Category:Inspection Plan
MONTHYEARML24023A3242024-01-23023 January 2024 Inservice Inspection Request for Information ML23348A3712023-12-14014 December 2023 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report (05000416/2024011) and Request for Information IR 05000416/20230052023-08-21021 August 2023 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2023005) IR 05000416/20220062023-03-0101 March 2023 Annual Assessment Letter for Grand Gulf Nuclear Station Report 05000416/2022006 ML22312A5832022-11-0808 November 2022 Notification of Cyber Security Baseline Inspection and Request for Information 05000416/2023401 IR 05000416/20220052022-08-18018 August 2022 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2022005) ML22110A1172022-04-19019 April 2022 (GG) 2022 Emergency Preparedness (EP) Program Inspection RFI Sdh 041922 IR 05000416/20210062022-03-0202 March 2022 Annual Assessment Letter for Grand Gulf Nuclear Station (Report 05000416/2021006) ML22075A3682022-02-14014 February 2022 2022 PIR Request for Information.Pdf ML21327A0842021-11-22022 November 2021 ISI RFI IR 05000416/20210052021-09-0101 September 2021 Mid-Cycle Inspection Plan Transmittal Letter for Grand Gulf Nuclear Station (Report 05000416/2021005) ML21179A1202021-06-28028 June 2021 Notification of NRC Supplemental Inspection of Action Matrix Column 3 (Degraded Performance) Inputs and Request for Information ML21158A0822021-06-0707 June 2021 Notification of Inspection (NRC Inspection Report 05000416/2021003) and Request for Information ML21106A2232021-04-16016 April 2021 IR 2021402 Document Request List ML21074A0822021-03-15015 March 2021 Notification of Evaluations of Changes, Tests, and Experiments Inspection (Inspection Report 05000416/2021002) and Request for Information ML21061A3352021-02-25025 February 2021 Request for Information: Grand Gulf Nuclear Station, Dated December 4, 2020; Inspection Report 05000416-2021001, Occupational Radiation Safety Inspection-2, 4 ML20363A1462020-12-22022 December 2020 Request for Information: Grand Gulf EP Exercise Inspection - March 2021 ML20258A0202020-09-0909 September 2020 EP Program Inspection RFI, Request for Information to Support and Prepare for Emergency Preparedness (EP) Program Inspection Scheduled to Occur the Week of November 16, 2020 ML20199M2352020-07-17017 July 2020 Notification of NRC Design Bases Assurance Inspection (Teams) (Inspection Report 05000416/2020012) and Initial Request for Information ML20155K7172020-06-0303 June 2020 Notification of NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000416/2020013) and Request for Information ML20125A3802020-05-0404 May 2020 Request for Information, Inspection Date: July 20-24, 2020 ML20055E1562020-03-0303 March 2020 GG2019006 Annual Assessment Letter ML19346E2892019-12-11011 December 2019 ISI Request for Information ML19302E1102019-10-29029 October 2019 Document Request - GG 95001 - July 15 2019 ML19302E1082019-10-29029 October 2019 Document Request - GG 95001 - August 2 2019 IR 05000416/20190052019-08-30030 August 2019 Updated Inspection Plan for Grand Gulf Nuclear Station, Report 05000416/2019005 ML19148A5252019-05-28028 May 2019 Notification of Nrc Design Bases Assurance Inspection (Programs) ((05000416/2019010) and Initial Request for Information IR 05000416/20180062019-03-0404 March 2019 Annual Assessment Letter for Grand Gulf Nuclear Station (Report 05000416/2018006) ML19063B4882019-03-0404 March 2019 Notification of NRC Triennial Heat Sink Performance Inspection (05000416/2019002) and Request for Information ML19003A3812018-12-31031 December 2018 Notification of Cyber Security Inspection Report 05000416/2019410, and Request for Information ML18283A0622018-10-10010 October 2018 Notification of Evaluations of Changes, Tests, and Experiments Inspection (05000416/2018004) and Request for Information IR 05000416/20180052018-08-31031 August 2018 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2018005) IR 05000416/20170062018-03-0101 March 2018 Annual Assessment Letter for Grand Gulf Nuclear Station (Report 05000416/2017006) ML17243A3062017-08-28028 August 2017 Updated