined that it would be sufficient to monitor diesel performance, as this lower level of chromium is not expected to challenge the ability of the diesel to perform its function, until the scheduled work window arrives in the spring.

No findings or violations of NRC requirements of more than minor safety significance were identified by the inspectors in the course of this review.

Observation: Review of the Process of Scheduling, Ordering, Receipt, Issuance, and Installation of Parts and Equipment 71152A The inspectors performed a detailed review of various IRs pertaining to the process of scheduling, ordering, receipt, issuance, and installation of parts and equipment. An in-depth review of the barriers associated with these processes was selected due to the inherent safety significance and quality control requirements associated with the procurement, acceptance, and use of safety related parts within the plant.

Procedure WC-AA-101-1002, Work Scheduling, provides a process overview of the online scheduling process including guidance for support groups that participate in the online scheduling process. SM-AA-102, Warehouse Operations, establishes the process for receipt, storage, and handling material, parts, and components through the stations warehouses. The inspectors used WC-AA-101-1002 and SM-AA-102 to determine what barriers exist to prevent incorrect equipment from being installed in plant applications, then compared these to 28 issues involving incorrect parts pulled from the corrective action program (CAP). The inspectors made several observations with regards to the IRs:

  • The most common themes documented under the why did the condition happen portion of the IR were errors in human performance and changes or substitutions made by the vendor without prior notification.
  • Nine of the 28 IRs identified instances where the issue with parts was discovered at the last barrier prior to improper installation - during the execution of the work.

Despite this, the assessment of like-for-like parts at the jobsite proved successful in identifying problems with parts and documenting them in the CAP. This barrier proved to be effective even during periods of increased maintenance activities, such as during outages.

  • An additional nine of the 28 IRs documented issues where incorrect parts were discovered to have already been installed in error without the physical changes being evaluated as required by procedure SM-AA-300-1002, Bill of Material Development and Right Parts Selection for Maintenance. Evaluations performed upon discovery determined the technical changes of the incorrect parts did not change the function of the part, nor impact component/system performance.

No findings or violations of NRC requirements of more than minor safety significance were identified by the inspectors in the course of this review.

Observation: Semiannual Trend Review of IR 4701152, Potential Trend in 0A Essential Service Water (SX) Makeup Pump Trips 71152S The inspectors performed a detailed review of IRs and corrective actions associated with IR 4701152, Potential Trend in 0A Essential Service Water (SX) Makeup Pump Trips.

In short, this document identifies four trips of the 0A SX Makeup Pump that occurred between April of 2022, and September of 2023. The individual failures were documented in IRs: 4489594, 4490482, 4539770, 4687057, and 4701020.

In accordance with corrective action program requirements, the licensee performed extent of condition and cause reviews. Additionally, preventive maintenance activities and schedules were also reviewed for potential modification. Lastly, these events were reviewed for impact to licensee performance goals established as part of their Maintenance Rule program.

No findings or violations of NRC requirements of more than minor safety significance were identified by the inspectors in the course of this review.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On January 18, 2024, the inspectors presented the integrated inspection results to A. Schuerman, Plant Manager, and other members of the licensee staff.
  • On October 13, 2023, the inspectors presented the radiation protection inspection results to S. Leach, Radiation Protection Manager, and other members of the licensee staff.
  • On October 17, 2023, the inspectors presented the Inservice Inspection (ISI) Exit Meeting inspection results to P. Murray, Engineering Manager, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

