ML23270B189
From kanterella
Jump to navigation
Jump to search
ML23270B189 | |
Person / Time | |
---|---|
Site: | Grand Gulf |
Issue date: | 09/27/2023 |
From: | Hardy J Entergy Operations |
To: | Office of Nuclear Reactor Regulation, Document Control Desk |
References | |
GNRO2023-00023 | |
Download: ML23270B189 (1) | |
Similar Documents at Grand Gulf | |
---|---|
Category:Letter
MONTHYEARIR 05000416/20240112024-10-16016 October 2024
[Table view]– Fire Protection Team Inspection Report 05000416/2024011 ML24263A2712024-09-19019 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24257A0172024-09-17017 September 2024 Request for Withholding Information from Public Disclosure Unit 1 IR 05000416/20240122024-09-17017 September 2024 License Renewal Post Approval Phase 2 Inspection Report 05000416/2024012 ML24254A3602024-09-10010 September 2024 Pre-Submittal Slides for License Amendment Request, Criticality Safety Analysis, Technical Specification 4.3.1, Criticality and Technical Specification 5.5.14, Spent Fuel Storage Rack Neutron Absorber Monitoring Program IR 05000416/20244022024-09-0909 September 2024 Security Baseline Inspection Report 05000416/2024402 05000416/LER-2024-003, Feedwater Inlet Check Valve Incorrectly Determined Operable2024-08-26026 August 2024 Feedwater Inlet Check Valve Incorrectly Determined Operable ML24235A0832024-08-22022 August 2024 Evaluations Performed in Accordance with 10 CFR 50.54(q) for Changes to Emergency Planning Documents IR 05000416/20240052024-08-21021 August 2024 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2024005) ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 ML24176A1202024-07-29029 July 2024 Issuance of Amendment 234 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b ML24172A2502024-07-29029 July 2024 – Issuance of Amendment No. 233 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors IR 05000416/20240022024-07-29029 July 2024 Integrated Inspection Report 05000416/2024002 ML24204A2432024-07-23023 July 2024 Notification of Cyber Security Baseline Inspection and Request for Information (05000416/2024403) ML24191A2432024-07-0909 July 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operations IR 05000416/20240102024-06-27027 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000416/2024010 ML24156A1762024-06-24024 June 2024 Regulatory Audit Summary in Support of License Amendment Requests to Adopt TSTF-505, Revision 2 and 10 CFR 50.69 (Epids L-2023-LLA-0081 and L-2023-LLA-0080) ML24165A1512024-06-13013 June 2024 Second Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk-Informe ML24163A2652024-06-11011 June 2024 Inservice Inspection Summary Report ML24060A2192024-05-30030 May 2024 Authorization of Alternative to Use EN-RR-01 Concerning Proposed Alternative to Adopt Code Case N-752 05000416/LER-2024-002, Automatic Actuation of Reactor Protection System2024-05-28028 May 2024 Automatic Actuation of Reactor Protection System ML24130A0912024-05-0909 May 2024 Request for Information Letter License Renewal Phase 2 Inspection ML24128A1512024-05-0909 May 2024 Project Manager Assignment ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions IR 05000416/20240012024-05-0202 May 2024 Integrated Inspection Report 05000416 2024001 ML24122C6112024-05-0101 May 2024 Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf. ML24116A0372024-04-25025 April 2024 Report of Technical Specification Bases Changes ML24113A0972024-04-22022 April 2024 Annual Report of Individual Monitoring - NRC Form 5 for 2023 Per 1 0 CFR 20.2206 ML24113A0952024-04-22022 April 2024 Annual Radioactive Effluent Release Report for 2023 ML24107B0402024-04-16016 April 2024 Notification by Entergy Operations, Inc., of Proposed Economic Performance Incentive and Reliance on Post-Event Improvements in Plant Procedures And/Or Methods of Operation in FERC ML24107A8872024-04-16016 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) ML24101A3882024-04-10010 April 2024 Response to Request for Confirmation of Information by the Office of Nuclear Reactor Regulation Proposed Alternative Request EN-RR-22-001 Risk-Informed