Summary of Telephone Conference Call Held on 08/22/12 Between the U.S. Nuclear Regulatory Commission and Entergy Operations, Inc., Concerning Requests for Additional Information Pertaining to the Grand Gulf Nuclear Station, LRA
ML12271A252
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 11/09/2012
From: Ferrer N
License Renewal Projects Branch 1
To: Mike Perito
Entergy Operations
Ferrer N, 415-1045
References
TAC ME7493
Download: ML12271A252 (11)


Text

\-~,.l'\ REGu~ UNITED STATES

+~v  ;'01' NUCLEAR REGULATORY COMMISSION

~

0 WASHINGTON, D.C. 20555-0001 ti  ;

%,e.i;

") ~o November 9, 2012 LICENSEE: Entergy Operations, Inc.

FACILITY: Grand Gulf Nuclear Station

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON AUGUST 22, 2012, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY OPERATIONS, INC., CONCERNING REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE GRAND GULF NUCLEAR STATION LICENSE RENEWAL APPLICATION (TAC. NO. ME7493)

The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Entergy Operations, Inc. (Entergy) held a telephone conference call on August 22,2012, to discuss and clarify the staff's requests for additional information (RAls) concerning the Grand Gulf Nuclear Station license renewal application. The telephone conference call was useful in clarifying the intent of the staffs RAls.

Enclosure 1 provides a listing of the participants and Enclosure 2 contains a listing of the RAls discussed with the applicant, including a brief description on the status of the items.

The applicant had an opportunity to comment on this summary.

Nathaniel Ferrer, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323

Enclosures:

1. List of Participants
2. List of Requests for Additional Information cc w/encls: Listserv

TELEPHONE CONFERENCE CALL GRAND GULF NUCLEAR STATION LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS AUGUST 22, 2012 PARTICIPANTS AFFILIATIONS Nate Ferrer U.S. Nuclear Regulatory Commission (NRC)

Jim Gavula NRC Angela Buford NRC Raj Auluck NRC Ted Ivy Entergy Operations, Inc. (Entergy)

Andy Taylor Entergy Alan Cox Entergy Arturo Smith Entergy Kirk Ehren Entergy Wayne Bichlmeir Entergy Reza Ahrabli Entergy Herbert Rideout Entergy Larry Seamans Entergy Enclosure 1

REQUESTS FOR ADDITIONAL INFORMATION (SET 34)

LICENSE RENEWAL APPLICATION AUGUST 22,2012 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Entergy Operations, Inc. (the applicant), held a telephone conference call on August 22,2012, to discuss and clarify the following requests for additional information (RAls) concerning the license renewal application (LRA).

Draft RAI 8.1.22-1 a Background. Based on information from GGNS calculation MC-Q1111-08011, the staff issued RAI B.1.22-1 questioning whether the Flow-Accelerated Corrosion Program manages wall thinning for components in the low pressure core spray (LPCS) and high pressure core spray (HPCS) systems. The applicant's response, dated May 25,2012, states that these systems are not susceptible to FAC because they experience two phase flow less than two percent of the time and that the referenced calculation confirmed the conclusion that the Flow-Accelerated Corrosion Program is not required to manage wall thinning in the LPCS and HPCS systems.

The response also stated that no other systems have aging effects being managed by the Flow-Accelerated Corrosion Program that were not identified in the LRA.

Information obtained during the staff's aging management program audit appears to indicate that several items in the LPCS (Le., #333, #403, #661, #662) and HPCS (Le., #253, #285, #301,

  1. 307, #402, #605) systems were being monitored through inspections performed by the Flow-Accelerated Corrosion Program. In addition, the staff identified in excess of 40 items in the residual heat removal (RHR) system that appeared to be monitored through inspections performed by the Flow-Accelerated Corrosion Program. However these components appear to be in portions of the RHR system that the CSI Technology evaluation No. 0700.104-10, "GGNS FAC System Susceptibility Evaluation," had excluded from susceptibility for flow-accelerated corrosion for an unspecified reason.

