SUBJECT:
BRAIDWOOD STATION - SECURITY BASELINE INSPECTION REPORT 05000456/2023402 AND 05000457/2023402
Dear David Rhoades:
On November 3, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Braidwood Station and discussed the results of this inspection with Christopher Abbott and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Michael E. Ziolkowski, Chief Security, Emergency Preparedness, and Incident Response Branch Division of Radiological Safety and Security Docket Nos. 05000456 and 05000457 License Nos. NPF-72 and NPF-77
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000456 and 05000457
License Numbers:
Report Numbers:
05000456/2023402 and 05000457/2023402
Enterprise Identifier:
I-2023-402-0057
Licensee:
Constellation Energy Generation, LLC
Facility:
Braidwood Station
Location:
Braceville, IL
Inspection Dates:
October 30, 2023 to November 03, 2023
Inspectors:
A. Anderson, Physical Security Inspector
Approved By:
Michael E. Ziolkowski, Chief
Security, Emergency Preparedness, and Incident Response Branch
Division of Radiological Safety and Security
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Braidwood Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
SAFEGUARDS
71130.07 - Security Training
The inspectors evaluated the security training program through completion of the following
procedure elements: Security Training
(1)
- Tier I: All Requirements
- Tier II: 02.05 b - d; 02.06 a; 02.07 a; 02.08 a; 02.09 b
- Tier III: 02.10; 02.11 a; 02.12 b; 02.13 a - b
71130.09 - Security Plan Changes
The inspectors evaluated the security plan changes through completion of the following
procedure elements: Security Plan Changes
- (1) Since the last NRC inspection of this program area, Security Plan Revision 17 to 18 was implemented based on your determination, in accordance with 10 CFR 50.54 (p)(2) that the changes resulted in no decrease in safeguards effectiveness of the security plan, and that the revised security plan changed continues to meet the requirements of 10 CFR 73.55 (b). The inspectors conducted a review of the security plan changes to evaluate for potential decrease in safeguards effectiveness of the security plan. However, this review does not constitute formal NRC approval of the changes. Therefore, these changes remain subject to future NRC inspection in their entirety.
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)
=
- (1) May 23, 2022 through October 30,
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On November 3, 2023, the inspectors presented the security baseline inspection results to Christopher Abbott and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
1108-PP-RO
Use of Force Continuum per SY-AA-150-101-F-48
4106-PP-RO per
SY-AA-150-101-
F-48
Tactical Weapons Training
NOSA-BRW-23-
Security Programs Audit Report
01/17/2023
through
2/03/2023
Miscellaneous
SY-AA-150-101-
F-14
Year Training Plan (2023, 2024, 2025)
PI-AA-126-1001-
F-01, Revision 5
Self-Assessment: AR4668456, pre-NRC Security Training
Baseline Inspection (71130.07)
08/28/2023 -
10/12/2023
Exelon Nuclear Security Training
Procedures
Constellation Nuclear Security OJT Program
Braidwood Station Security Plan, Training and Qualification
Plan, Safeguards Contingency Plan and Independent Spent
Fuel Storage Installation Security Program
Miscellaneous
SY-BR-101-501
Supplemental Site Security Contingency Plan (SGI)
07/25/2023
Procedures
SY-AA-101-104-
F-08
Screening Evaluation for Revisions to A Physical Security
Implementing Procedure
Miscellaneous
Revision 5
Monthly Data Elements for NRC ROP Indicator
10/01/2022
through
10/06/2023
71151
Procedures
Security Performance Monitoring, Oversight, and Indicators
3