IR 05000456/2020023

From kanterella
Jump to navigation Jump to search
Baseline Security Inspection Document; 05000456/2023/402; 05000457/2023/402
ML23348A211
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 12/15/2023
From: Michael Ziolkowski
NRC/RGN-III
To: Rhoades D
Constellation Nuclear
References
IR 2023402
Download: ML23348A211 (7)


Text

SUBJECT:

BRAIDWOOD STATION - SECURITY BASELINE INSPECTION REPORT 05000456/2023402 AND 05000457/2023402

Dear David Rhoades:

On November 3, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Braidwood Station and discussed the results of this inspection with Christopher Abbott and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Michael E. Ziolkowski, Chief Security, Emergency Preparedness, and Incident Response Branch Division of Radiological Safety and Security Docket Nos. 05000456 and 05000457 License Nos. NPF-72 and NPF-77

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000456 and 05000457

License Numbers:

NPF-72 and NPF-77

Report Numbers:

05000456/2023402 and 05000457/2023402

Enterprise Identifier:

I-2023-402-0057

Licensee:

Constellation Energy Generation, LLC

Facility:

Braidwood Station

Location:

Braceville, IL

Inspection Dates:

October 30, 2023 to November 03, 2023

Inspectors:

A. Anderson, Physical Security Inspector

Approved By:

Michael E. Ziolkowski, Chief

Security, Emergency Preparedness, and Incident Response Branch

Division of Radiological Safety and Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Braidwood Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.07 - Security Training

The inspectors evaluated the security training program through completion of the following

procedure elements: Security Training

(1)

  • Tier I: All Requirements
  • Tier II: 02.05 b - d; 02.06 a; 02.07 a; 02.08 a; 02.09 b
  • Tier III: 02.10; 02.11 a; 02.12 b; 02.13 a - b

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following

procedure elements: Security Plan Changes

(1) Since the last NRC inspection of this program area, Security Plan Revision 17 to 18 was implemented based on your determination, in accordance with 10 CFR 50.54 (p)(2) that the changes resulted in no decrease in safeguards effectiveness of the security plan, and that the revised security plan changed continues to meet the requirements of 10 CFR 73.55 (b). The inspectors conducted a review of the security plan changes to evaluate for potential decrease in safeguards effectiveness of the security plan. However, this review does not constitute formal NRC approval of the changes. Therefore, these changes remain subject to future NRC inspection in their entirety.

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)

=

(1) May 23, 2022 through October 30,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On November 3, 2023, the inspectors presented the security baseline inspection results to Christopher Abbott and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

1108-PP-RO

Use of Force Continuum per SY-AA-150-101-F-48

4106-PP-RO per

SY-AA-150-101-

F-48

Tactical Weapons Training

AR 04546538;

NOSA-BRW-23-

Security Programs Audit Report

01/17/2023

through

2/03/2023

Miscellaneous

SY-AA-150-101-

F-14

Year Training Plan (2023, 2024, 2025)

PI-AA-126-1001-

F-01, Revision 5

Self-Assessment: AR4668456, pre-NRC Security Training

Baseline Inspection (71130.07)

08/28/2023 -

10/12/2023

SY-AA-150-101

Exelon Nuclear Security Training

71130.07

Procedures

SY-AA-150-104

Constellation Nuclear Security OJT Program

Braidwood Station Security Plan, Training and Qualification

Plan, Safeguards Contingency Plan and Independent Spent

Fuel Storage Installation Security Program

Miscellaneous

SY-BR-101-501

Supplemental Site Security Contingency Plan (SGI)

07/25/2023

71130.09

Procedures

SY-AA-101-104-

F-08

Screening Evaluation for Revisions to A Physical Security

Implementing Procedure

Miscellaneous

LS-AA-2160,

Revision 5

Monthly Data Elements for NRC ROP Indicator

10/01/2022

through

10/06/2023

71151

Procedures

SY-AA-1024

Security Performance Monitoring, Oversight, and Indicators

3