Issue. It is not clear to the staff whether the System Susceptibility Evaluation improperly excluded systems or portions of systems that were susceptible to flow-accelerated corrosion, or the inspections being performed by the Flow-Accelerated Corrosion Program are monitoring components that are susceptible to an aging mechanism other than flow-accelerated corrosion, or components that were previously monitored by the Flow-Accelerated Corrosion Program have been determined to be acceptable until the end of the period of extended operation and no longer need to be monitored.

Request. Review the components contained in the Flow-Accelerated Corrosion Program's reinspection list for future outages (specifically, items 333, 403, 661, 662, 253, 285, 301, 307, 402, and 605) and determine whether the inspections conducted on these components were for wall thinning due to flow-accelerated corrosion or for some other wall thinning mechanism.

If these components are no longer being inspected through the Flow-Accelerated Corrosion Program, either identify the program that now monitors wall thinning for these components or provide details showing that these components had previously been determined to be acceptable through the end of the period of extended operation.

-2 If these or any other components are being inspected through the Flow-Accelerated Corrosion Program and were previously excluded through the System Susceptibility Evaluation, explain why the System Susceptibility Evaluation inappropriately excluded these components and revise the LRA to justify the use of the Flow-Accelerated Corrosion Program to monitor aging mechanisms other than flow-accelerated corrosion.

Discussion: The applicant indicated that the question is clear. The staff will issue the question as a formal RAI.

Draft RAI 8.1.22-2a Background. GGNS Procedure EN-DC-315, "Flow-Accelerated Corrosion Program,"

Section 5.1.1, "Components Failing to Meet Initial Screening Criteria," states that a condition report shall be generated when "significant wall thinning," is detected in a system or when wall thinning is below Taccpt [acceptable wall thickness]. "Significant wall thinning" is defined in Section 3.0.39 as the largest of a) a thickness less than 60 percent of nominal pipe wall thickness (T nom), b) a thickness less than % (0.875 Tnom + Taccpd, or c) Taccpt +0.020 inches.

The staff issued RAI B.1.22-2 requesting GGNS to confirm that significant wall thinning, as defined in EN-DC-315, had not been detected in recent outages and condition reports were not required to be generated. The response to RAJ 8.1.22-2, dated May 25,2012, stated:

A review of program documentation and data from the Fall 2008 and Spring 2010 refueling outages determined that no significant wall thinning has been detected other than the wall thinning documented in the condition reports referenced in the background of this request for information, which had resulted in wall thickness below the minimum acceptable wall thickness. Thus no additional condition reports on significant wall thinning as defined in EN-DC-315 were required to be generated.

Information obtained during the staff's aging management program audit appears to indicate several instances where the measured wall thickness (T meas) was less than 60 percent of nominal pipe wall thickness (T nom), which meets the criteria for "significant wall thinning" in EN-DC-315. Specifically, in calculation MC-Q111-08011, "Evaluation of RF16 Flow Accelerated Corrosion Wall Thickness Data," for the refueling outage in fall 2008:

Item 314A, 4-inch pipe to downstream tee: T nom = 0.237, T meas = 0.122 [51%]

Item 353 3x6 expander: T nom =0.280, T meas =0.163, [58%]

Item 795, 2-inch elbow and pipe: T nom =0.218, T meas =0.095 [44%]

Issue. Inspections apparently identified significant wall thinning, but GGNS did not issue condition reports as required by the controlling procedure. Since the current program is not being implemented in accordance with the controlling procedure, the staff cannot reasonably conclude that the program will be implemented in accordance with the controlling procedure during the period of extended operation.

-3 Request. Re-review the program documentation and data from recent outages to confirm that no significant wall thinning, as defined in EN-DC-315, "Flow-Accelerated Corrosion Program had been identified and condition reports were not required to be generated. Specifically discuss items 314, 353, and 795 to explain why these are not examples of "significant wall thinning."

If significant wall thinning was identified, but condition reports were not generated, then provide information to demonstrate that there is reasonable assurance the program will be implemented in accordance with the controlling procedures during the period of extended operation.

Discussion: The applicant indicated that the question is clear. The staff will issue the question as a formal RAI.

