|
---|
Category:Inspection Report
MONTHYEARIR 05000416/20240032024-11-0606 November 2024 Integrated Inspection Report 05000416/2024003 IR 05000416/20240112024-10-16016 October 2024 – Fire Protection Team Inspection Report 05000416/2024011 IR 05000416/20240122024-09-17017 September 2024 License Renewal Post Approval Phase 2 Inspection Report 05000416/2024012 IR 05000416/20244022024-09-0909 September 2024 Security Baseline Inspection Report 05000416/2024402 IR 05000416/20240052024-08-21021 August 2024 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2024005) IR 05000416/20240022024-07-29029 July 2024 Integrated Inspection Report 05000416/2024002 IR 05000416/20240102024-06-27027 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000416/2024010 IR 05000416/20240012024-05-0202 May 2024 Integrated Inspection Report 05000416 2024001 IR 05000416/20243022024-03-21021 March 2024 Notification of NRC Initial Operator Licensing Exam 05000416/2024302 IR 05000416/20230062024-02-28028 February 2024 Annual Assessment Letter for Grand Gulf Nuclear Station - Report 05000416/2023006 IR 05000416/20233012024-02-26026 February 2024 NRC Examination Report 05000416-2023301 IR 05000416/20230042024-01-25025 January 2024 Integrated Inspection Report 5000416/2023004 IR 05000416/20234012024-01-18018 January 2024 Cyber Security Inspection Report 05000416/2023401 (Public) IR 05000416/20234032023-11-13013 November 2023 Security Baseline Inspection Report 05000416/2023403 Cover Letter IR 05000416/20230032023-11-0808 November 2023 Integrated Inspection Report 05000416/2023003 IR 05000416/20230052023-08-21021 August 2023 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2023005) IR 05000416/20230022023-08-0808 August 2023 Integrated Inspection Report 05000416/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200050/2023001 IR 05000416/20234042023-08-0707 August 2023 Material Control and Accounting Program Inspection Report 05000416/2023404 IR 05000416/20230912023-07-28028 July 2023 Final Significance Determination of a Green Finding and Notice of Violation; NRC Inspection Report 05000416/2023091 IR 05000416/20230902023-06-27027 June 2023 Public Meeting Notice: Grand Gulf Nuclear Station, Dated IR 05000416/2023090 - Preliminary White Finding Choice Letter ML23122A1632023-05-18018 May 2023 NRC Inspection Report 05000416/2023090 and Preliminary White Finding IR 05000416/20234022023-05-17017 May 2023 Security Baseline Inspection Report 05000416/2023402 IR 05000416/20230012023-05-10010 May 2023 Notice of Violation; Integrated Inspection Report 05000416/2023001 and NRC Investigation Report 4-2022-004 IR 05000416/20243012023-04-12012 April 2023 Notification of NRC Initial Operator Licensing Examination 05000416/2024301 IR 05000416/20230112023-03-0808 March 2023 Design Basis Assurance Inspection Report 05000416/2023011 IR 05000416/20220062023-03-0101 March 2023 Annual Assessment Letter for Grand Gulf Nuclear Station Report 05000416/2022006 IR 05000416/20220042023-02-0101 February 2023 Integrated Inspection Report 05000416/2022004 IR 05000416/20224022023-01-17017 January 2023 Security Baseline Inspection Report 05000416/2022402 (Cover Letter) IR 05000415/20223012022-12-19019 December 2022 NRC Examination Report 05000415/2022301 IR 05000416/20220032022-11-0303 November 2022 Integrated Inspection Report 05000416/2022003 IR 05000416/20224032022-11-0101 November 2022 Security Baseline Inspection Report 05000416 2022403 (Cover Letter Only) IR 05000416/20220132022-10-24024 October 2022 Revised Grand Gulf Nuclear Station Design Basis Assurance Inspection Report 05000416/2022013 IR 05000416/20220502022-10-20020 October 2022 Special Inspection Reactive Report 05000416/2022050 ML22280A0292022-10-11011 October 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000416/2022013 IR 05000416/20223012022-09-30030 September 2022 NRC Initial Operator Licensing Examination Approval 05000416/2022301 IR 05000416/20220052022-08-18018 August 2022 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2022005) IR 05000416/20220022022-08-11011 August 2022 Integrated Inspection Report 05000416/2022002 IR 05000416/20220112022-06-0606 June 2022 Biennial Problem Identification and Resolution Inspection Report 05000416/2022011 IR 05000416/20220012022-05-0909 May 2022 Integrated Inspection Report 05000416/2022001 IR 05000416/20220122022-04-20020 April 2022 License Renewal Phase 1 NRC Inspection Report 05000416/2022012 IR 05000416/20210062022-03-0202 March 2022 Annual Assessment Letter for Grand Gulf Nuclear Station (Report 05000416/2021006) IR 05000416/20210042022-02-0808 February 2022 Integrated Inspection Report 05000416/2021004 IR 05000416/20214202022-02-0707 February 2022 Cover Letter for Grand Nuclear Station, Unit 1 Security Baseline Inspection Report 05000416/2021420 IR 05000416/20200132022-02-0303 