Categorization and Treatment for Repair ML24100A0692024-04-0909 April 2024 Report of Changes or Errors to 10 CFR 50.46 Analysis ML24094A0992024-04-0303 April 2024 (GGNS) Core Operating Limits Report (COLR) Cycle 25, Revision O ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams 05000416/LER-2024-001, High Pressure Core Spray Inoperable Due to Minimum Flow Valve Failure to Close2024-03-27027 March 2024 High Pressure Core Spray Inoperable Due to Minimum Flow Valve Failure to Close ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) IR 05000416/20230062024-02-28028 February 2024 Annual Assessment Letter for Grand Gulf Nuclear Station - Report 05000416/2023006 ML24058A3512024-02-28028 February 2024 Notification of Biennial Problem Identification and Resolution Inspection and Request for Information IR 05000416/20233012024-02-26026 February 2024 NRC Examination Report 05000416-2023301 05000416/LER-2023-002, Reactor Scram Due to Generator Stator Fault to Ground2024-02-13013 February 2024 Reactor Scram Due to Generator Stator Fault to Ground ML24043A1892024-02-12012 February 2024 Spent Fuel Storage Radioactive Effluent Release Report for 2023 ML24012A1422024-01-31031 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0051 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24043A0732024-01-29029 January 2024 2024-01 Post Examination Comments IR 05000416/20230042024-01-25025 January 2024 Integrated Inspection Report 5000416/2023004 IR 05000416/20234012024-01-18018 January 2024 Cyber Security Inspection Report 05000416/2023401 (Public) ML24018A0222024-01-18018 January 2024 Core Operating Limits Report (COLR) Cycle 24, Revision 2 ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 – Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and 2024-09-09 Category:Report MONTHYEARML24235A0832024-08-22022 August 2024
[Table view]Evaluations Performed in Accordance with 10 CFR 50.54(q) for Changes to Emergency Planning Documents ML23325A1422023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23270B1892023-09-27027 September 2023 Evacuation Time Estimate Study ML22011A2982022-01-11011 January 2022 ANS Evaluation Report CNRO-2021-00023, Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L2021-10-0606 October 2021 Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L ML21272A3032021-09-30030 September 2021 Technology Inclusive Content of Application Project (Ticap) for Non-Light Water Reactors Westinghouse Evinci; Micro-Reactor Tabletop Exercise Report ML21237A0512021-08-25025 August 2021 Follow-on Risk Informed Performance Based Implementation Guidance Needed for Advanced Non-Light Water Reactors ML21081A1922021-06-30030 June 2021 Enclosure - USNRC-CNSC Joint Report Concerning X-Energy's Reactor Pressure Vessel Construction Code Assessment GNRO-2021/00011, Revision of Original Report of 10CFR50.59 and Commitments Change Evaluations - July 1, 2018 Through May 21, 20202021-04-19019 April 2021 Revision of Original Report of 10CFR50.59 and Commitments Change Evaluations - July 1, 2018 Through May 21, 2020 ML21272A3382021-04-0101 April 2021 Technology Inclusive Content of Application Project (Ticap) for Non-Light Water Reactors Versatile Test Reactor Ticap Tabletop Exercise Report ML21090A0332021-03-31031 March 2021 Historical Context and Perspective on Allowable Stresses and Design Parameters in ASME Section III, Division 5, Subsection Hb, Subpart B (ANL/AMD-21/1) ML21083A1362021-03-23023 March 2021 Completed Activities ML21083A1442021-03-22022 March 2021 Strategy 6 ML21083A1422021-03-22022 March 2021 Strategy 4 ML21083A1432021-03-22022 March 2021 Strategy 5 ML21083A1382021-03-22022 March 2021 Rulemaking ML21083A1412021-03-22022 March 2021 Strategy 3 ML21083A1392021-03-22022 March 2021 Strategy 1 ML21083A1402021-03-22022 March 2021 Strategy 2 ML21083A1372021-03-22022 March 2021 NEIMA Reporting ML21014A2672021-01-14014 January 2021 Preapplication Engagement to Optimize Application Reviews January 12 Version - Copy ML21075A2752020-12-22022 December 2020 FAQ 20-06 GGNS Scram - Final Approved ML18123A3142018-05-0707 May 2018 Staff