Draft RAI 8.1.24-1a

Background:

In its response to RAI B.1.24-1 and the updated list of commitments, the applicant stated that it will enhance the Inservice Inspection-IWF Program to identify the component supports that contain high-strength bolting in sizes greater than 1-inch nominal diameter, and that the extent of examination will be as specified in ASME Code Section XI, Subsection IWF (Table IWF-2500-1).

Issue: It is not clear whether the applicant plans to assess the plant for all component supports applicable to the Inservice Inspection-IWF Program that contain high strength structural bolting and then establish a sample based upon the criteria specified in ASME Code Section XI, Table IWF-2500-1, or if the applicant plans to identify the high strength bolts among the component supports already identified as part of the IWF examination sample.

Request: Clarify whether the applicant will identify all of the high strength bolts that are eligible to be part of the IWF inspection population and establish a new sample for anchor bolts based on the ASME Table IWF-2500-1 or if it is going to identify high strength bolts from the already-established set of IWF supports. If the latter, explain how that approach will ensure that the ASME Code criteria for sample size will be met.

Discussion: The staff clarified that the reference to anchor bolts in the request section was an error. The staff was referring to high strength bolts and will reword the request section as follows:

Request: Clarify whether the applicant will identify all of the high strength bolts that are eligible to be part of the IWF inspection population and establish a new sample for high strength bolts based on the ASME Table IWF-2500-1 or if it is going to identify high strength bolts from the already-established set of IWF supports. If the latter, explain how that approach will ensure that the ASME Code criteria for sample size will be met.

The staff will issue the reworded question as a formal RAI.

-4 Draft RAI B.1.24-5a

Background:

In its response to RAls B.1.24-1 and B.1.24-5, the applicant references the GALL report statement that ASTM A-325, F-1852, and ASTM A-490 bolts used in civil structural applications have not been shown to be prone to stress corrosion cracking (SCC). In its response to RAI B.1.24-5, the applicant also states that "cracking due to SCC is an applicable aging effect on high-strength bolting greater than one inch and having a yield strength greater than 150 ksi exposed to sustained high tensile stress in a corrosive environment" and that "high-strength bolting is not exposed to a corrosive environment at Grand Gulf Nuclear Station."

Issue: The statement in the GALL Report that ASTM A-325, F-1852, and ASTM A-490 bolts have not been shown to be prone to SCC does not apply to high strength structural bolting for ASME Class 1, 2 and 3 piping and component supports. The GALL report also does not define or specify criteria for a "corrosive environment" that must be met for age-management of high strength structural bolting, rather it defines the applicable environment as air-indoor, uncontrolled, to manage high strength structural bolting for cracking due to stress corrosion cracking. The GALL report recommends that the ASME Section XI, Subsection IWF Program is enhanced to include consideration of the guidance applicable in EPRI NP-5769, EPRI TR-104213, and the additional recommendations of NUREG-1339 for selection of bolting material installation torque or tension and the use of lubricants and sealants to prevent or mitigate degradation and failure of structural bolting. In addition, the GALL Report recommends that for high strength structural bolting, the preventive actions for storage, lubricants, and stress corrosion cracking potential discussed in Section 2 of Research Council for Structural Connections (RCSC) publication "Specification for Structural Joints using ASTM A325 or A490 Bolts" need to be used. The applicant's response to RAI B.1.24-1 does not indicate whether the applicant's procedures implement the recommended guidance or consider the preventive actions for storage, lubricants, and stress corrosion cracking potential discussed in Section 2 of Research Council for Structural Connections (RCSC) publication "Specification for Structural Joints using ASTM A325 or A490 Bolts."

Request: Specify whether the Inservice Inspection-IWF Program will be enhanced in accordance with the GALL Report such that:

a. The guidance applicable in EPRI NP-5769. EPRI TR-104213, and NUREG-1339 for selection of bolting material and the use of lubricants and sealants will be used to prevent or mitigate degradation and failure of safety-related bolting
b. The preventive actions addressed in Section 2 of RCSC publication "Specification for Structural Joints using ASTM A325 or A490 Bolts" will be followed for structural bolting conSisting of ASTM A325, ASTM F1852. and/or ASTM A490 bolts If this guidance will not be used. provide technical justification for not following the guidelines recommended in the GALL Report.