Non-Public Security Inspection Plan for Grand Gulf Nuclear Station, Unit 1 IR 05000416/20170052017-08-28028 August 2017 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2017005) IR 05000416/20160062017-03-0101 March 2017 Annual Assessment Letter for Grand Gulf Nuclear Station (Report 05000416/2016006) ML16320A2082016-11-14014 November 2016 Notification of an NRC Triennial Fire Protection Baseline Inspection (NRC Inspection Report 05000416/2017008) and Request for Information IR 05000416/20160052016-09-12012 September 2016 Errata for Mid-Cycle Assessment Letter for Grand Gulf Nuclear Station (Report 05000416/2016005) IR 05000416/20164012016-08-31031 August 2016 Non-Public Security Inspection Plan for Grand Gulf Nuclear Station (NRC Physical Security Inspection Report Number 05000416/2016401) ML16242A3352016-08-31031 August 2016 Mid-Cycle Assessment Letter for Grand Gulf Nuclear Station (Report 05000416/2016005) IR 05000416/20150062016-03-0202 March 2016 Annual Assessment Letter for Grand Gulf Nuclear Station (Report 05000416/2015006) IR 05000416/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Grand Gulf Nuclear Station (Report 05000416/2015005) ML15132A7112015-05-11011 May 2015 Notification of NRC Component Design Bases Inspection (05000416/2015007) and Initial Request for Information IR 05000416/20144022014-09-0202 September 2014 Non-Public Security Inspection Plan for Grand Gulf Nuclear Station (NRC Physical Security Inspection Report Number 05000416/2014402) IR 05000416/20140062014-09-0202 September 2014 Mid-Cycle Assessment Letter for Grand Gulf Nuclear Station (Report 05000416/2014006) IR 05000416/20130012014-03-0404 March 2014 IR 05000416-13-001, 02/11/2014, Grand Gulf, Annual Assessment Letter ML13350A0362013-12-11011 December 2013 Notification of NRC Triennial Fire Protection Baseline Inspection (NRC Inspection Report 05000416-14-007) and Request for Information IR 05000416/20130062013-09-0303 September 2013 Mid-Cycle Assessment Letter for Grand Gulf Nuclear Station (Report 05000416/2013006) IR 05000416/20128012013-03-0404 March 2013 Annual Assessment Letter for Grand Gulf Nuclear Station (Report 05000416/2012801) IR 05000416/20120062012-09-0404 September 2012 Letter Mid-Cycle Assessment Letter for Grand Gulf Nuclear Station (Report 05000416-12-006) 2024-01-23
[Table view] Category:Letter
MONTHYEARML24012A1422024-01-31031 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0051 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000416/20230042024-01-25025 January 2024 Integrated Inspection Report 5000416/2023004 ML24018A0222024-01-18018 January 2024 Core Operating Limits Report (COLR) Cycle 24, Revision 2 IR 05000416/20243012024-01-16016 January 2024 NRC Initial Operator Licensing Examination Approval 05000416/2024301 ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML23348A3712023-12-14014 December 2023 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report (05000416/2024011) and Request for Information ML23340A2222023-12-13013 December 2023 Project Manager Assignment ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1422023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000416/20234032023-11-13013 November 2023 Security Baseline Inspection Report 05000416/2023403 Cover Letter ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000416/20230032023-11-0808 November 2023 Integrated Inspection Report 05000416/2023003 ML23270B9932023-09-29029 September 2023 Request to Update ASME Boiler & Pressure Vessel Code Relief Request SE with NRC-Approved Revision of Bwrip Guidelines (GG-ISI-020 & RBS-ISI-019) (EPID L-2022-LLR-0090) - Non-Proprietary ML23270B1892023-09-27027 September 2023 Evacuation Time Estimate Study ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure ML23240A3952023-08-28028 August 2023 Reply to a Notice of Violation; EA-23-019 IR 05000416/20230052023-08-21021 August 2023 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2023005) ML23226A1002023-08-18018 August 2023 Regulatory Audit in Support of License Amendment Requests to Adopt TSTF-505, Revision 2, and 10 CFR 50.69 IR 05000416/20230022023-08-0808 