IR 05000456/2023010
| ML23286A014 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 10/18/2023 |
| From: | Karla Stoedter NRC/RGN-III/DORS/RPB3 |
| To: | Rhoades D Constellation Energy Generation, Constellation Nuclear |
| References | |
| IR 2023010 | |
| Download: ML23286A014 (1) | |
Text
SUBJECT:
BRAIDWOOD STATION - FUNCTIONAL ENGINEERING INSPECTION - COMMERCIAL GRADE DEDICATION REPORT 05000456/2023010 AND 05000457/2023010
Dear David Rhoades:
On September 29, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Braidwood Station and discussed the results of this inspection with James Petty, Plant Manager, and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Karla K. Stoedter, Chief Engineering Branch 1 Division of Operating Reactor Safety Docket Nos. 05000456 and 05000457 License Nos. NPF-72 and NPF-77
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000456 and 05000457
License Numbers:
Report Numbers:
05000456/2023010 and 05000457/2023010
Enterprise Identifier:
I-2023-010-0046
Licensee:
Constellation Energy Generation, LLC
Facility:
Braidwood Station
Location:
Braceville, IL
Inspection Dates:
August 14, 2023 to September 29, 2023
Inspectors:
Benny Jose, Senior Reactor Inspector (Team Member)
Joon Park, Reactor Inspector (Team Lead)
Thomas Hartman, Senior Project Engineer (Observer)
Eucherius Rosario, Reactor Inspector (Team Member)
Approved By:
Karla K. Stoedter, Chief
Engineering Branch 1
Division of Operating Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Functional Engineering Inspection - Commercial Grade Dedication at Braidwood Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.21N.03 - Commercial Grade Dedication Commercial Grade Dedication (section 03.01)
The inspectors reviewed the implementation of the licensees processes for dedicating commercial-grade items/services as basic components and/or for procuring safety-related structures, systems, and components for the following samples:
(1)5631-2, Diode, Rectifier, Rated Current 150 AMPS, Repetitive Peak Reverse Voltage 800 V (Commercial Grade Item (CGI) Dedication)
(2)9329-2, Differential Pressure Switch, 5 AMPS, 125 VAC, 0 - 6.0 in. Water Column, 1/4" NPT (CGI Dedication)
(3)18910-2, Instrument Valve, 1/2", Carbon Steel, 2500 PSI, Socketweld Ends, A-105 (CGI Dedication)
(4)19304-1, Reactor Vessel Closure Stud, 7", Material SA-540, Gr. B23, Class 3, Mark No. 89-1 (Safety Related (SR) Procurement)
(5)19819-2, Secondary Filter Element for Fuel Filter Assembly (CGI Dedication)
(6)26440-2, Grayloc Seal Ring, Size 25, AISI 630, 0.2% Max. Cobalt, Neolube #1 (CGI Dedication)
(7)28165-1, Time Delay Relay, 125 VDC, 0.5 AMP, DPDT, 20 to 200 Seconds, with Off-Delay Operation (SR Procurement)
(8)34379-1, Molded Case Circuit Breaker, 150 AMP, 600 VAC, Three Pole (SR Procurement)
(9)35718-2, Valve Positioner, Type H/FR, Two-Stage, 150 PSIG, BUNA-N Diaphragm (CGI Dedication)
(10)42896-2, Valve Rebuilt/Repair Kit, Includes Two Seats, Two Seat Rings, Two Stem Seals and One Cover Gasket (CGI Dedication)
(11)770091-2, Strainer Element, Spare Parts for 36" VDWS-118 R.P. Adams Strainer (CGI Dedication)
(12)1236238-2, Pressure Transmitter, 1-100 PSI Input, 1-5 VDC Signal Output, 10-35 VDC Power Requirement (CGI Dedication)
(13)1400115-1, Hydranut Assembly, 1 3/8" x 8" TPI UN, SA-453, Gr. 660, Class A or B (SR Procurement)
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On September 29, 2023, the inspectors presented the Functional Engineering Inspection - Commercial Grade Dedication results to James Petty, Plant Manager, and other members of the licensee staff.
