Letter Sequence RAI |
---|
EPID:L-2020-LLR-0099, Submittal of Relief Request I4R-11 for Braidwood Station, Units 1 and 2, and Relief Request I4R-18 for Byron Station, Units 1 and 2, Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements (Open) EPID:L-2020-LLR-0100, Submittal of Relief Request I4R-11 for Braidwood Station, Units 1 and 2, and Relief Request I4R-18 for Byron Station, Units 1 and 2, Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements (Open) |
|
MONTHYEARRS-20-085, Submittal of Relief Request I4R-11 for Braidwood Station, Units 1 and 2, and Relief Request I4R-18 for Byron Station, Units 1 and 2, Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements2020-07-24024 July 2020 Submittal of Relief Request I4R-11 for Braidwood Station, Units 1 and 2, and Relief Request I4R-18 for Byron Station, Units 1 and 2, Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements Project stage: Request ML21004A1452020-12-30030 December 2020 NRR E-mail Capture - Request for Additional Information Regarding Relief Requests Braidwood I4R-11 and Byron I4R-18 Project stage: RAI RS-21-015, Response to Request for Additional Information Related to Relief Request for Braidwood I4R-11 and Byron I4R-182021-02-10010 February 2021 Response to Request for Additional Information Related to Relief Request for Braidwood I4R-11 and Byron I4R-18 Project stage: Response to RAI ML21134A0062021-08-0303 August 2021 Proposed Alternatives to the Requirements of the American Society of Mechanical Engineers Boiler & Pressure Vessel Code (Epids L-2020-LLR-0099 and L-2020-LLR-0100) Project stage: Other 2020-07-24
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML23331A8922023-11-22022 November 2023 Supplement - Braidwood Security Rule Exemption Request ISFSI Docket No. Reference ML23317A2012023-11-22022 November 2023 (External_Sender) Supplement - Byron Security Rule Exemption Request ISFSI Docket No. Reference ML23321A2012023-11-17017 November 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds (L-2023-LLR-0062) ML23311A1692023-11-0707 November 2023 NRR E-mail Capture - Constellation - Fleet Request - Acceptance of Proposed Alternative for Examinations of Exam Categories B-B, B-D, and C-A SG Pressure Retaining Welds and Full Penetration Welded Nozzles (L-2023-LLR-0055 and L-2023-LLR-00 ML23311A1682023-11-0707 November 2023 NRR E-mail Capture - Constellation - Fleet Request - Acceptance of Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections (L-2023-LLR-0053 and L-2023-LLR-005 ML23305A2992023-11-0101 November 2023 NRR E-mail Capture - NRC Acceptance Review of Byron, Unit 2, Relief Request I4R-24 ML23304A0222023-10-30030 October 2023 NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - Braidwood 1 & 2 - Exemption from Security Rule (L-2023-LLE-0030) ML23304A0202023-10-30030 October 2023 NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - Byron 1 & 2 - Exemption from Security Rule (L-2023-LLE-0027) ML23272A0602023-09-29029 September 2023 NRR E-mail Capture - NRC Acceptance Review of Byron, Unit 1, Relief Request I4R-25 ML23187A0092023-07-0606 July 2023 NRR E-mail Capture - NRC Acceptance Review of Byron and Braidwood Request to Adopt TSTF-370 ML23103A4692023-04-12012 April 2023 NRR E-mail Capture - NRC Acceptance Review of Braidwood Request for Amendment to Revise TS 3.7.9 ML23069A0332023-03-0606 March 2023 Email to K. Lueshen Byron and Braidwood Commitment 10 - Request for Additional Information Set 1 ML23115A2412023-01-20020 January 2023 NRR E-mail Capture - Preliminary RAIs Related to L-2022-LLA-0131 - Byron, Unit 2, Reinsertion of an Accident Tolerant Fuel Lead Test Assembly ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI ML22284A1022022-10-0606 October 2022 NRR E-mail Capture - NRC Acceptance Review for Byron, Unit 2, License Amendment Request (LAR) to Reinsert an Accident Tolerant Fuel (ATF) Lead Test Assembly (LTA) (L-2022-LLA-0131) NRC-2100-2022, EN 55999 Valcor Coil Shell Assemblies Final Notification (004)2022-09-12012 September 2022 EN 55999 Valcor Coil Shell Assemblies Final Notification (004) ML22255A0132022-09-0909 September 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood, Byron, Calvert Cliffs, Ginna - License Amendment Request to Adopt TSTF-577 ML22200A0782022-07-19019 July 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request to Use Honeywell Mururoa V4F1 R