Discussion: The applicant indicated that the question is clear. The staff will issue the question as a formal RAI.

Draft RAI B.1.41-1 a Background. The operating experience discussion for the Service Water Integrity Program states that degraded areas of coatings were identified on the submerged piping in the standby service water (SSW) basins. Based on the degree of degradation noted after 12 months, the

- 5 staff issued RAI B.1.41-1 questioning the adequacy of the 36-month inspection frequency specified in the coatings procedure 07 -S-07 -211, "Service Level I Coatings Conditions Assessment."

The response to RAI B.1.41-1, states that procedure 07 -S-07 -211 applies to the underwater coatings in the SSW basin, including the coatings on concrete structures, and that the 36-month inspection frequency is appropriate for these concrete structures. The response also stated:

"In addition to the SSW basin inspections specified in Procedure 07-S-07-211, GGNS performs SSW basin pipe coating inspections annually."

The Service Water Integrity Program descriptions in LRA Section B.1.41 and the UFSAR supplement in LRA Section A.1.41 state that the Service Water Integrity Program manages loss of material and fouling as described in the GGNS response to GL 89-13. However, the GGNS GL response, dated January 29, 1990, states that for protective coatings, "accessible external piping surface coatings are maintained by routine plant painting efforts." The GGNS response to GL 89-13 did not address submerged piping in the SSW basins, and GGNS Commitment Change Evaluations (CCEs) 2004-0002, 2006-0002, 2006-0004, and 2007-0001, for GL 89-13 commitments did not discuss protective coatings.

Issue. Based on the response to the RAI, it is not clear whether the SSW basin pipe coating inspections are controlled through procedure 07-S-07-211, through some other procedure, or through a combination of procedures. Since the SSW basin pipe coatings are currently inspected annually due to past piping degradation, it is not clear where the inspection frequency is specified and how the inspection frequency is controlled.

In addition, since the GGNS response to GL 89-13 stated that external surfaces are maintained by routine plant painting efforts, but the current inspection and maintenance of submerged piping do not appear to be routine painting activities, the LRA's program description and UFSAR supplement for the Service Water Integrity program do not reflect current GGNS aging management activities for the Service Water Integrity program.

Request.

a. Clarify which GGNS procedure controls the coating inspections for submerged piping in the SSW basin, the frequency of these inspections, and how inspection frequencies are adjusted based on plant-specific operating experience.
b. Update the program description in LRA Sections A. 1.41 and B.1.41 for the Service Water Integrity program to reflect current aging management activities or provide justification that the program described in GGNS response to GL 89-13, as modified through the commitment change process, adequately describes current GGNS aging management activities.

Discussion: The applicant indicated that the question is clear. The staff will issue the question as a formal RAJ.

Draft RAI B.1.41-3a Background. Based on information in GGNS condition report CR-GGN-201 0-01344, the staff issued RAI B.1.41-3 requesting information regarding whether components that are being

- 6 managed for loss of material by the Service Water Integrity program are also being managed for loss of material by GGNS MS-46, "Program Plan for Monitoring Internal Erosion/Corrosion in Moderated Energy Piping Components (Safety Related)." In addition, based on the similarity in definitions between "flow-accelerated corrosion," and "erosion/corrosion," the staff issued RAI* B.1.22-3 requesting information regarding the aging effects being managed by GGNS MS-46.

The response to RAI B.1.41-3, dated May 25, 2012, states:

"The GGNS MS-46 procedure for moderate energy piping is not an aging management program that is necessary or credited to manage the effects of aging for components that are included in the Service Water Integrity program." [emphasis added]

By contrast, the response to RAI B.1.22-3, dated May 25, 2012, states:

"These inspections [described in GGNS MS-46] are not credited as part of the aging management program described in LRA 8.1.22, Flow-Accelerated Corrosion Program.