February 2022 Amended - Grand Gulf Nuclear Station - Triennial Fire Protection Inspection Report 05000416/2020013 and Notice of Violation ML22011A0992022-01-14014 January 2022 IR 2021012 EOI CO3 ML21349B3372021-12-15015 December 2021 NOV_EA-20-125 21-096 21-110_GG Combined Case IR 05000416/20210402021-11-18018 November 2021 NRC Supplemental Inspection Report 05000416/2021040 and Assessment Follow-Up Letter IR 05000416/20210032021-11-10010 November 2021 Integrated Inspection Report 05000416/2021003 and Independent Spent Fuel Storage Installation Report 07200050/2021001 ML21265A3562021-09-22022 September 2021 Notification of NRC Triennial Heat Exchanger/Sink Performance Inspection (05000416/2021004) and Request for Information IR 05000416/20210052021-09-0101 September 2021 Mid-Cycle Inspection Plan Transmittal Letter for Grand Gulf Nuclear Station (Report 05000416/2021005) 2024-09-09
[Table view] Category:Letter
MONTHYEARML24289A0312024-11-0808 November 2024 – Issuance of Amendments Related to the Removal of License Condition 2.F as Part of the Consolidated Line-Item Improvement Process (CLIIP) IR 05000416/20240032024-11-0606 November 2024 Integrated Inspection Report 05000416/2024003 IR 05000416/20240112024-10-16016 October 2024 – Fire Protection Team Inspection Report 05000416/2024011 ML24263A2712024-09-19019 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements IR 05000416/20240122024-09-17017 September 2024 License Renewal Post Approval Phase 2 Inspection Report 05000416/2024012 ML24257A0172024-09-17017 September 2024 Request for Withholding Information from Public Disclosure Unit 1 ML24254A3602024-09-10010 September 2024 Pre-Submittal Slides for License Amendment Request, Criticality Safety Analysis, Technical Specification 4.3.1, Criticality and Technical Specification 5.5.14, Spent Fuel Storage Rack Neutron Absorber Monitoring Program IR 05000416/20244022024-09-0909 September 2024 Security Baseline Inspection Report 05000416/2024402 05000416/LER-2024-003, Feedwater Inlet Check Valve Incorrectly Determined Operable2024-08-26026 August 2024 Feedwater Inlet Check Valve Incorrectly Determined Operable ML24235A0832024-08-22022 August 2024 Evaluations Performed in Accordance with 10 CFR 50.54(q) for Changes to Emergency Planning Documents IR 05000416/20240052024-08-21021 August 2024 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2024005) ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 ML24176A1202024-07-29029 July 2024 Issuance of Amendment 234 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b IR 05000416/20240022024-07-29029 July 2024 Integrated Inspection Report 05000416/2024002 ML24172A2502024-07-29029 July 2024 – Issuance of Amendment No. 233 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML24204A2432024-07-23023 July 2024 Notification of Cyber Security Baseline Inspection and Request for Information (05000416/2024403) ML24191A2432024-07-0909 July 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operations IR 05000416/20240102024-06-27027 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000416/2024010 ML24156A1762024-06-24024 June 2024 Regulatory Audit Summary in Support of License Amendment Requests to Adopt TSTF-505, Revision 2 and 10 CFR 50.69 (Epids L-2023-LLA-0081 and L-2023-LLA-0080) ML24165A1512024-06-13013 June 2024 Second Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk-Informe ML24163A2652024-06-11011 June 2024 Inservice Inspection Summary Report ML24060A2192024-05-30030 May 2024 Authorization of Alternative to Use EN-RR-01 Concerning Proposed Alternative to Adopt Code Case N-752 05000416/LER-2024-002, Automatic Actuation of Reactor Protection System2024-05-28028 May 2024 Automatic Actuation of Reactor Protection System ML24130A0912024-05-0909 May 2024 Request for Information Letter License Renewal Phase 2 Inspection ML24128A1512024-05-0909 May 2024 Project Manager Assignment ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions IR 05000416/20240012024-05-0202 May 2024 Integrated Inspection Report 05000416 2024001 ML24122C6112024-05-0101 May 2024 Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf. ML24116A0372024-04-25025 April 2024 Report of Technical Specification Bases Changes ML24113A0952024-04-22022 April 2024 Annual Radioactive Effluent Release Report for 2023 ML24113A0972024-04-22022 April 2024 Annual Report of Individual Monitoring - NRC Form 5 for 2023 Per 1 0 CFR 20.2206 ML24107B0402024-04-16016 April 2024 Notification by Entergy Operations, Inc., of Proposed Economic Performance Incentive and Reliance on Post-Event Improvements in Plant Procedures And/Or Methods of Operation in FERC ML24107A8872024-04-16016 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) ML24101A3882024-04-10010 April 2024 Response to Request for Confirmation of Information by the Office