Supplied Air Suits NRC 2110-2022, EN 55999 - Valcor Engineering Corporation (009)2022-07-18018 July 2022 EN 55999 - Valcor Engineering Corporation (009) ML22189A0602022-07-0707 July 2022 NRR E-mail Capture - Draft RAI for Byron/Braidwood TSTF-501 ML22136A2722022-05-16016 May 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood and Byron Adoption of TSTF-501 ML22129A0132022-05-0606 May 2022 NRR E-mail Capture - Draft RAIs for Requests for Alternatives I4R-17, I4R-23, ISI-05-018, I6R-10 ML22271A0772022-05-0606 May 2022 NRR E-mail Capture - Final RAIs 9.1.2021 Constellation Relief Request ML22116A0242022-04-25025 April 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood, Byron, and Ginna Request to Adopt TSTF-246 ML22105A0722022-04-15015 April 2022 NRR E-mail Capture - Braidwood/Byron Verbal Authorization for Proposed Alternative I4R-15/I4R-21 ML22091A0852022-04-0101 April 2022 NRR E-mail Capture - Braidwood and Byron - Final RAI Regarding Proposed Alternative for Various Pressurizer Welds (EPID L-2021-LLR-0035 and 0036) ML22088A1562022-03-0202 March 2022 NRR E-mail Capture - Byron, Braidwood, Calvert Cliffs, and Ginna - Non-acceptance of Application to Revise Technical Specifications 5.6.5.b, the Core Operating Limits Report (COLR) ML22091A0842022-02-24024 February 2022 NRR E-mail Capture - Braidwood and Byron - Withdrawal of Draft RAI Regarding Proposed Alternative for Various Pressurizer Welds (EPID L-2021-LLR-0035 and 0036) ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML23089A0152022-01-0505 January 2022 NRR E-mail Capture - NRC Acceptance Review of Byron - Proposed Alternative for Examinations of Categories B-B, B-D, and C-A SG Welds and Nozzles ML23089A0172022-01-0505 January 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood - Proposed Alternative for Examinations of Categories B-B, B-D, and C-A SG Welds and Nozzles ML21301A0672021-10-28028 October 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-541 ML21272A1492021-09-29029 September 2021 NRR E-mail Capture - NRC Acceptance Review of Braidwood and Byron - Proposed Alternative for Examinations of Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21252A0172021-09-0303 September 2021 NRR E-mail Capture - NRC Acceptance Review - Braidwood - License Amendment to Revise Technical Specification 3.7.9, Ultimate Heat Sink ML21252A0042021-08-26026 August 2021 NRR E-mail Capture - NRC Acceptance Review - Braidwood/Byron/Clinton - Adoption of TSTF-273, Safety Function Determination Program Clarifications ML21215A3502021-08-0303 August 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-554 ML21203A3112021-07-21021 July 2021 NRR E-mail Capture - Final Byron Permanently Defueled Technical Specifications (PDTS) - Second Round RAI ML21189A1602021-07-0808 July 2021 NRR E-mail Capture - Request for Additional Information - Braidwood, Byron, and Ginna - Amendment to Address the Issues in Westinghouse NSALs ML21189A1612021-07-0808 July 2021 NRR E-mail Capture - Second Round Request for Additional Information - Byron Permanently Defueled Technical Specification Amendment ML21154A0162021-06-0202 June 2021 NRR E-mail Capture - NRC Acceptance Review of Braidwood - Proposed Alternative for Exam of Pzr Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Shell Welds ML21154A0172021-06-0202 June 2021 NRR E-mail Capture - Acceptance Review of Byron - Proposed Alternative for Exam of Pzr Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Shell Welds ML21154A0132021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0112021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0142021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21123A2442021-05-0303 May 2021 NRR E-mail Capture - NRC Acceptance Review of Braidwood/Byron/Ginna - Application to Address the Issues Identified in Westinghouse Documents NSAL-09-5 and NSAL-15-1 (L-2021-LLA-0066) ML21117A0442021-04-26026 April 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21084A2532021-03-24024 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Transfer Application ML21081A0972021-03-19019 March 2021 Acceptance Review for Byron Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis-External Events (EPID L-2021-JLD-0004) (E-mail) 2023-09-29