4698132

Install Thermal Covers on Empty HI Storms

08/23/2023

4713603

Heaters in MSIV Rebuild Building are Not Working

10/30/2023

4714534

DCS - Heaters Not Working in Dry Cask Storage Building

11/01/2023

4714554

1SH06AQ Fan Does Not Run

11/01/2023

4714555

0SH23AJ Fan Will Not Run and Needs Cleaning

11/01/2023

4714556

0SH23AN Fan Will Not Run and Needs Cleaning

11/01/2023

4714562

0SH23AR Fan Will Not Run

11/01/2023

4714563

0SH23AG Fan Will Not Run

11/01/2023

4714678

2SH15AB Fan Would Not Start. Winter Readiness

11/02/2023

4714679

2SH15AF Fan Would Not Start. Winter Readiness

11/02/2023

4714683

2SH15AH Fan Would Not Start. Winter Readiness

11/02/2023

4714684

2SH15AJ Fan Would Not Start. Winter Readiness

11/02/2023

4714686

2SH15AL Fan Would Not Start. Winter Readiness

11/02/2023

4714687

2SH15AS Fan Would Not Start. Winter Readiness

11/02/2023

4714688

2SH15AT Fan Would Not Start. Winter Readiness

11/02/2023

4714974

Dirty SH Heater

11/03/2023

4714976

SH Area Heater Fan Not Auto Starting

11/03/2023

4714977

SH Area Heater Fan Not Running

11/03/2023

4714978

SH Area Heater Fan Not Auto Starting

11/03/2023

4714981

SH Area Heater Fan Not Auto Starting

11/03/2023

4714982

SH Area Heater Fan Not Auto Starting

11/03/2023

4714984

SH Area Heater Fan Not Auto Starting

11/03/2023

4714986

Heater ESUH-2 Inoperable

11/03/2023

4716720

Unit 1 VA Supply Filters Need Changed Out

11/10/2023

4716988

Portion of TB Louvers Missing on 451

11/11/2023

Corrective Action

Documents

4717221

Broken Louvers on 426 for Turbine Building Louver LV-6

11/13/2023

0BOSR XFT-A1

Freezing Temperature Equipment Protection SH and

Department Support Requirements

0BOSR XFT-A2

Freezing Temperature Equipment Protection Auxiliary Steam

Boilers

71111.01

Procedures

0BOSR XFT-A3

Freezing Temperature Equipment Protection Plant

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Ventilation Systems

0BOSR XFT-A4

Freezing Temperature Equipment Protection Protected Area

Buildings Ventilation Systems and Tanks

0BOSR XFT-A5

Freezing Temperature Equipment Protection Non-Protected

Area Buildings

OP-AA-108-111-

1001

Severe Weather and Natural Disaster Guidelines

SA-AA-2114

Winter Safety

WC-AA-107

Seasonal Readiness

M-135, Sheet 1B

Diagram of Reactor Coolant Loop 1

BD

M-135, Sheet 2

Diagram of Reactor Coolant Loop 2

AQ

M-135, Sheet 3

Diagram of Reactor Coolant Loop 3

AX

M-135, Sheet 4

Diagram of Reactor Coolant Loop 4

AU

M-136, Sheets 4,

5, and 6

Diagram of Safety Injection

AZ, P, and

AL

RC-14

Reactor Coolant

03/30/1981

SI-32

Safety Injection

03/30/1981

SI-34

Large Bore Isometric Safety Injection - SI

SI-34

Safety Injection

06/02/1981

SI-35

Large Bore Isometric Safety Injection - SI

SI-36

Safety Injection Containment Building Unit 2

06/18/1981

SI-40

Large Bore Isometric Safety Injection

Drawings

SI-50

Large Bore Isometric

BOP RH-E2A

Residual Heat Removal System Train A Electrical Lineup

BOP RH-M2A

Train A Residual Heat Removal System Valve Lineup

BOP SX-E2A

Essential Service Water Train A Electrical Lineup

71111.04

Procedures

BOP SX-M2A

Train A Essential Service Water System Valve Lineup

4706956

2B DOST Room has a Leaking FP Sprinkler Head

10/04/2023

4707613

Concerns Associated with License Renewal Requirements

10/06/2023

4707706

Update Required to Fire Safe Shutdown Analysis

10/06/2023

4708108

0CO022 Leaking CO2

10/09/2023

4708130

Small Sparking Observed in 2AP15E (Substation 233Y)