of Nuclear Reactor Regulation Proposed Alternative Request EN-RR-22-001 Risk-Informed Categorization and Treatment for Repair ML24100A0692024-04-0909 April 2024 Report of Changes or Errors to 10 CFR 50.46 Analysis ML24094A0992024-04-0303 April 2024 (GGNS) Core Operating Limits Report (COLR) Cycle 25, Revision O ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams 05000416/LER-2024-001, High Pressure Core Spray Inoperable Due to Minimum Flow Valve Failure to Close2024-03-27027 March 2024 High Pressure Core Spray Inoperable Due to Minimum Flow Valve Failure to Close ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24058A3512024-02-28028 February 2024 Notification of Biennial Problem Identification and Resolution Inspection and Request for Information IR 05000416/20230062024-02-28028 February 2024 Annual Assessment Letter for Grand Gulf Nuclear Station - Report 05000416/2023006 IR 05000416/20233012024-02-26026 February 2024 NRC Examination Report 05000416-2023301 05000416/LER-2023-002, Reactor Scram Due to Generator Stator Fault to Ground2024-02-13013 February 2024 Reactor Scram Due to Generator Stator Fault to Ground ML24043A1892024-02-12012 February 2024 Spent Fuel Storage Radioactive Effluent Release Report for 2023 ML24012A1422024-01-31031 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0051 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24043A0732024-01-29029 January 2024 2024-01 Post Examination Comments IR 05000416/20230042024-01-25025 January 2024 Integrated Inspection Report 5000416/2023004 ML24018A0222024-01-18018 January 2024 Core Operating Limits Report (COLR) Cycle 24, Revision 2 2024-09-09
[Table view] |
Text
March 08, 2023
SUBJECT:
GRAND GULF NUCLEAR STATION - DESIGN BASIS ASSURANCE INSPECTION (PROGRAMS) INSPECTION REPORT 05000416/2023011
Dear Brad Kapellas:
On February 16, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Grand Gulf Nuclear Station and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Vincent G. Gaddy, Chief Engineering Branch 1 Division of Operating Reactor Safety Docket No. 05000416 License No. NPF-29
Enclosure:
As stated
Inspection Report
Docket Number:
05000416
License Number:
NPF-29
Report Number:
05000416/2023011
Enterprise Identifier:
I-2023-011-0008
Licensee:
Entergy Operations, Inc.
Facility:
Grand Gulf Nuclear Station
Location:
Port Gibson, MS
Inspection Dates:
January 30, 2023 to February 17, 2023
Inspectors:
D. Reinert, Senior Reactor Inspector
W. Sifre, Senior Reactor Inspector
F. Thomas, Reactor Inspector
Approved By:
Vincent G. Gaddy, Chief
Engineering Branch 1
Division of Operating Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a design basis assurance inspection (programs) inspection at Grand Gulf Nuclear Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
Main article: IP 71111.21
The inspectors reviewed the implementation of the licensees processes for dedicating commercial-grade items/services as basic components and/or for procuring safety-related structures, systems, and components for the following samples:
(1)0099133003 - Coil, Electrical, Contactor, 115V 60HZ (2)0032049772 - Indicator, Dial, 3" Dial, 2-1/2" Stem, 0-200 DEG C - PE 212963 (3)0032205640 - Relay, General Purpose, 10 AMP, 120VAC Coil, Double Pole, Plug In Socket, Polycarbonate Enclosure - PC 217735 (4)0032030229 - Valve, Solenoid, Air Start Solenoid Pipe (5)0032025525 - Dampener, Pulsation, 1/4" NPT, SS, for DIV 3 (6)0032052593 - Lubricant, Mobil DTE 732, 55 Gallon (7)0032164834 - Transmitter, Flow, 0-30"H20, 4-20 ma DC (8)0099019027 - Connector, HN Coaxial, Straight, Plug (9)0032109584 - Gasket, Flanged, 3/4", CGI, GTA Filler Material, 304SS Inner Ring &
Winding, Carbon Steel Outer Ring, 900/1500#, 13/16" ID, 2-3/4" OD, 0.175" Thick (10)002184007 - Relay, Time Delay, Adjustable, Off Delay (11)0032028151 - Fuse, Power, Fast-Acting, 1/4 AMP, 600V, Melamine Cartridge, 0.41" D X 1.5" L (12)0032200718 - Fuse, Single Element, Time Delay, 0.5, 500VAC, Fiber Tube Cartridge, Nickel Plated Brass Endcaps, 13/32" X 1 1/2" (13)0090176058 - Switch, Pressure (14)0080253089 - Switch, Temperature, 125/250VAC, 15A, 100-300 Deg F
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
On February 16, 2023, the inspectors presented the design basis assurance inspection (programs) inspection results to Brad Kapellas and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
CR-GGN-2022-05559, CR-GGN-2022-05709, CR-GGN-
22-06426, CR-GGN-2018-04493, CR-GGN-2019-
07619, CR-GGN-2021-08933, CR-GGN-2017-08792
Corrective Action
Documents
Resulting from
Inspection
CR-GGN-2023-01005, CR-GGN-2023-01012. CR-GGN-
23-01039, CR-GGN-2023-01043, CR-GGN-2023-
01057, CR-GGN-2023-01060
E-1187-007
E31 Leak Detection System, RWCU [Reactor Water
Clean-Up] Flow Circuit, Computer Input
E-1204-023
G33 Reactor Water Clean-Up System, Instrs.