Assessment of Flooding Focused Evaluation (CAC No. MF9897; EPID L-2017-JLD-0015) ML18085A5792018-03-26026 March 2018 Proposed Revision of Replacement of Turbine First Stage Pressure Signals with Power Range Neutron Monitoring System Signals ML17290B1372017-10-17017 October 2017 Recommendations for Future Inspection - Replacement Steam Dryer. with GE Hitachi Nuclear Energy Report 0000-0125-6316-R2-NP GNRO-2017/00042, Report Pursuant to 10 CFR 71.95 (a)(3) and (B) of Seven Potential Instances of Noncompliance with Certificate of Compliance No. 9233 for TN-RAM Package2017-07-12012 July 2017 Report Pursuant to 10 CFR 71.95 (a)(3) and (B) of Seven Potential Instances of Noncompliance with Certificate of Compliance No. 9233 for TN-RAM Package GNRO-2017/00038, Focused Evaluation of External Flooding2017-06-27027 June 2017 Focused Evaluation of External Flooding GNRO-2016/00053, Mitigating Strategies Assessment (MSA) for Flooding Submittal2016-12-30030 December 2016 Mitigating Strategies Assessment (MSA) for Flooding Submittal GNRO-2016/00046, Report of 10CFR50.59 Evaluations and Commitment Change Evaluations for the Period July 1, 2014 Through June 30, 20162016-08-23023 August 2016 Report of 10CFR50.59 Evaluations and Commitment Change Evaluations for the Period July 1, 2014 Through June 30, 2016 GNRO-2016/00015, Non-Proprietary Version of MP Machinery and Testing, LLC (Mpm) Proprietary Report 814779, Revs 1 & 2, Neutron Transport Analysis for Grand Gulf Nuclear Station, Previously Included in Letters GNRO-2014/0080 and GNRO-2015/000112016-03-23023 March 2016 Non-Proprietary Version of MP Machinery and Testing, LLC (Mpm) Proprietary Report 814779, Revs 1 & 2, Neutron Transport Analysis for Grand Gulf Nuclear Station, Previously Included in Letters GNRO-2014/0080 and GNRO-2015/00011 ML15259A3422015-08-24024 August 2015 10 CFR 71.95 Report Evaluation Form; Submitted by Fenok, Erwin Resin Solutions, North Anna Power Stations, Et Al GNRO-2014/00072, 2014 Report of Changes and Errors to 10CFR50.462014-11-12012 November 2014 2014 Report of Changes and Errors to 10CFR50.46 GNRO-2014/00060, Entergy'S Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2014-08-26026 August 2014 Entergy'S Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events ML14232A7392014-08-20020 August 2014 Report of 10CFR72.48 Evaluations - July 1, 2012 Through June 30, 2014 ML14098A1752014-05-0101 May 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to Fukushima Dai-Ichi Nuclear Power Plant Accident GNRO-2014/00027, Entergy Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi.2014-03-31031 March 2014 Entergy Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi. ML14007A7182014-02-19019 February 2014 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14042A2972014-02-12012 February 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Grand Gulf Nuclear Station, Unit 1, TAC No.: MF0954 ML13217A0532013-07-24024 July 2013 Summary of Root Cause Evaluation - Apparent Violation of 10CFR54.13 for Grand Gulf License Renewal GNRO-2013/00020, Required Response 2 for Near-Term Task Force Recommendation 2.1: Flooding - Hazard Reevaluation Report2013-03-11011 March 2013 Required Response 2 for Near-Term Task Force Recommendation 2.1: Flooding - Hazard Reevaluation Report CNRO-2013-00002, Responses to NRC Request for Additional Information Regarding Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments2013-01-29029 January 2013 Responses to NRC Request for Additional Information Regarding Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments GNRO-2012/00150, Final Report for Replacement Steam Dryer2012-12-0606 December 2012 Final Report for Replacement Steam Dryer GNRO-2012/00140, Unit No.1 - Flooding Walkdown Report - Entergy'S Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from ..2012-11-26026 November 2012 Unit No.1 - Flooding Walkdown Report - Entergy'S Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from .. GNRO-2012/00141, Attachment 1, Seismic Walkdown Report GGNS-CS-12-00002, Rev. 0, Attachment C, Seismic Walkdown Checklists (Swcs), Page 151 of 345 