- On September 1, 2023, the inspectors presented the initial Functional Engineering Inspection - Commercial Grade Dedication inspection results to Greg Gugle, Site Vice President, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Calculations
E.M. 7121
Analysis of Hydranuts for Braidwood Pressurizer Safety
Valve Inlet and Outlet Flanges
Corrective Action
Documents
105700
Replacement Secondary Fuel Oil Filter Not "Like-for-Like"
04/28/2002
4699141
NRC ID: Piping Support 2SX71016X Near 2SX178 is
Misaligned
08/29/2023
4699480
NRC ID: Dedication of Ball Valve Rebuilt Kit
08/30/2023
4699959
09/01/2023
Corrective Action
Documents
Resulting from
Inspection
4705579
09/28/2023
337149
Temporary Configuration Change Package to Add
Parameter Monitoring Devices to 1B Auxiliary Feed Water
(AFW) Pump
351459
Design Report Review for Alternate Non-Standard Nuts on
the Inlet and Outlet Flanges of the Pressurizer Safety
Valves
Engineering
Changes
2609
Add a Number of Parameter Monitoring Devices to the
Unit 1 B Diesel Driven AFW Pump to Monitor Diesel
Performance
15127
Parts Evaluation for 42896-2, Valve Repair Kit
2/14/2002
18022
CGD Evaluation for 1236238-2, Pressure Transmitter
07/12/2002
203432
Parts Evaluation for 18910-2, Instrument Valve
06/27/2017
213407
Parts Evaluation for 19819-2, Secondary Filter Element
04/11/2018
20829
Parts Evaluation for 35718-2, Valve Positioner
08/22/2018
2564
Parts Evaluation for 26440-2, Seal Ring
03/19/2003
27339
Parts Evaluation for 26440-2, Seal Ring
11/07/2003
280873
Parts Evaluation for 18910-2, Instrument Valve
04/27/2023
283121
Parts Evaluation for 770091-2, Strainer Element
06/29/2023
39940
Part Evaluation for 5631-2, Diode Rectifier
05/05/2005
64650
Parts Evaluation for 1400115-1, Hydranut Assembly
2/16/2009
64653
Parts Evaluation for 1400115-1, Hydranut Assembly
2/16/2009
64891
Parts Evaluation for 19819-2, Secondary Filter Element
03/09/2009
71111.21N.03
Engineering
Evaluations
88442
Parts Evaluation for 18910-2, Instrument Valve
04/30/2015
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
2774
Parts Evaluation for 19304-1, Reactor Vessel Closure
Stud
03/02/2016
A-91-003-0207-
Parts Evaluation for 19304-1, Reactor Vessel Closure
Stud
10/30/1991
M-1993-0121-
001
Parts Evaluation for 42896-2, Valve Repair Kit
09/19/1997
1081000
Purchase Order for 19819-2, Secondary Filter Element
11188
Purchase Order for 1236238-2, Pressure Transmitter
08/19/2002
27051
Receipt Inspection Package for 1400115-1, Hydranut
Assembly
04/04/2017
230857
Receipt Inspection Package for 42896-2, Valve Repair Kit
09/02/2017
235674
Receipt Inspection Package for 5631-2, Diode Rectifier
03/10/2018
238381
Receipt Inspection Package for 19819-2, Secondary Filter
Element
05/29/2018
238919
Receipt Inspection for 9329-2, Differential Pressure Switch
06/13/2018
240927
Receipt Inspection Package for 35718-2, Valve Positioner
09/22/2018
243859
Receipt Inspection Package for 28165-1, Time Delay
Relay
01/09/2019
245400
Receipt Inspection Package for 18910-2, Instrument Valve
03/28/2019
254356
Receipt Inspection Package for 26440-2, Seal Ring
2/21/2020
255805
Receipt Inspection Package for 19304-1, Reactor Vessel
Closure Stud
03/19/2020
258129
Receipt Inspection Package for 34379-1, Molded Case
Circuit Breaker (MCCB)
05/28/2020
268420
Receipt Inspection for 770091-2, Element Strainer
10/20/2021
588401
Purchase Order for 5631-2, Diode Rectifier
604856
Purchase Order for 1400115-1, Hydranut Assembly
618004
Purchase Order for 42896-2, Valve Repair Kit
653875
Purchase Order for Differential Pressure Switch 9329-2
06/15/2018
664573
Purchase Order for 35718-2, Valve Positioner
67494
Receipt Inspection Package for 1236238-2, Pressure
Transmitter
08/26/2002
Miscellaneous
67949
Exelon Power Labs Test Report for 1236238-2, Pressure
09/11/2002
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Transmitter
680798
Purchase Order for 18910-2, Instrument Valve
688729
Purchase Order for 19304-1, Reactor Vessel Closure Stud
710152
Purchase Order for 26440-2, Seal Ring
790121
Purchase Order for 34379-1, MCCB
05/22/2020
25106
Purchase Order for 770091-2, Element Strainer
BRW-47277
Exelon Power Labs Test Report on 34379-1, MCCB
06/03/2020
BRW-08229
Commercial Grade Dedication (CGD) Requirements for
29-2, Differential Pressure Switch
06/28/2018
BRW-5501
Exelon Power Labs Test Report on 28165-1, Agastat Time
Delay Relay
2/14/2019
Project Number
BRW- 08229
Exelon Power Labs CGD Test Report for 9329-2,
Differential Pressure Switch
06/26/2018
BwMP 3300-075
Reactor Vessel Level Indicating System Flange Assembly
and Disassembly
Approved Supplier Qualification Activities
Commercial Grade Surveys
Operating Experience Program
Processing of Level 3 OPEX Evaluations
Warehouse Operations
Procurement Engineering Support Activities
Procedures
Procurement Engineering Process and Responsibilities
04605041-02
Perform a Functional Run of 1VD03CA, Verify Proper
Operation
2/14/2018
04861604
Reactor Vessel Disassembly/Reassembly
04/13/2020
05198651-01
Replace Transmitter 2PTAF109
10/26/2021
Work Orders
4612416-01
MM - Valve 2SX2077A Rebuild Valve
2/04/2020