However, inspections specified in GGNS MS-46 are credited as part of the aging management program for managing loss of material described in LRA B.1.21 Fire Water System Program and LRA B.1.41 Service Water Integrity. Furthermore, the inspections described in GGNS MS-46 may be used, where applicable, as opportunistic or periodic inspections defined in other aging management programs at GGNS." [emphasis added]

GALL Report AMP XI.M20, Open-Cycle Cooling Water System, states that this program manages aging effects caused by mechanisms including erosion. Although the GGNS response to GL 89-13, Action III, Item 7, stated that the SSW system did not meet the selection criteria of the erosion/corrosion monitoring program, the GGNS review for GL 89-13 appears to have used the criteria for NRC Bulletin 87-01, which is for flow-accelerated corrosion (as clarified in NSAC-202L, "Recommendations for an Effective Flow-Accelerated Corrosion Program"). Erosion as described in GL 89-13 relates to solid particle erosion, but as discussed in DRAFT Interim Staff Guidance 2012-001, "Wall Thinning Due to Erosion Mechanisms,"

erosion can be caused by other mechanisms, such as cavitation, flashing and droplet impingement Issue. Statements that were provided in response to RAI B.1.41-3 and RAI B.1.22-3 appear to be in conflict with each other. In addition, since the condition report and the response to RAI B.1.22-3 discuss MS-46, wall thickness inspections of pipe components are being performed at GGNS for erosion/corrosion. However, it is not clear whether these are one-time inspections that confirm the components are acceptable until the end of the period of extended operation, or whether these are ongoing monitoring activities that verify the acceptability of components for a time period less than the period of extended operation. In that regard, any one-time inspections performed early in plant life may have only considered a 40-year operating license.

Request.

a. Reconcile the apparent disparity between the responses to RAI 8.1.41-3 and RAI B.1.22-2 regarding whether the inspections specified in GGNS MS-46, "Program Plan for Monitoring Internal Erosion/Corrosion in Moderated Energy Piping Components

-7 (Safety Related)," are or are not credited in the Service Water Integrity Program. In addition, if inspections performed through MS-46 are credited by any aging management program, include appropriate changes to the related sections of the LRA.

b. Provide information regarding all components that are being monitored for erosion corrosion through GGNS MS-46 to demonstrate that these components are not within the scope of license renewal; or if components are within the scope of license renewal, that the monitoring activities are limited to one-time inspections which have verified the components are acceptable until the end of the period of extended operation or are credited by an aging management program in the LRA.

Discussion: The applicant indicated that the question is clear. The staff will issue the question as a formal RAI.

November 9,2012 LICENSEE: Entergy Operations, Inc.

FACILITY: Grand Gulf Nuclear Station

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON AUGUST 22, 2012, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY OPERATIONS, INC., CONCERNING REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE GRAND GULF NUCLEAR STATION, LICENSE RENEWAL APPLICATION (TAC. NO. ME7493)

The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Entergy Operations, Inc. (Entergy) held a telephone conference call on August 22, 2012, to discuss and clarify the staff's requests for additional information (RAls) concerning the Grand Gulf Nuclear Station, license renewal application. The telephone conference call was useful in clarifying the intent of the staff's RAls. provides a listing of the participants and Enclosure 2 contains a listing of the RAls discussed with the applicant, including a brief description on the status of the items.

The applicant had an opportunity to comment on this summary.

IRA!

Nathaniel Ferrer, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323

Enclosures:

1. List of Participants
2. List of Requests for Additional Information cc w/encls: Listserv DISTRIBUTION: See next page ADAMS Accession No'.. ML12271A252 *concurrence via email OFFICE PM:RPB1 :DLR LA:RPB2:DLR* BC:RPB1 :DLR PM:RPB1 :DLR NAME NFerrer IKing DMorey NFerrer DATE 10/23/12 10/4112 10/24/12 11/09/12 OFFICIAL RECORD COpy

Memo to Entergy Operations, Inc. from Nathaniel Ferrer dated November 9,2012

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON AUGUST 22, 2012, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY OPERATIONS, INC., CONCERNING REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE GRAND GULF NUCLEAR STATION, LICENSE RENEWAL APPLICATION (TAC. NO. ME7493)

DISTRIBUTION:

E-MAIL:

PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRapb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRsrg Resource NFerrer DDrucker DWrona DMorey AWang RSmith, RIV BRice, RIV DMclntyre, OPA