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23339A0452023-12-0505 December 2023 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000546/2024010 ML23297A2352023-10-26026 October 2023 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection ML23209A7242023-07-31031 July 2023 Request for Information on the NRC Quadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000454/2024010 and 05000455/2024010 ML23198A0372023-07-17017 July 2023 Information Request to Support Upcoming Problem Identification and Resolution (PIR) Inspection at Byron Nuclear Plant ML23191A8442023-07-10010 July 2023 05000456; 05000457 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML23172A1172023-06-22022 June 2023 Notification of NRC Fire Protection Team Inspection Request for Information ML23110A3202023-04-21021 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML23094A1352023-04-0404 April 2023 Request for Information for Nrc Commercial Grade Dedication Inspection Inspection Report 05000456/2023010 05000457/2023010 ML23069A0342023-03-0606 March 2023 Unit 1 Lr Commitment 10 RAI Set 1 - (Non-Proprietary) ML23069A0332023-03-0606 March 2023 Email to K. Lueshen Byron and Braidwood Commitment 10 - Request for Additional Information Set 1 ML23115A2412023-01-20020 January 2023 NRR E-mail Capture - Preliminary RAIs Related to L-2022-LLA-0131 - Byron, Unit 2, Reinsertion of an Accident Tolerant Fuel Lead Test Assembly ML23018A1632023-01-18018 January 2023 Notification of NRC Baseline Inspection and Request for Information ML22241A0522022-08-29029 August 2022 Notification of NRC Baseline Inspection and Request for Information Inspection Report 05000456/2022004 05000457/2022004 ML22237A0272022-08-25025 August 2022 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML22271A0772022-05-0606 May 2022 NRR E-mail Capture - Final RAIs 9.1.2021 Constellation Relief Request ML22129A0132022-05-0606 May 2022 NRR E-mail Capture - Draft RAIs for Requests for Alternatives I4R-17, I4R-23, ISI-05-018, I6R-10 ML22116A1272022-04-26026 April 2022 Unit 2 RFI for an NRC Triennial Heat Exchanger/Sink Performance Inspection and RFI IR 05000454/2022002 05000455/2022002 ML22091A0852022-04-0101 April 2022 NRR E-mail Capture - Braidwood and Byron - Final RAI Regarding Proposed Alternative for Various Pressurizer Welds (EPID L-2021-LLR-0035 and 0036) ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML22034A9862022-02-0404 February 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000456/2022402 05000457/2022402 ML21350A4372021-12-16016 December 2021 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team) Inspection Report 05000456/2022010 and 05000457/2022010 ML21273A3312021-10-0404 October 2021 Information Request to Support Upcoming Biennial Problem Identification and Resolution (Pi&R) Inspection at Byron Station ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21228A2352021-08-17017 August 2021 Notification of NRC Baseline Inspection and Request for Information Inspection Report 05000457/2021004 ML21203A3112021-07-21021 July 2021 NRR E-mail Capture - Final Byron Permanently Defueled Technical Specifications (PDTS) - Second Round RAI ML21193A0942021-07-12012 July 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21189A1612021-07-0808 July 2021 NRR E-mail Capture - Second Round Request for Additional Information - Byron Permanently Defueled Technical Specification Amendment ML21189A1602021-07-0808 July 2021 NRR E-mail Capture - Request for Additional Information - Braidwood, Byron, and Ginna - Amendment to Address the Issues in Westinghouse NSALs ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21117A0342021-05-0505 May 2021 Request for Additional Information Regarding Proposed Alternative to Use ASME Code Case N-893 ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21057A1022021-02-25025 February 2021 Notification of NRC Fire Protection Team Inspection Request for Information; Inspection Report 05000456/2021010; 05000457/2021010 ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML21036A1102021-02-0404 February 2021 NRR E-mail Capture - Draft RAIs for Byron Station, Unit Nos. 1 and 2, Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition ML21029A3302021-01-29029 January 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Fleet Alternative Request to Use ASME Code Case N-885 ML21020A1292021-01-20020 January 2021 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000456/2021002; 05000457/2021002 ML21004A1452020-12-30030 December 2020 NRR E-mail Capture - Request for Additional Information Regarding Relief Requests Braidwood I4R-11 and Byron I4R-18 ML20329A4852020-11-24024 November 2020 Notification of NRC Fire Protection Team Inspection Request for Information ML20294A5492020-10-21021 October 2020 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML20289A1142020-10-0909 October 2020 NRR E-mail Capture - Preliminary RAIs for LAR Regarding Non-conservative TS EDG Frequency Tolerance ML20153A7042020-06-0101 June 2020 NRR E-mail Capture - Preliminary RAI for Fleet Request to Use Alternative OMN-26 ML20104C1452020-04-10010 April 2020 NRR E-mail Capture - Preliminary RAIs for Exelon'S April 6, 2020, Application to Defer Braidwood, Unit 2, Steam Generator Inspections ML20077M2212020-03-20020 March 2020 Ti 2515/194 Inspection Documentation Request ML20023A0812020-01-23023 January 2020 NRR E-mail Capture - RAIs for L-2019-LLA-0201 - Braidwood, Units 1 and 2, LAR to Revise TS 3.7.9, Ultimate Heat Sink ML20008D3992020-01-0808 January 2020 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000454/2020001 ML19350B2952019-12-16016 December 2019 NRR E-mail Capture - Draft Request for Additional Information Regarding Braidwood Station, Units 1 and 2, Impractical Inservice Inspection Requirements (L-2019-LLA-0081) ML19275H1362019-10-0202 October 2019 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Request to Use ASME Code Case N-879 ML19252C1542019-08-22022 August 2019 NRR E-mail Capture - Issuance of the Remainder of Preliminary RAIs for Braidwood/Byron TSTF-505 Application ML19232A2242019-08-0707 August 2019 NRR E-mail Capture - Partial Issuance of Final RAIs for Braidwood/Byron TSTF-505 Application ML19207A0672019-07-26026 July 2019 NRR E-mail Capture - Partial Issuance of Preliminary RAIs for Braidwood/Byron TSTF-505 Application 2023-07-31
[Table view] |
Text
From: Wiebe, Joel Sent: Wednesday, December 30, 2020 12:21 PM To: 'Henderson, Phillip A:(Exelon Nuclear)'
Subject:
Request for Additional Information Regarding Relief Requests Braidwood I4R-11 and Byron I4R-18 REQUEST FOR ADDITIONAL INFORMATION OFFICE OF NUCLEAR REACTOR REGULATION Exelon Generation Co., LLC Dockets:
05000454-PWR-Byron 1, 05000456-PWR-Braidwood 1, 05000455-PWR-Byron 2, 05000457-PWR-Braidwood 2 EPIDS: L-2020-LLR-0099 and L-2020-LLR-0100 Questions Question Number: 55 The request for relief for Containment Unbonded Post-Tensioning System Inservice Inspection Requirements in Accordance with 10 CFR 50.55a(z)(1), Section 4, Reason for Request, states "ASME Section XI, Subsection IWL requires periodic visual examination and physical testing of Containment Building concrete as well as physical testing of post-tensioning systems."
The staff finds that ASME Section XI, Subsection IWL does not require periodic physical testing of Containment Building concrete. Describe what kind of physical testing of concrete is required and whether it has been performed. If yes, where are the test results documented.
Question Number: 56 Deleted Question Number: 57 PART B - CONTAINMENT DESCRIPTION, ISI PROGRAM, and
SUMMARY
of PROPOSED PROGRAM CHANGES, Containment ISI Program Summary Description, states "Also, limited scope visual examinations that addressed Unit 2 water intrusion issues were performed at Byron in 1987 and 1988. Limited scope visual examinations that addressed Unit 1 and Unit 2 water intrusion issues were performed at Braidwood in June - August 1987 and October -
November 1990."
Describe how the water intruded into the containment buildings and the results of these limited scope visual examinations activities.
Question Number: 58 The licensee states the following:
- 1. "Byron and Braidwood have completed nine and eight, respectively, pre-stressing system surveillances on each unit. These were based on Regulatory Guide 1.35 or 10CFR50.55a / ASME Section XI Subsection IWL,"
- 2. "the Regulatory Guide 1.35 requires "Examination sample size - six dome, five vertical, and ten hoop tendons,"
- 3. "Regulatory Guide 1.35 was withdrawn in August 2015 following the incorporation, by reference, of ASME Section XI, Subsection IWL into NRC Regulation 10CFR50.55a," and
- 4. "the examination intervals and wire testing addressed in the 1973 original issue of Regulatory Guide 1.35 are now, 45 years later, still incorporated effectively unchanged into the current edition of ASME Section XI, Subsection IWL."
