ML24022A272
| ML24022A272 | |
| Person / Time | |
|---|---|
| Site: | Byron |
| Issue date: | 01/23/2024 |
| From: | Matthew Domke NRC/RGN-III/DORS/ERPB |
| To: | Rhoades D Constellation Energy Generation, Constellation Nuclear |
| References | |
| IR 2024011 | |
| Download: ML24022A272 (1) | |
See also: IR 05000454/2024011
Text
David Rhoades
Senior Vice President
Constellation Energy Generation, LLC
President and Chief Nuclear Officer (CNO)
Constellation Nuclear
4300 Winfield Road
Warrenville, IL 60555
SUBJECT:
BYRON STATION UNIT 1 REQUEST FOR INFORMATION FOR AN NRC
POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL INSPECTION
REPORT 05000454/2024011
Dear David Rhoades:
On June 3, 2024, the U.S. Nuclear Regulatory Commission (NRC) will begin a Post-Approval
Site Inspection for License Renewal phase 2 at Byron Station Unit 1. This inspection will be
performed in accordance with NRC Inspection Procedure (IP) 71003. This inspection will focus
on outage related activities to verify license conditions added as part of your renewed license
and a sample of license renewal commitments have been implemented.
To minimize the inspection impact on the site and to ensure a productive inspection for both
parties, we have enclosed a request for information needed for the inspection. It is important
that all these documents are up-to-date and complete to minimize the number of additional
documents requested during the preparation and/or the on-site portions of the inspection.
Information should be provided electronically. This information request has been divided into
two groups:
The first group lists information necessary for our initial inspection scoping and in-office
preparation activities. During the in-office preparation activities, the inspector will identify as
much as possible the information and activities to be reviewed during the inspection. This
information should be provided to the inspector by May 6, 2024.
The second group includes the additional information required for the inspector to review the
selected activities. This information should be available to the inspector 1 week before
arriving onsite or June 3, 2024. It is also requested that corrective action documents and/or
questions developed during the inspection be provided to the inspector as the documents
are generated.
The inspector for this license renewal inspection is Matthew Domke. We understand that our
primary contact for this inspection is Gerald Armstrong of your organization. If there are any
questions about the inspection or the material requested in the enclosure, please contact the
lead inspector at 630-829-9562 or via email at Matthew.Domke@nrc.gov.
January 23, 2024
D. Rhoades
2
This letter does not contain new or amended information collection requirements
subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget, Control
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget control
number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRCs document system
(ADAMS), accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the
Public Electronic Reading Room).
Sincerely,
Engineering Reactor Projects Branch
Division of Operating Reactor Safety
Docket No. 50-454
License No. NPF-37
Enclosure:
Document Request for Post-Approval
Site Inspection for License Renewal
cc w/encl: Distribution via LISTSERV
Signed by Domke, Matthew
on 01/23/24
SUNSI Review
Non-Sensitive
Sensitive
Publicly Available
Non-Publicly Available
OFFICE
RIII
NAME
MDomke:sw
DATE
01/23/2024
DOCUMENT REQUEST FOR POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL
Enclosure
Inspection Report: 05000454/2024011
Inspection Dates:
June 10, 2024-June 28, 2024
Inspection Procedure:
IP 71003 Post-Approval Site Inspection for License Renewal
phase 2
Lead Inspector:
Reactor Inspector
630-829-9562
Matthew.Domke@nrc.gov
I.
Information Requested Prior to the Inspection Preparation Week:
The following information is requested by May 6, 2024, or sooner, to facilitate
inspection preparation. If you have any questions regarding this information, please
call the team leader. (Please provide the information electronically in PDF files,
Excel, or other searchable formats, preferably on station/corporate online portal for
document sharing. The electronic information should be identified by unit, contain
descriptive names, and be indexed and hyperlinked to facilitate ease of use.
Information in lists should contain enough information to be easily understood by
someone who has knowledge of light-water reactor technology.)
1.
Provide a list of your license renewal commitments with an approximate
completion status of each.
2.
Provide a list of your Aging Management Programs (AMPs), copies of associated
program basis documents, and a listing of the action tracking items for each.
3.
For AMPs that are one-time inspection programs, provide a list of completed
work order numbers for inspections that have been completed. This may be
incorporated with the previous item and should include identification of the
inspected component.
4.
Provide current management and license renewal organizational charts.
5.
Provide electronic copies of Updated Final Safety Analysis Report, Technical
Specifications, Technical Specifications Bases, and Technical Requirements
Manual.
6.
Provide copies of any internal/external self-assessments and associated
corrective action documents generated in preparation for the inspection.
II.
Information Requested to Be Available One Week Prior to Inspectors Arrival
On-Site, or June 3, 2024:
1.
Documentation demonstrating completion of license renewal commitments
completed as of the inspection date. For example, this may be in the form of a
binder for each commitment which includes the implementing documentation and
references.
DOCUMENT REQUEST FOR POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL
2
III.
Information Requested to Be Provided Throughout the Inspection
1.
Copies of any corrective action documents generated from inspector questions or
queries during this inspection.
2.
Copies of the list of questions submitted by the team members and the
status/resolution of the information requested (provide daily during the inspection
to each team member).
If you have questions regarding the information requested, please contact the lead inspector.