Through Page 251 of 3452012-11-15015 November 2012 Attachment 1, Seismic Walkdown Report GGNS-CS-12-00002, Rev. 0, Attachment C, Seismic Walkdown Checklists (Swcs), Page 151 of 345 Through Page 251 of 345 ML12352A0712012-11-15015 November 2012 Attachment 1, Seismic Walkdown Report GGNS-CS-12-00002, Rev. 0, Cover Through Attachment C, Seismic Walkdown Checklists (Swcs), Page 150 of 345 ML12352A0692012-11-15015 November 2012 Attachment 1, Seismic Walkdown Report GGNS-CS-12-00002, Rev. 0, Attachment D, Area Walk-by Checklist (Awcs), Page 1 of 167 Through End ML12352A0682012-11-15015 November 2012 Attachment 1, Seismic Walkdown Report GGNS-CS-12-00002, Rev. 0, Attachment C, Seismic Walkdown Checklists (Swcs), Page 252 of 345 Through Page 345 of 345 GNRO-2012/00113, Vibration Data Report2012-09-18018 September 2012 Vibration Data Report GNRO-2012/00109, Stress Analysis Summary Demonstrating That the Nozzle to Safe-End DMW, N06B-KB, Will Perform Its Intended Design Function After Weld Overlay Installation2012-09-0606 September 2012 Stress Analysis Summary Demonstrating That the Nozzle to Safe-End DMW, N06B-KB, Will Perform Its Intended Design Function After Weld Overlay Installation GNRO-2012/00099, Requested Information Vibration Data for the Main Steam Line Piping and Safety Relief Valves 4102 Mwt (105% Pltp2012-08-21021 August 2012 Requested Information Vibration Data for the Main Steam Line Piping and Safety Relief Valves 4102 Mwt (105% Pltp 2024-08-22 Category:Technical MONTHYEARML23270B1892023-09-27027 September 2023
[Table view]Evacuation Time Estimate Study ML21272A3032021-09-30030 September 2021 Technology Inclusive Content of Application Project (Ticap) for Non-Light Water Reactors Westinghouse Evinci; Micro-Reactor Tabletop Exercise Report ML21237A0512021-08-25025 August 2021 Follow-on Risk Informed Performance Based Implementation Guidance Needed for Advanced Non-Light Water Reactors ML21081A1922021-06-30030 June 2021 Enclosure - USNRC-CNSC Joint Report Concerning X-Energy's Reactor Pressure Vessel Construction Code Assessment ML21272A3382021-04-0101 April 2021 Technology Inclusive Content of Application Project (Ticap) for Non-Light Water Reactors Versatile Test Reactor Ticap Tabletop Exercise Report ML21090A0332021-03-31031 March 2021 Historical Context and Perspective on Allowable Stresses and Design Parameters in ASME Section III, Division 5, Subsection Hb, Subpart B (ANL/AMD-21/1) GNRO-2016/00015, Non-Proprietary Version of MP Machinery and Testing, LLC (Mpm) Proprietary Report 814779, Revs 1 & 2, Neutron Transport Analysis for Grand Gulf Nuclear Station, Previously Included in Letters GNRO-2014/0080 and GNRO-2015/000112016-03-23023 March 2016 Non-Proprietary Version of MP Machinery and Testing, LLC (Mpm) Proprietary Report 814779, Revs 1 & 2, Neutron Transport Analysis for Grand Gulf Nuclear Station, Previously Included in Letters GNRO-2014/0080 and GNRO-2015/00011 ML14007A7182014-02-19019 February 2014 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14042A2972014-02-12012 February 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Grand Gulf Nuclear Station, Unit 1, TAC No.: MF0954 GNRO-2012/00150, Final Report for Replacement Steam Dryer2012-12-0606 December 2012 Final Report for Replacement Steam Dryer GNRO-2012/00140, Unit No.1 - Flooding Walkdown Report - Entergy'S Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from ..2012-11-26026 November 2012 Unit No.1 - Flooding Walkdown Report - Entergy'S Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from .. ML12352A0682012-11-15015 November 2012 Attachment 1, Seismic Walkdown Report GGNS-CS-12-00002, Rev. 0, Attachment C, Seismic Walkdown Checklists (Swcs), Page 252 of 345 Through Page 345 of 345 ML12352A0692012-11-15015 November 2012 Attachment 1, Seismic Walkdown Report GGNS-CS-12-00002, Rev. 0, Attachment D, Area Walk-by Checklist (Awcs), Page 1 of 167 Through End GNRO-2012/00141, Attachment 1, Seismic Walkdown Report GGNS-CS-12-00002, Rev. 0, Attachment C, Seismic Walkdown Checklists (Swcs), Page 151 of 345 Through Page 251 of 3452012-11-15015 November 