Based on the above, provide responses to the following questions:
- 1. Byron Unit 1, the sample sizes for dome tendons are five for years 1 and 5, and three for years 10, 20, and 30 (see Bryon Table 7), for vertical tendons are six for years 1 and 5, and three for years 10, 20, and 30 (see Table 5), and for hoop tendons are ten for year 1, eight for year 5, and four for years 10, 20, and 30 (see Bryon Table 3).
Provide an explanation for those sample sizes that are less than that of the current edition of ASME Section XI, Subsection IWL.
- 2. Byron Unit 2, the sample sizes for dome tendons are five for years 1 (see Bryon Table 8),
three for years 10, 20, and 30 (see Bryon Table 8), for vertical tendons are eight for year 1, six for year 5, and four for years 15, 25, and 35 (see Bryon Table 6), and for hoop tendons are twelves for year 1, ten for year 5, and five for years 15, 25, and 35 (see Bryon Table 4). Provide an explanation for those sample sizes that are less than that of the current edition of ASME Section XI, Subsection IWL.
- 3. Braidwood Unit 1, the sample sizes for dome tendons are four for years 1, seven for years 5, three for years 10 and 20, and four for year 30 (see Braidwood Table 7), for vertical tendons are six for years 1 and 5, and three for years 10, four for year 20, and three for year 30 (see Braidwood Table 5), and for hoop tendons are nine for year 1, eight for year 5, and four for years 10, five for year 20, and four for year 30 (see Braidwood Table 3). Provide an explanation for those sample sizes that are less than that of the current edition of ASME Section XI, Subsection IWL.
- 4. Braidwood Unit 2, the sample sizes for dome tendons are five for years 1 and 5, and three for years 15 and 25 (see Braidwood Table 8), for vertical tendons are six for years 1 and 5, and three for year 10, four for year 20, and three for year 30 (see Braidwood Table 5), and for hoop tendons are nine for year 1, eight for year 5, and four for year 10, five for year 20, and four for year 30 (see Braidwood Table 3).
Provide an explanation for those sample sizes that are less than that of the current edition of ASME Section XI, Subsection IWL.
- 5. There are ten numerical values listed in Table 3 for Unit 1 year 1 hoop tendon forces, but only seven forces are plotted in figure 1. There are 8 numerical values listed in Table 3 for Unit 1 year 5 for hoop tendon forces, but only four are plotted in figure 1.
Provide an explanation for the discrepancy.
Question Number: 59 The licensee developed and proposed formulas indicating that the pre-stressing forces in the cylinder both in the hoop and vertical directions and in the dome of the containments have been
decreasing gradually with time. The formulas predict that the pre-stressing forces will remain above the required minimum magnitudes for the next ten years. This is the main argument used by the licensee to extend the ASME Code's five year surveillance intervals to ten years.
However, the prestressing forces in the following figures do not match the licensee's formula predicted. The prestressing forces in the following figures have been decreased or increased or flattened at different time intervals, sometimes sharply and other times gradually, with no predictable trends (increase or decrease or flat) and magnitudes from time to time. Therefore, the use of the formulas to predict the future prestressing lost in the containment as the justification for extending the ASME Code's five-year surveillance intervals to ten-year intervals may not be valid.
Figure 1 Byron Unit 1 Hoop Tendon Force Trend & LCL / 1 30 Year Surveillance Results indicate that the prestressing force is decreased from year 1 to year 5 and decreased more to year 10, but then is reversed to increase from year 10 to year 29 and is decreased again to year 30.
Figure 8 - Byron Unit 1 Vertical Tendon Force Trend & LCL / 5 30 Year Surveillance Results indicate that the prestressing force is increased from year 5 to year 10 and then flattened to year 20 and then decreased from year 20 to year 30.
Figure 10 Byron Unit 2 Vertical Tendon Force Trend & LCL / 1 35 Year Surveillance Results indicate that the prestressing force is decreased sharply from year 1 to year 5 and then flattened to year 15 and then another sharply decreased to year 25 and then slightly increased to year 35.
