IR 05000454/2023501
| ML23234A077 | |
| Person / Time | |
|---|---|
| Site: | Byron |
| Issue date: | 08/31/2023 |
| From: | Steven Orth NRC/RGN-III/DRSS |
| To: | Rhoades D Constellation Energy Generation, Constellation Nuclear |
| References | |
| IR 2023501 | |
| Download: ML23234A077 (1) | |
Text
SUBJECT:
BYRON GENERATING STATION - EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000454/2023501 AND 05000455/2023501
Dear David Rhoades:
On July 28, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Byron Generating Station and discussed the results of this inspection with Adam Schuerman, Plant Manager, and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
August 31, 2023 This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Steven K. Orth, Chief Security, Emergency Preparedness, and Incident Response Branch Division of Radiological Safety and Security Docket Nos. 05000454 and 05000455 License Nos. NPF-37 and NPF-66
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000454 and 05000455
License Numbers:
Report Numbers:
05000454/2023501 and 05000455/2023501
Enterprise Identifier:
I-2023-501-0009
Licensee:
Constellation Nuclear
Facility:
Byron Generating Station
Location:
Byron, IL
Inspection Dates:
July 24, 2023 to July 28, 2023
Inspectors:
L. Cender, Health Physicist
G. Hansen, Sr. Emergency Preparedness Inspector
J. Kutlesa, Emergency Preparedness Inspector
E. Rosario, Reactor Inspector
E. Sanchez Santiago, Senior Project Engineer
Approved By:
Steven K. Orth, Chief
Security, Emergency Preparedness, and Incident
Response Branch
Division of Radiological Safety and Security
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an emergency preparedness biennial exercise inspection at Byron Generating Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71114.07 - Exercise Evaluation - Hostile Action (HA) Event
Inspection Review (IP Section 02.01 - 02.11) (1 Sample)
- (1) The inspectors observed the biennial hostile action event exercise and evaluated emergency plan performance on July 25, 2023. The exercise scenario simulated an event at the Byron Generating Station that initiated with the declaration and notification of an Alert in response to a simulated potential airborne attack threat within 30 minutes of the site. The scenario conditions simulated the escalation of the significance of the event, requiring the declaration of a Site Area Emergency, and then a General Emergency, as well as the development of Protective Action Recommendations that were communicated to the required state and local government agencies.
71114.08 - Exercise Evaluation - Scenario Review
Inspection Review (IP Section 02.01 - 02.04) (1 Sample)
- (1) The inspectors reviewed and evaluated the proposed scenario for biennial emergency plan exercise on June 21,
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
EP01: Drill/Exercise Performance (DEP) Sample (IP Section 02.12)===
- (1) July 1, 2022 through June 1, 2023.
EP02: Emergency Response Organization (ERO) Drill Participation (IP Section 02.13) (1 Sample)
- (1) July 1, 2022 through June 1, 2023.
EP03: Alert And Notification System (ANS) Reliability Sample (IP Section 02.14) (1 Sample)
- (1) July 1, 2022 through June 1,
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
On July 28, 2023, the inspectors presented the emergency preparedness biennial exercise inspection results to Adam Schuerman, Plant Manager, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
23 NRC Graded Byron HAB
07/27/2023
Corrective Action
Documents
Resulting from
Inspection
NRC ID: Incorrect ENS Form Notification Time
08/03/2023
2nd Quarter 2021 Performance Indicator Drill Evaluation
Report
07/01/2021
Byron 4Q2021 Focused Area Drill Evaluation Report
10/26/2021
Byron 2Q2022 Focus Area Drill Evaluation Report
04/05/2022
Byron 2022 Off-Year Exercise Evaluation Report
09/20/2020
Byron Health Physics and First Aid Drill Evaluation Report
11/03/2022
Byron Station 2022 Medical / Health Physics Drill Evaluation
Report
06/01/2022
Byron Core Damage Assessment Drill Report
03/01/2023
Emergency Preparedness Tabletop Drill Report
03/02/2023
Miscellaneous
Emergency Preparedness TSC Focus Area Drill Report
06/23/2023
Radiological Emergency Plan Annex for Byron Station
Rev 37
Addendum 3
Emergency Action Levels for Byron Station
Rev 6
Procedures
Byron Station Radiological Emergency Plan
Rev 0
Correction Required for Byron 2021 NRC Exercise Report
08/23/2021
Corrective Action
Documents
Drill Material Distribution Not Compliant with EP-AA-122-100
03/24/2022
Miscellaneous
23 Byron HAB
23 Byron Station NRC Evaluated Hostile Action Based
Exercise
07/25/2023
71151
Procedures
LS-AA 2130
Monthly Data Elements for NRC ROP Indicator - Alert and
Notification System (ANS) Reliability
07/2022
through
06/2023
Monthly Data Elements for NRC ROP Indicator - Emergency
Response Organization (ERO) Drill Participation
07/2022
through
06/2023
71151
Procedures
Monthly Data Elements for NRC ROP Indicator -
Drill/Exercise Performance
07/2022
through
06/2023