2012 Attachment 1, Seismic Walkdown Report GGNS-CS-12-00002, Rev. 0, Attachment C, Seismic Walkdown Checklists (Swcs), Page 151 of 345 Through Page 251 of 345 ML12352A0712012-11-15015 November 2012 Attachment 1, Seismic Walkdown Report GGNS-CS-12-00002, Rev. 0, Cover Through Attachment C, Seismic Walkdown Checklists (Swcs), Page 150 of 345 GNRO-2012/00109, Stress Analysis Summary Demonstrating That the Nozzle to Safe-End DMW, N06B-KB, Will Perform Its Intended Design Function After Weld Overlay Installation2012-09-0606 September 2012 Stress Analysis Summary Demonstrating That the Nozzle to Safe-End DMW, N06B-KB, Will Perform Its Intended Design Function After Weld Overlay Installation GNRO-2012/00011, Response to Request for Additional Information Regarding Extended Power Uprate2012-02-20020 February 2012 Response to Request for Additional Information Regarding Extended Power Uprate ML11306A0642011-08-31031 August 2011 Gnf S-0000-0136-7814 R0-NP, Rev. 0, Gnf Additional Information Regarding Requested Changes to the Technical Specification SLMCPR, Grand Gulf Cycle 19, Extended Power Uprate. GNRO-2010/00073, Supplemental Information License Amendment Request, Extended Power Uprate2010-11-23023 November 2010 Supplemental Information License Amendment Request, Extended Power Uprate GNRO-2011/00025, NET-287-01, Revision 1, BADGER Test Campaign at Grand Gulf Nuclear Station.2010-10-0101 October 2010 NET-287-01, Revision 1, BADGER Test Campaign at Grand Gulf Nuclear Station. ML1026604082010-09-0808 September 2010 Grid Stability Evaluation GNRO-2010/00061, Transmittal of Report OAR-1-00010, Inservice Inspection Summary Report2010-08-23023 August 2010 Transmittal of Report OAR-1-00010, Inservice Inspection Summary Report ML1026604002010-08-20020 August 2010 GE-Hitachi Nuclear Energy Americas LLC - Affidavit of Edward Schrull Withholding from Public Disclosure Proprietary Report NEDC-33477P ML1017904372010-06-30030 June 2010 0000-0102-0888-RI, Plant-Specific Responses Required by Numac Prnm Retrofit Plus Option III Stability Trip Function Topical Report, (NEDC-3241OP-A) ML0934800442009-12-0404 December 2009 After Action Report/Improvement Plan ML1023505252009-04-30030 April 2009 GPI Data Review, Grand Gulf Nuclear Station ML0913100172009-04-28028 April 2009 Offsite Dose Calculation Manual, Attachment II ML0821900132008-08-0707 August 2008 Monthly Operating Reports Second Quarter 2008 GNRO-2008/00053, GMFS-0000-0086-4470, Revision 1, GE14 Thermal Hydraulic Compatibility with Grand Gulf Legacy Fuel2008-07-31031 July 2008 GMFS-0000-0086-4470, Revision 1, GE14 Thermal Hydraulic Compatibility with Grand Gulf Legacy Fuel ML0820700882008-06-30030 June 2008 NEDO-33383, Revision 1, GEXL97 Correlation Applicable to ATRIUM-10 Fuel. ML0725502452006-07-27027 July 2006 GGNS Calculation JC-Q1E51-N635-1, Rev. 1, Instrument Loop Uncertainty and Setpoint Determination for Loops 1E51-N635A&E RCIC Pump Suction Transfer on Low CST Level (TS 3.3.5.2). ML0725502442006-07-26026 July 2006 GGNS Calculation JC-Q1E22-N654-1, Rev. 3, Instrument Loop Uncertainty and Setpoint Determination for Loops 1E22-N654C&G HPCS Pump Suction Transfer on Low CST Level (TS 3.3.5.1). ML0725502472006-03-27027 March 2006 GGNS Calculation M6.7.013, Rev. 1, Condensate Storage Tank Reserve Capacity. ML0516100882005-06-0909 June 2005 May 2005 Monthly Operating Report for Grand Gulf Nuclear Station GNRO-2003/00029, One Time Extension on Integrated Leak Rate Test & Drywell Bypass Test Interval2003-05-12012 May 2003 One Time Extension on Integrated Leak Rate Test & Drywell Bypass Test Interval ML0230105972002-09-19019 September 2002 Part 5 of 7 - GE BWR/4 Advanced Course R-504B ML0230104802002-09-19019 September 2002 Part 2 of 7 - GE BWR/4 Advanced Course R-504B ML18233A1151982-03-0202 March 1982 (1982-03-02) Letter Study of Hydrogen Control at Grand Gulf (003) ML18233A1181982-01-21021 January 1982 (1982-01-21) Letter Investigations Into Nature and Effects of Assummed Hydrogen Detonations in Grand Gulf 2023-09-27 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML23270B189&oldid=3694762"