Figure 13 Byron Unit 1 Dome Tendon Force Trend & LCL / 1 30 Year Surveillance Results indicate that the prestressing force is decreased sharply from year 1 to year 5 and then increased from year 5 to year 10 and then decreased to year 20 and then increased slightly to year 30.
Figure 16 Braidwood Unit 2 Dome Tendon Force Trend & LCL / 1 35 Year Surveillance Results indicates that the prestressing force is reduced from year 1 to year 5 and is increased from year 5 upward through years 15 and 25.
Figure 17 Byron Unit 2 Dome Tendon Force Trend & LCL / 5 35 Year Surveillance Results indicates that the prestressing force is increased from year 5 to year 15 and then decreased from year 15 to year 25 and 35.
Provide an explanation for such irregular phenomena of prestressing loss or gain with time in containments. Also provide additional justification why it is acceptable to extend the surveillance intervals from the ASME Code's five year surveillance intervals to the proposed ten year intervals.
Question Number: 60 PART C - BACKGROUND OF CURRENT ISI REQUIREMENTS AND BASIS FOR PROPOSED ALTERNATIVES, Basis for Proposed Alternatives / Relief from 10CFR50.55a and IWL Requirements, Section 4.2 System Hardware Condition History, states two conditions, "A number of wires were severely corroded and found to be no longer effective as pre-stressing elements," and "A unique combination of steel chemistry and high hardness led to the failure of anchor heads in both units of a two-unit plant. Several failures have occurred at random times over the past four decades."
Were any one of the conditions identified during the containment in-service inspection (CISI) activities? Have any of these conditions occurred at the Byron or Braidwood plant? If yes, describe in detail how the condition was identified and resolved.
Question Number: 61 Surveillance records indicate that some tendons in Byron and Braidwood have exceeded the free water limit of 0.2 liters as the licensee stated. For examples, Byron, Unit 1, had 0.5 liters of free water for tendon H27BA at Buttress A during the July 1986 surveillance, Unit 2 had 7.7 liters of free water for tendon H7FE at Buttress E, 6.6 liters of free water for tendon H2FF at Buttress F, and 6.1 liters of free water for tendon H3FE at Buttress E during the September 2019 surveillance. Braidwood, Unit 1, had 3.2 liters of free water for tendon H1AC at buttress C, and Unit 2, had 17.2 liters of free water for tendon H5FE at buttress F, during the July 1986 surveillance. Although all sample analyses have shown the free water to be alkaline or neutral with pH of 7 or greater and, therefore, noncorrosive, there is no guarantee that condition will always be the case in the future. The significant amount of free water found during the most recent September 2019 surveillance for Byron Unit 2 should be a concern. The licensee proposed a program to alleviate that concern of extending the surveillance interval from five years to ten years.
Page 69 of the Byron/Braidwood Technical Report states "Also, an augmented surveillance program of limited intermediate examinations to monitor free water19 conditions, as well as the condition of the dome coatings and dome drainage, will be initiated." Footnote 19 states "It has been reasonably assumed that water intruding into the lower hoop tendon ductwork is ground water. The validity of this assumption will be checked by a water chemist or other qualified professional. It is expected that this evaluation will be based on the quantitative analysis of a water sample collected at a tendon anchorage (see the following paragraphs) and a ground water sample collected at a location as specified by the chemist."
Provide an explanation of the augmented surveillance program to monitor the free water conditions, as well as the condition of the dome coatings and dome drainage. Footnote 19 states "this evaluation will be based on the quantitative analysis of a water sample collected at a tendon anchorage (see the following paragraphs)." However, there are no paragraphs in the text because that is the end of the chapter.
Provide the missing text as stated.
Hearing Identifier: NRR_DRMA Email Number: 952 Mail Envelope Properties (DM8PR09MB7269193303FA2DADCB2B23568BD70)
Subject:
Request for Additional Information Regarding Relief Requests Braidwood I4R-11 and Byron I4R-18 Sent Date: 12/30/2020 12:21:13 PM Received Date: 12/30/2020 12:21:00 PM From: Wiebe, Joel Created By: Joel.Wiebe@nrc.gov Recipients:
"'Henderson, Phillip A:(Exelon Nuclear)'" <Phillip.Henderson@exeloncorp.com>
Tracking Status: None Post Office: DM8PR09MB7269.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 11150 12/30/2020 12:21:00 PM Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: