Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2023005)
ML23229A555
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 08/21/2023
From: David Proulx
NRC/RGN-IV/DORS/PBC
To: Kapellas B
Entergy Operations
Bloodgood M
References
IR 2023005
Download: ML23229A555 (5)


Text

August 21, 2023

SUBJECT:

UPDATED INSPECTION PLAN FOR GRAND GULF NUCLEAR STATION (REPORT 05000416/2023005)

Dear Brad Kapellas:

The enclosed inspection plan lists the inspections scheduled through June 30, 2025, for Grand Gulf Nuclear Station. The U.S. Nuclear Regulatory Commission (NRC) provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues.

Routine inspections performed by resident inspectors are not included in the inspection plan.

The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (817) 200-1561 with any questions you have regarding this letter.

Sincerely, Signed by Proulx, David on 08/21/23 David L. Proulx, Acting Chief Projects Branch C Division of Operating Reactor Safety Docket No. 05000416 License No. NPF-29 Enclosure:

Inspection Plan

ML23229A555 SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By:MRB Yes No Publicly Available Sensitive NRC-002 OFFICE SPE:DORS/C ABC:DORS/C NAME MBloodgood DProulx DATE 08/18/23 08/21/23

Site Inspection Activity Plan Grand Gulf 07/01/2023 - 06/30/2025 Unit Start End Activity CAC Title Staff Count Grand Gulf Final Determination Letter for CHRMs Calibration Issues 2 1 7/6/2023 7/28/2023 IP 71124.05 000729 Radiation Monitoring Instrumentation MC&A - 1 1 7/10/2023 7/13/2023 IP 71130.11 000742 Material Control and Accounting (MC&A)

RP 6,7 2 1 8/7/2023 8/11/2023 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1 8/7/2023 8/11/2023 IP 71124.07 000731 Radiological Environmental Monitoring Program GG 2023 BRQ 3 1 8/27/2023 9/2/2023 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance Security Access Authorization (.01), Access Control (.02), PIV (71151), and Plan Change (.09) 2 1 9/18/2023 9/22/2023 IP 71130.01 000733 Access Authorization 1 9/18/2023 9/22/2023 IP 71130.02 000734 Access Control 1 9/18/2023 9/22/2023 IP 71130.09 001656 Security Plan Changes 1 9/18/2023 9/22/2023 IP 71151 001338 Performance Indicator Verification Cyber Security Inspection - GG 4 1 10/29/2023 11/3/2023 IP 71130.10 000741 Cybersecurity 1 11/12/2023 11/17/2023 IP 71130.10 000741 Cybersecurity GG 2024 INITIAL EXAM 1 4 1 12/10/2023 12/16/2023 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1 1/21/2024 1/27/2024 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)

Inservice Inspection - GG 1 1 3/11/2024 3/15/2024 IP 71111.08G 000701 Inservice Inspection Activities (BWR)

RP 1,3,PI 2 1 3/11/2024 3/15/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1 3/11/2024 3/15/2024 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1 3/11/2024 3/15/2024 IP 71151 000746 Performance Indicator Verification Fire Protection Inspection - GG 3 1 4/1/2024 4/5/2024 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

1 4/15/2024 4/19/2024 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

GG 2024 PI&R Inspection 4 1 4/29/2024 5/3/2024 IP 71152B 000747 Problem Identification and Resolution 1 5/13/2024 5/17/2024 IP 71152B 000747 Problem Identification and Resolution Prepared on 8/18/2023 10:17:50 AM 1 of 3

Site Inspection Activity Plan Security Equipment (.04), Security Training (.07) 2 1 5/20/2024 5/24/2024 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1 5/20/2024 5/24/2024 IP 71130.07 000739 Security Training EP Program & PI Inspection (2024) - GG 1 1 6/17/2024 6/21/2024 IP 71114.02 000717 Alert and Notification System Testing 1 6/17/2024 6/21/2024 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1 6/17/2024 6/21/2024 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1 6/17/2024 6/21/2024 IP 71114.05 000720 Maintenance of Emergency Preparedness 1 6/17/2024 6/21/2024 IP 71151 001397 Performance Indicator Verification License Renewal 71003 - GG (Phase 2) 4 1 7/15/2024 7/19/2024 IP 71003 000687 Post-Approval Site Inspection for License Renewal 1 7/29/2024 8/2/2024 IP 71003 000687 Post-Approval Site Inspection for License Renewal Security Access Control (.02), Security Plan Changes (.09), Security PIV (71151) 1 1 8/5/2024 8/9/2024 IP 71130.02 000734 Access Control 1 8/5/2024 8/9/2024 IP 71130.09 001656 Security Plan Changes 1 8/5/2024 8/9/2024 IP 71151 001338 Performance Indicator Verification FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - GG 5 1 8/12/2024 10/25/2024 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1 9/30/2024 10/4/2024 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1 10/21/2024 10/25/2024 IP 71130.03 000735 Contingency Response - Force-On-Force Testing GG 2024 INITIAL EXAM 2 4 1 10/27/2024 11/2/2024 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1 12/1/2024 12/7/2024 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)

Cyber Security - GG 4 1 11/4/2024 11/8/2024 IP 71130.10 000741 Cybersecurity RP 5,8 2 1 11/18/2024 11/22/2024 IP 71124.05 000729 Radiation Monitoring Instrumentation 1 11/18/2024 11/22/2024 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation RP 1,4,PI - GG 2 1 2/3/2025 2/7/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1 2/3/2025 2/7/2025 IP 71124.04 000728 Occupational Dose Assessment 1 2/3/2025 2/7/2025 IP 71151 000746 Performance Indicator Verification EP 2025 Biennial Exercise & PI Inspection - GG 5 1 3/17/2025 3/21/2025 IP 71114.01 000716 Exercise Evaluation 1 3/17/2025 3/21/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1 3/17/2025 3/21/2025 IP 71151 001397 Performance Indicator Verification Prepared on 8/18/2023 10:17:50 AM 2 of 3

Site Inspection Activity Plan Security Access Control (71130.02), Security Plan Changes (71130.09), Security PIV (71151) 1 1 4/7/2025 4/11/2025 IP 71130.02 000734 Access Control 1 4/7/2025 4/11/2025 IP 71130.09 001656 Security Plan Changes 1 4/7/2025 4/11/2025 IP 71151 001338 Performance Indicator Verification Comprehensive Engineering Team Inspection - Grand Gulf 7 1 4/28/2025 5/2/2025 IP 71111.21M 000713 Comprehensive Engineering Team Inspection 1 5/12/2025 5/16/2025 IP 71111.21M 000713 Comprehensive Engineering Team Inspection Prepared on 8/18/2023 10:17:50 AM 3 of 3