10/09/2023

71111.05

Corrective Action

Documents

4708133

0CO046 Leaking CO2

10/09/2023

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

4708137

0CO002 Leaking CO2

10/09/2023

4708138

0CO003 CO2 Leak

10/09/2023

4708221

0FP09AB-12 UT Inspection Results

10/09/2023

4708223

0FP11AB-12 UT Inspection Results

10/09/2023

4708245

2FP010 Dual Indication While Performing 2BOSR 3.2.9-2

10/09/2023

4708313

Fire Protection Deluge Pipe Contacting Metal Bar Over 133Y

10/09/2023

4708327

Active Track Supervisory Low Pressure Switch

Alarm 2FP07J

10/09/2023

Drawings

M-52-4

Diagram of Fire Protection

01/31/1996

Engineering

Changes

456114

Various Low Min Wall Evaluations for SX Lines for Rawwater

Program EOC Inspections and Phased Array Inspections

01/11/2023

PRE-FIRE PLAN

  1. 132 FZ 11.4-0

NORTH

Aux. Bldg. 383'-0 Elev. General Area - North

PRE-FIRE PLAN

  1. 137 FZ 11.4A

Aux. Bldg. 383'-0 Elev. Unit 1 1B Aux. Diesel Feedwater

Pump and Day Tank Room

PRE-FIRE PLAN

  1. 138 FZ 11.4A-2

AUX. BLDG. 383'-0 Elev. Unit 2 2B Aux. Diesel Feedwater

Pump and Day Tank Room

PRE-FIRE PLAN

  1. 67 FZ 8.3-2

Southwest Turbine Bldg. 401'-0 Elev. Unit 2

Turbine Bldg. - SW

PRE-FIRE PLAN

  1. 89 FZ 9.1-2, FZ

9.4-2

Aux. Bldg. 401'-0 Elev. 2B Diesel Generator & Day Tank

Room

PRE-FIRE PLAN

  1. 91 FZ 9.2-2, FZ

9.3-2

Aux. Bldg. 401'-0 Elev. 2A Diesel Generator & Day Tank

Room

PRE-FIRE PLAN

  1. 93 FZ 10.1-2

Aux. Bldg. 383'-0 Elev. 2B Diesel Fuel Oil Storage Tank

Room

Fire Plans

PRE-FIRE PLAN

  1. 95 FZ 10.2-2

Aux. Bldg. 383'-0 Elev. 2B Diesel Fuel Oil Storage Tank

Room

0BOL 10.a

LCOAR Fire Detection Instrumentation TRM LCO # 3.10.a

0BOL 10.d

LCOAR CO2 Systems TRM LCO # 3.10.d

Procedures

BOP CO-M2

Carbon Dioxide System Valve Lineup

Work Orders

1549159

Fire Protection Deluge Pipe Contacting Metal Bar Over 133Y

10/10/2023

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

298154

WR for EOC UT on 0FP11AB

10/09/2023

298161

WR for EOC UT on 0FP09AB

10/09/2023

1679989

UNIT 2 Buttress #6 Never Had a Drain Line Installed

07/09/2014

2539344

Water in Containment Buttress #6

08/09/2015

2668952

DF Side of Buttress #6 has Standing Rain Water

05/13/2016

4032391

  1. 6 Buttress West Side has ~2 Feet of Water in Bottom

07/17/2017

22434

Excessive Runtime U2 Tendon Tunnel Sump 2A

2/28/2020

Corrective Action

Documents

23445

Discovery of Free Water in Five Unit 2 Tendons

03/03/2020

Drawings

Containment Bldg. Tendon Tunnel Floor Plan

06/09/2009

Miscellaneous

RS-20-085

Submittal of Relief Request I4R-18 for Byron Station, Units 1

and 2, Concerning Containment Unbonded Post-Tensioning

System Inservice Inspection Requirements

07/24/2020

Procedures

BOP TF-108

Pumping Tendon Tunnel Sump with Temporary Sump

Pumps

1548513

Standing Water in U2 Tendon Tunnel

10/02/2023

71111.06

Work Orders

5143028

Standing Water in The U-1 Tendon Tunnel

03/27/2023

04501664

Active Boric Acid Leak on 2FI-0631 Threaded Fittings

05/24/2022

04506666

Active Boric Acid Leakage from Flange Upstream of 2SI077

06/21/2022

04666344

2CV8516 Cation Inlet Isolation Leak

03/31/2023

Corrective Action

Documents

04678585

Inactive Boric Acid Leak on 2CS01AA-16" Bolted Flange

05/16/2023

04708911

NRC ID: Inadequate Evaluation on 2FE-0136 Bolting

10/11/2023

Corrective Action

Documents

Resulting from

Inspection

04709467

NRC ID: Incorrect Methodology for 2SIE8A-2" Active

Leakage

10/13/2023

B2R24-MT-001

Magnetic Particle Examination on 2SX06BB-16"