[Instruments], Recorders, Computer Inputs
F03001
Schematic Diag. [Diagram], Lube Oil System (For Tandem
Engine Unit)
D
Drawings
M-1091
P & I Diagram, Combustible Gas Control Systems, Unit 1
Engineering
Changes
93168
Review NQTP-21605, Rev 0 for Approval of Seismic
Testing of Relay, Plug-In, K8, 3PDT by United Controls
INC (UCI)
175154
Fuse, Power, Fast-Acting, 1/4 AMP, 600V, Melamine
Cartridge, 0.41" D X 1.5" L
08/01/2017
176488
Transmitter, Flow, 0-30"H20, 4-20MADC
09/16/2017
176488
Transmitter, Flow, 0-30"H20, 4-20MADC, FLOW, 0-
30"H20, 4-20MADC
09/16/2017
177650
Gasket, Flanged, 3/4", CGI, GTA Filler Material, 304SS
Inner Ring & Winding, Carbon Steel Outer Ring,
900/1500#, 13/16" ID, 2-3/4" OD, 0.175" Thick
11/08/2017
183336
Connector, HN Coaxial, Straight, Plug
04/24/2018
194956
Valve, Solenoid, Air Start Solenoid Pipe
05/17/2019
203177
Switch, Pressure
08/11/2020
210690
Fuse, Single Element, Time Delay, 0.5, 500VAC, Fiber
Tube Cartridge, Nickel Plated Brass Endcaps, 13/32" X 1
1/2"
06/03/2021
71111.21N.03
Engineering
Evaluations
257
Valve, Solenoid, Air Start Solenoid Pipe
11/18/2005
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
2931
Indicator, Dial, 3" Dial, 2-1/2" Stem, 0-200 DEG C
09/22/2021
2963
Switch, Temperature, 125/250VAC, 15A, 100-300 Deg F
10/21/2021
217735
Relay, General Purpose, 10 AMP, 120VAC Coil, Double
Pole, Plug In Socket, Polycarbonate Enclosure
08/17/2022
255
Dampener, Pulsation, 1/4" NPT, SS, FOR DIV 3
2/06/2009
15026-M-632.1
Technical Specification For SGTS [Standby Gas
Treatment System] Electric Heater, Heater Control Panel,
and Instrumentation
4600137
Technical Manual for Installation, Operation and
Maintenance of Byron Jackson Vertical Residual Heat
Removal Pumps
2/28/1994
EQ34.2
Environmental Qualification Documentation Package -
Conax Electrical Conductor Seal Assemblies (ESCAs)
ES-02
Installation Standard - Electrical Standard for Separation,
Fire Protection and Equipment Closures
Miscellaneous
TR-105849
Plant Support Engineering: Generic Seismic Technical
Evaluations of Replacement
Items for Nuclear Power Plants Item Specific Evaluations
04-1-02-1H22-
P118
Panel No.: 1H22-P118
034
06-OP-1P81-M-
0002
HPCS Diesel Generator 13 Functional Test
2
EN-DC-153
Preventive Maintenance Component Classification
EN-DC-306
Acceptance of Commercial-Grade Items/Services in
Safety-Related Applications
EN-DC-313
Procurement Engineering Process
EN-MP-101
Supply Chain Process
EN-MP-111
Inventory Control
EN-MP-112
Shelf Life Program
EN-MP-138
Commercial Grade Dedication Lab Conduct of Operation
Procedures
EN-OP-115-07
Configuration Control
Self-
Assessments
LO-HQNLO-
22-00086
IP 71111.21N.03 - Commercial Grade Dedication Pre-
Inspection Assessment
October 30,
22
Work Orders
00483276, 52950833, 00496155
6