Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000454/2024011
ML24022A272
Person / Time
Site: Byron Constellation icon.png
Issue date: 01/23/2024
From: Matthew Domke
NRC/RGN-III/DORS/ERPB
To: Rhoades D
Constellation Energy Generation, Constellation Nuclear
References
IR 2024011
Download: ML24022A272 (1)


See also: IR 05000454/2024011

Text

David Rhoades

Senior Vice President

Constellation Energy Generation, LLC

President and Chief Nuclear Officer (CNO)

Constellation Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT:

BYRON STATION UNIT 1 REQUEST FOR INFORMATION FOR AN NRC

POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL INSPECTION

REPORT 05000454/2024011

Dear David Rhoades:

On June 3, 2024, the U.S. Nuclear Regulatory Commission (NRC) will begin a Post-Approval

Site Inspection for License Renewal phase 2 at Byron Station Unit 1. This inspection will be

performed in accordance with NRC Inspection Procedure (IP) 71003. This inspection will focus

on outage related activities to verify license conditions added as part of your renewed license

and a sample of license renewal commitments have been implemented.

To minimize the inspection impact on the site and to ensure a productive inspection for both

parties, we have enclosed a request for information needed for the inspection. It is important

that all these documents are up-to-date and complete to minimize the number of additional

documents requested during the preparation and/or the on-site portions of the inspection.

Information should be provided electronically. This information request has been divided into

two groups:

The first group lists information necessary for our initial inspection scoping and in-office

preparation activities. During the in-office preparation activities, the inspector will identify as

much as possible the information and activities to be reviewed during the inspection. This

information should be provided to the inspector by May 6, 2024.

The second group includes the additional information required for the inspector to review the

selected activities. This information should be available to the inspector 1 week before

arriving onsite or June 3, 2024. It is also requested that corrective action documents and/or

questions developed during the inspection be provided to the inspector as the documents

are generated.

The inspector for this license renewal inspection is Matthew Domke. We understand that our

primary contact for this inspection is Gerald Armstrong of your organization. If there are any

questions about the inspection or the material requested in the enclosure, please contact the

lead inspector at 630-829-9562 or via email at Matthew.Domke@nrc.gov.

January 23, 2024

D. Rhoades

2

This letter does not contain new or amended information collection requirements

subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, Control

Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget control

number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs document system

(ADAMS), accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the

Public Electronic Reading Room).

Sincerely,

Matthew Domke

Engineering Reactor Projects Branch

Division of Operating Reactor Safety

Docket No. 50-454

License No. NPF-37

Enclosure:

Document Request for Post-Approval

Site Inspection for License Renewal

cc w/encl: Distribution via LISTSERV

Signed by Domke, Matthew

on 01/23/24

ML24022A272

SUNSI Review

Non-Sensitive

Sensitive

Publicly Available

Non-Publicly Available

OFFICE

RIII

NAME

MDomke:sw

DATE

01/23/2024

DOCUMENT REQUEST FOR POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL

Enclosure

Inspection Report: 05000454/2024011

Inspection Dates:

June 10, 2024-June 28, 2024

Inspection Procedure:

IP 71003 Post-Approval Site Inspection for License Renewal

phase 2

Lead Inspector:

Matthew Domke

Reactor Inspector

630-829-9562

Matthew.Domke@nrc.gov

I.

Information Requested Prior to the Inspection Preparation Week:

The following information is requested by May 6, 2024, or sooner, to facilitate

inspection preparation. If you have any questions regarding this information, please

call the team leader. (Please provide the information electronically in PDF files,

Excel, or other searchable formats, preferably on station/corporate online portal for

document sharing. The electronic information should be identified by unit, contain

descriptive names, and be indexed and hyperlinked to facilitate ease of use.

Information in lists should contain enough information to be easily understood by

someone who has knowledge of light-water reactor technology.)

1.

Provide a list of your license renewal commitments with an approximate

completion status of each.

2.

Provide a list of your Aging Management Programs (AMPs), copies of associated

program basis documents, and a listing of the action tracking items for each.

3.

For AMPs that are one-time inspection programs, provide a list of completed

work order numbers for inspections that have been completed. This may be

incorporated with the previous item and should include identification of the

inspected component.

4.

Provide current management and license renewal organizational charts.

5.

Provide electronic copies of Updated Final Safety Analysis Report, Technical

Specifications, Technical Specifications Bases, and Technical Requirements

Manual.

6.

Provide copies of any internal/external self-assessments and associated

corrective action documents generated in preparation for the inspection.

II.

Information Requested to Be Available One Week Prior to Inspectors Arrival

On-Site, or June 3, 2024:

1.

Documentation demonstrating completion of license renewal commitments

completed as of the inspection date. For example, this may be in the form of a

binder for each commitment which includes the implementing documentation and

references.

DOCUMENT REQUEST FOR POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL

2

III.

Information Requested to Be Provided Throughout the Inspection

1.

Copies of any corrective action documents generated from inspector questions or

queries during this inspection.

2.

Copies of the list of questions submitted by the team members and the

status/resolution of the information requested (provide daily during the inspection

to each team member).

If you have questions regarding the information requested, please contact the lead inspector.