10/13/2023

B2R24-PT-001

Liquid Penetrant Examination on RPV Head Penetration

No. 68

10/14/2023

B2R24-PT-002

Liquid Penetrant Examination on RPV Head Penetration

No. 6

10/14/2023

B2R24-UT-002

Ultrasonic Examination on 2RC14AD-2 Zone 6

10/11/2023

NDE Reports

B2R24-VEN-001

RPV Head Surface and Penetrations Bare Metal Visual

Examination

10/16/2023

71111.08P

Procedures

ER-AA-335-002

Liquid Penetrant (PT) Examination

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

ER-AA-335-003

Magnetic Particle (MT) Examination

ER-AA-335-031

Ultrasonic Examination of Austenitic Piping Welds

ER-AP-335-001

Bare Metal Visual Examination of Nickle Alloy Materials

Work Orders

05091593-10

IST Disassembly and Inspection Welding on 2AF00A

2BGP 100-3

Power Ascension

105

BOP FC-6

Shutdown Of A Purification Loop For The Refueling Cavity

BOP RC-1

Startup of A Reactor Coolant Pump

BOP RC-10b

Draining an Isolated Reactor Coolant Loop for Unit 2

BOP RC-4

Reactor Coolant System Drain

BOP RE-5

Inerting the RCDT

BOP SI-23

Raising SI Accumulator Level in Mode 4, 5, or 6

71111.11Q

Procedures

BOSR 0.1-5

Unit Two Mode 5 Shiftly and Daily Operating Surveillance

27465

Issues Identified on 1VD01CA Fan During DG Work

Window

06/03/2009

252529

2A DG Vent Fan Failed to Start During 2BOSR 8.1.2-1

08/17/2011

1567369

PI&R 2A DG Operability Concern

09/26/2013

4714774

Low dP Alarm on 2A DG Vent Fan

11/02/2023

4716165

EOC Work Due to DG Vent Fan Failure

11/08/2023

4716167

EOC Work Due to DG Vent Fan Failure

11/08/2023

Corrective Action

Documents

4716168

EOC Work Due to DG Vent Fan Failure

11/08/2023

BOP DG-11T2

Diesel Generator Operating Log

BOP VD-5

DG Room Ventilation System Operation

BOP VD-6

Emergency Restoration of the DG Room Ventilation System

ER-AA-20

Equipment Reliability Program Description

ER-AA-200

Preventive Maintenance Program

ER-AA-200-1001

Equipment Classification

ER-AA-2002

System And Equipment Health Monitoring

ER-AA-2003

System And Equipment Health Monitoring

ER-AA-310-1002

Maintenance Rule Functions - Safety Significance

Classification

ER-AA-320

Maintenance Rule Implementation per NEI 18-10

MA-AA-716-230

Predictive Maintenance Program

71111.12

Procedures

MA-AA-736-600

Torquing and Tightening of Bolted Connections

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.13

Miscellaneous

PORC Mtg: 23-

20

B2R24 Shutdown Safety Plan

09/21/2023

4540295

NRC-ID: 1CC685 Limit Control Scheme

2/01/2022

4540308

NRC IDd 2RY8000B Vale Factor Discrepancy

2/01/2022

4541139

NRC ID - POV Inspection Valve Factor Application

2/06/2022

4541231

NRC ID - Byron MOV Program Valve Factor Discrepancies

2/06/2022

4701984

2RH8716B Options for Diagnostic Testing in B2R24

09/12/2023

4707513

2AF013A Issues During Valve Stroke in The Open Direction

10/06/2023

4707822

2AF005G Appeared to Not Fully Close Locally

10/07/2023

Corrective Action

Documents

4708074

2B Reactor Coolant Pump Abnormal Noises on Shutdown

10/09/2023

ER-AA-302-1001

MOV Rising Stem Motor Operated Valve Thrust and Torque

Sizing and Set-Up Window Determination Methodology

Procedures

ER-AA-302-1006

Motor-Operated Valve Maintenance and Testing Guideline

1632009

MOV PM, Actuator Inspection, Diagnostic Testing

10/07/2014

71111.15

Work Orders

250359

PM Inspection, In-Service Diag Test, PIT

10/14/2023

4709459

2RC8003C has the Wrong Gear in it

10/13/2023

Corrective Action

Documents

4709630

Security - Fatigue Assessment

10/14/2023

2BGP 100-2

Plant Startup

2BGP 100-2A1

Reactor Startup

2BGP 100-3

Power Ascension

105

2BGP 100-3T2

Mode 2 to 1 Checklist

OP-AA-106-101-

1006

Operational Decision Making (ODM) Process

OU-AA-101

Refuel Outage Management

71111.20

Procedures

OU-AP-104

Shutdown Safety Management Program Byron/Braidwood

Annex

4377305

2PS9356B Doesnt Stroke Fully Open Following

Maintenance

10/17/2020

4377380

2PS9356B is not Operable

10/17/2020

4403064

MOV 2SI8811B Actuator Grease at Grade 3

2/17/2021

4418017

2E Incore Withdrawn Limit Switch Issue

04/21/2021

4465875

2E Incore Withdrawn Limit Switch Failed PMT

2/10/2021

71111.24

Corrective Action

Documents

4495518

B2R23 2PS9356B Failed as Left LLRT

04/25/2022

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

4497046

2PS9356B Requires New Solenoid REF WO 5089242-06

05/02/2022

4701152

Potential Trend in 0A SX Makeup Pump Trips.

09/08/2023

4701868

0A SX Makeup Pump Battery Charger Would Not Go on

Equalize.

09/11/2023

4709604

2B AF Pump Diesel Driver Cylinder and Piston Degradation

10/14/2023

4710010

2PS9356B Failed As-Found LLRT at 36.6 SCFH

10/16/2023

4711043

CeramAlloy Repairs Needed on 2B AF HX

10/19/2023

4712979

2E Withdraw Limit Still Not Making Up

10/27/2023

4714774

Low dP Alarm on 2A DG Vent Fan

11/02/2023

20421

Unexpected Alarm SX Makeup Pump Auto Start

11/29/2023

Miscellaneous

  1. 20-023

PORC Meeting Minutes for ER-AA-380 Appendix J Leakage

Discussions

10/19/2020

2BGP 100-1T3

Mode 4 to 3 Checklist

2BOSR 0.5-

2.SI.2-4

Unit Two 2SI8801A and 2SI8801B Stroke Time and Position

Indication Test

2BOSR 1.6.1-1

Unit Two Predicted Critical Control Rod Position Surveillance

2BOSR

5.5.8.AF.5-2a

Unit Two Group A Inservice Testing (IST) Requirements for

the Diesel Driven Auxiliary Feedwater Pump 2AF01PB

2BOSR

5.5.8.AF.5-2b

Unit Two Group B Inservice Testing (IST) Requirements for

Diesel Driven Auxiliary Feedwater Pump 2AF01PB

2BOSR

5.5.8.SI.5-1c

Unit Two Comprehensive Inservice Testing (IST)

Requirements for Safety Injection Pump 2SI01PA

2BOSR 6.1.1-25

Unit Two Primary Containment Type B Local Leakage Rate

Test of Spare Containment Penetrations

2BOSR 7.5.4-2

7.5.4-2 Unit Two Diesel Driven Auxiliary Feedwater Pump

Monthly Surveillance

2BOSR 7.5.7-2

Unit Two Train B Auxiliary Feedwater Flowpath Operability

Surveillance Following Shutdown

2BOSR 8.1.11-2

Unit Two 2B Diesel Generator Sequencer Test

2BOSR 8.1.17-2

Unit Two 2B Diesel Generator SI Signal Override Test

2BOSR Z.7.a.1

Unit Two Auxiliary Feedwater Diesel Engine Starting

Sequence and Overspeed Trip Test

Procedures

2BVSR 3.a.1-1

Unit Two Moveable Incore Detectors Operability Check

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

2BVSR 6.1.1-24

Unit 2 Summation of Primary Containment Type B & C

Local Leakage Tests for Acceptance Criteria

BMP 3203-1

Preventive Maintenance of Auxiliary Feedwater Pump Diesel

Drive Unit

BOP AF-1

Diesel Driven Aux Feedwater Pump Alignment to Standby

Condition

BOP AF-7

Diesel Driven Auxiliary Feedwater Pump B Startup on Recirc

BOP AP-32

Synchronizing A SAT to A Bus Being Fed by A DG

BOP CD/CB-3

Condensate/Condensate Booker System Fill and Vent

BOP DG-1

Unit One/Two Diesel Generator Alignment to Standby

Condition

BOP DG-11

Diesel Generator Startup

BOP IC-3

Moveable Incore Detectors Flux Mapping Procedure

BOP IC-7

Moveable Incore Detector Operation

BOP RH-6

Operation of the RH System in Shutdown Cooling

BOP SI-1

Safety Injection System Startup

BVP 500-31

Moveable Incore Detectors Core Limit Alignment Procedure

BVP 800-39

Byron Containment Leakage Rate Testing Program

CC-AA-201

Plant Barrier Control Program

CC-AA-201-F-01

Plant Barrier Impairment Permit 23-199

NF-AP-546

Power Distribution Monitoring System Calibration

OU-AP-214,

Byron Station Transfer System Winch Load Cell Calibration

1339886

Replace Live Load Packing Belleville Washers on 2AF004B

10/22/2023

1342621

OPS - Post Maintenance Testing - STT/PIT 2SI8811B

10/03/2023

1344261

Work Request Needed for Grease in 2SI8811B

10/03/2023

1782794

AF Diesel Flywheel Inspection (Non-Intrusive)

10/25/2023

1782795

Replace AF Diesel Fuel Injectors

10/25/2023

1782795

Replace AF Diesel Fuel Injectors

10/20/2023

1914932

Rebuild Actuator, Replace Regulators / Replace Elastomers

10/17/2020

4956020

Replace AF PP/Gearbox Lube Oil System Relief Valve

10/20/2023

5088095

Failed PMT on 2SX176

10/20/2023

Work Orders

5088844

Flowscan Valve 2SX168

10/19/2023

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

5089242

2PS9356B Doesnt Stroke Fully Open Following

Maintenance

04/25/2022

26812

Inspect Motor Pinion Gear for Correct Size

10/03/2023

250145

2B Diesel Generator SI Signal Override Test

10/17/2023

250147

2B Diesel Generator Sequencer Test

10/18/2023

250154

2AF014G IST Disassembly and Inspection

10/25/2023

250156

AF Diesel Turbocharger Inspection

10/25/2023

250157

PM for AF Diesel

10/25/2023

250158

Change Grease in Couplings (2) per BMP 3229-1 Section

10/20/2023

250219

2B AF Valve Emergency Actuation Signal Verification Test

10/24/2023

250486

Replacement of the Fuel Shutoff Solenoid

10/25/2023

252245

2A/B Stagger - AF VLV Emerg ACT SIG Test

10/24/2023

256840

As Found LLRT of Spare CNMT Penetrations P-74

10/17/2023

256841

LLRT for P-64 - Spare

10/17/2023

258572

Aux Feedwater Diesel Prime Mover Inspection Schedule

10/25/2023

260502

MIDS Operability Check (Full Power Plateau)

10/27/2023

260503

MIDS Operability Check (Low Power Plateau)

10/29/2023

260507

Inspect 10 Path Transfer Unit & Plungers

10/27/2023

260819

Axial Flux Difference Single Point Calibration (>15% T)

10/27/2023

260982

AF004B Requires Packing Retorque in 1 Year or

Refuel Cycle

10/24/2023

267996

LR-2AF01AB - HX Inspection per Generic Letter 89-13

10/25/2023

267997

Replace Actuators with Refurbished Spare

10/22/2023

270811

LR-2SX02K - HX Inspection per Generic Letter 89-13

10/25/2023

270814

LR-2AF02A - HX Inspection per Generic Letter 89-13

10/25/2023

275678

2B AF Diesel Driven Pump Flexible Hoses Replacement

10/25/2023

291695

2SI01PA Comprehensive IST RQMTS for Safety Injection

Pump

10/11/2023

295785

2SI01PB Comprehensive IST Rqmts for Safety Injection

Pump

10/11/2023

5303074

ECCS Subsystem Automatic Valve Actuation Test

10/03/20203

5306202

Diesel Driven AF PP Insp to Support 2BVSR Z.7.A.1

10/21/2023

5308035

Change Actuator on 2AF004B to CAT ID 01443459

10/24/2023

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

EC 636842

5309497

EWP IM Support RXS with Emergent Issues During

Fuel Moves

10/11/2023

5315794

AF Diesel Rocker Covers, Exhaust Maniforlds, and

Insulation

10/25/2023

5405605

0SX02PA Comprehensive IST Requirements for SX Makeup

Pump

11/29/2023

5406818

(NEIL) - 2B Diesel Driven AF Pump Monthly Surveillance

10/25/2023

5406844

Quadrant Power Tilt Ratio Calculation

10/30/2023

5406845

Axial Flux Difference Surveillance

10/30/2023

5414289

Low dP Alarm on 2A DG Vent Fan

11/08/2023

5415304

LR - 0A SX Makeup Pump Operability Surveillance

11/29/2023

21566

URI Shift Dose Assessment Training - Improper Scenarios

2/05/2023

22338

4Q2023 Unannounced Call-In Augmentation Drill Results

2/07/2023

23288

Byron Station Core Damage Assessment (CDAM)

Drill 12-13-23

2/13/2023

23545

Cal Expiring on EP Van Inventory

2/14/2023

Corrective Action

Documents

24510

TSC/OSC Audio Issues

2/19/2023

EP-AA-10

Emergency Preparedness Program Description

EP-AA-1002

Radiological Emergency Plan Annex for Byron Station

EP-AA-1002

Addendum 3

Emergency Action Levels for Byron Station

EP-AA-11

Operating Stations Emergency Preparedness Process

Description

EP-AA-110

Assessment of Emergencies

EP-AA-1101

EP Fundamentals

EP-AA-1102

ERO Fundamentals

EP-AA-112

Emergency Response Organization (ERO)/Emergency

Response Facility (ERF) Activation and Operation

EP-AA-112-200

TSC Activation and Operation

EP-AA-112-300

Operations Support Center Activation and Operation

71114.06

Procedures

EP-AA-112-300-

F16

OSC Staff Guidelines

A

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

EP-AA-115

Termination and Recovery

EP-AA-120

Emergency Plan Administration

EP-AA-122

Drills and Exercise Program

EP-AA-122-100

Drill and Exercise Planning and Scheduling

EP-AA-122-200

Drill and Exercise Execution

EP-AA-122-300

Drill and Exercise Evaluation

EP-AA-125

Emergency Preparedness Self Evaluation Process

EP-BY-1000

Byron Station Radiological Emergency Plan

71124.01

Corrective Action

Documents

Resulting from

Inspection

04709260

Procedure Revision Needed RP-BY-1003

10/13/2023

Checklist #:

2.12.2200.87

Respiratory SAR and SPR Monthly Checklist

07/28/2023

Checklist #:

2.12.2200.87

Respiratory SAR and SPR Monthly Checklist

09/28/2023

Respiratory SAR

and SPR Monthly

Checklist

Respiratory SAR and SPR Monthly Checklist

06/09/2023

S/N LA059454

Posi3 USB Test Results - Complete SCBA Test

07/19/2023

S/N LAG059463

Posi3 USB Test Results - Complete SCBA Test

07/20/2023

S/N LAG59457

Posi3 USB Test Results - Complete SCBA Test

07/18/2023

Miscellaneous

TRM Appendix K

Ventilation Filter Testing Program

RP-AA-825

Maintenance, Care and Inspection of Respiratory Protective

Equipment

RP-AA-825-101

Monthly Inspection and Maintenance of MSA FireHawk

Mask Mounted Regulator SCBAs

Procedures

RP-BY-825-1003

MSA FireHawk M7 Air Mask Self-Contained Breathing

Apparatus (SCBA) and Quarterly Breathing Air Testing

71124.03

Work Orders

05404427 01

Charcoal Adsorber 720 Hour Check

10/05/2023

BYR-23-001

23 Bioassay Program Annual Review at Byron Nuclear

Power Station

03/15/2023

71124.04

Miscellaneous

RP-AA-302

Unit 1 Alpha Area Level Assessment

05/26/2023

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

RP-AA-302

Unit 2 Alpha Area Level Assessment

06/22/2022

05045238 01

0A Fuel Handling Building Exhaust Ventilation System

Carbon

2/04/2020

05125798 01

0A Fuel Handling Building Exhaust Ventilation System

Carbon

2/09/2021

Work Orders

269152 01

0A Fuel Handling Building Exhaust Ventilation System

Carbon

06/08/2023

22870

0FP03PB Crankcase Breather Installed Without Evaluation

05/11/2021

25714

Parts Not Available for Scheduled Work due to

Obsolescence

05/26/2021

27571

Part Not Available for Scheduled Work - Vendor Lead Time

06/04/2021

4432445

Incorrect O-Ring Material Installed

06/30/2021

4445949

1CV01FA - 1A CV Seal Injection Filter not

Reserved/Available

09/13/2021

4448192

Snubber Changed DRS for CID 1396543, 1033720, and

26368

09/23/2021

4494037

Incorrect Replacement Part Ordered for Troubleshooting

04/19/2022

4495760

Incorrect Heat Exchangers Reserved for Work

04/26/2022

4496678

Rebuild Kit Not Compatible with 2AF004B Actuator

04/26/2022

24190

Cat ID 318514 Installed Without Evaluation

09/23/2022

4532749

New Firing Board CID 5704-1 Unexpected Configuration

10/27/2022

4532996

EC 635940 Install Milestone Missed - Parts Not Ordered

10/19/2022

4533917

Replacement Main Plug Installed Without Evaluation

11/01/2022

4543088

0CW216B and 0CW217B Replacement Installed Opposite

2/15/2022

4545606

Incorrect Batteries for FLEX Tractors

2/30/2022

4558412

Material Not Available for WO Execution

03/01/2023

4561752

1RH8701B Rotation Check Unsat

03/14/2023

4671933

Bolting Issue for SXCT Windows

04/21/2023

4688482

Replacement Wear Rings Installed Without Evaluation

07/03/2023

4690368

1SI8812B Motor Mounting Bolts Not Long Enough

07/12/2023

4701738

2SI8808C B2R24 Replacement Motor Not Like for Like

09/11/2023

71152A

Corrective Action

Documents

4701952

1RH8701B - Installed Motor Constructed Using Alum vs

09/12/2023

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Magn

4709459

2RC8003C has the Wrong Gear in It

10/13/2023

4709463

APS - 2RD01E MG Set Motor Lead Box Does Not Align

10/13/2023

4709558

APS Expanded Scope - 2AS162 Vlv Internal Build Up

10/14/2023

4709601

Incorrect Parts Stocked in Stores

10/14/2023

4709918

Unit 2 Refuel Machine Main Hoist Wire Rope Issue

10/16/2023

4709934

Incorrect POT Fuses Identified in Model Work Order

10/16/2023

4715992

Question on Configuration of New Actuators

11/06/2023

4716756

NRC ID: 2B DG Oil Leak from Cylinder 2R

11/09/2023

4718769

2DG01KA Wear Metal Contamination

11/20/2023

20552

Supply Ops - BYR WH Ops Assessment Report Action

Required

11/29/2023

21377

2A EDG Low Cylinder Peak Firing Pressure - 1L

2/04/2023

21470

Fuel Dilution in 2AF01PB-K Diesel Engine is in Alert Range

2/04/2023

22225

2B AF Diesel Crankcase Confirmatory Oil Sample Results

2/07/2023

F2372 Volume 1

Vendor Technical Manual - Cooper Energy Services Diesel

Engine Generator

Miscellaneous

Various

Lube Oil Sample Results for Each of the Emergency Diesel

Generators from July 2022 thru November of 2023

MA-AA-716-230-

1001

Oil Analysis Interpretation Guideline

MA-AA-716-230-

1004

Lubricant Sampling Guideline

SM-AA-102

Warehouse Operations

SM-AA-300-1002

Bill of Material Development and Right Parts selection for

Maintenance

SM-AA-404

Nuclear Material Procurement

Procedures

WC-AA-101-1002

On-Line Scheduling Process

4489594

0A SX M/U Pump Fuel Oil Filter Bullseye Air Bubble

04/01/2022

4490482

0A SX Makeup Pump Trip

04/05/2022

4539770

0A SX Makeup Pump Trip

11/30/2022

4687057

0A SX Makeup Pump Trip

06/27/2023

71152S

Corrective Action

Documents

4701020

0A SX Makeup Pump Trip

09/07/2023

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

ER-AA-320

Maintenance Rule Implementation Per NEI 18-10

Procedures

PI-AA-125

Corrective Action Program Procedure

8