August 2023 Integrated Inspection Report 05000416/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200050/2023001 IR 05000416/20234042023-08-0707 August 2023 Material Control and Accounting Program Inspection Report 05000416/2023404 IR 05000416/20230912023-07-28028 July 2023 Final Significance Determination of a Green Finding and Notice of Violation; NRC Inspection Report 05000416/2023091 ML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions ML23166B0712023-06-15015 June 2023 Reply to Notice of Violation EA-22-104 and EA-22-115 ML23166B0662023-06-15015 June 2023 Response to NRC Integrated Inspection Report 05000416/2023001 ML23159A2302023-06-0808 June 2023 Response to Request for Additional Information Concerning Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019) GNRO-2023/00014, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-06-0606 June 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b GNRO-2023/00015, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-06-0606 June 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML23122A1632023-05-18018 May 2023 NRC Inspection Report 05000416/2023090 and Preliminary White Finding IR 05000416/20234022023-05-17017 May 2023 Security Baseline Inspection Report 05000416/2023402 ML23110A8002023-05-10010 May 2023 Notice of Violation; Integrated Inspection Report 05000416/2023001 and NRC Investigation Report 4-2022-004 ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000416/20230012023-05-10010 May 2023 Notice of Violation; Integrated Inspection Report 05000416/2023001 and NRC Investigation Report 4-2022-004 ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML23117A0422023-04-27027 April 2023 Annual Radioactive Effluent Release Report (ARERR) ML23111A2132023-04-21021 April 2023 Responses to RAI Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities ML23110A1122023-04-20020 April 2023 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G ML23110A0552023-04-20020 April 2023 Annual Radiological Environmental Operating Report (AREOR) ML23103A1022023-04-13013 April 2023 Annual Report of Individual Monitoring - NRC Form 5 for 2022 Per 10 CFR 20.2206 ML23102A1482023-04-12012 April 2023 Notification of NRC Initial Operator Licensing Examination 05000416/2024301 ML23089A0602023-03-30030 March 2023 Entergy Operations, Inc. - Fleet Project Manager Assignment ML23088A3922023-03-29029 March 2023 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML23079A2772023-03-21021 March 2023 U.S. Nuclear Regulatory Commission Presentation at the May 1, 2023, Port Gibson City Council Meeting ML23080A2882023-03-21021 March 2023 Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) Entergy Operations, Inc IR 05000416/20230112023-03-0808 March 2023 Design Basis Assurance Inspection Report 05000416/2023011 2024-01-31
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23348A1222023-12-14014 December 2023 NRR E-mail Capture - Grand Gulf, River Bend, and Waterford, Unit 3 - 2nd Round of Official RAIs for RR EN-RR-22-001, Use ASME Code Case N-752, Risk Informed Categorization for Class 2 and 3 Systems ML23116A1462023-04-26026 April 2023 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Final RAI for Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019) ML23059A0742023-02-27027 February 2023 Information Request, Security IR 2023402 ML22353A6122022-12-19019 December 2022 March 2023 Emergency Preparedness Exercise Inspection - Request for Information ML22271A8572022-10-0303 October 2022 Notification of Commercial Grade Dedication Inspection (05000416/2023011) and Request for Information ML22110A1172022-04-19019 April 2022 (GG) 2022 Emergency Preparedness (EP) Program Inspection RFI Sdh 041922 ML21179A1202021-06-28028 June 2021 Notification of NRC Supplemental Inspection of Action Matrix Column 3 (Degraded Performance) Inputs and Request for Information ML21074A0822021-03-15015 March 2021 Notification of Evaluations of Changes, Tests, and Experiments Inspection (Inspection Report 05000416/2021002) and Request for Information ML20363A1462020-12-22022 December 2020 Request for Information: Grand Gulf EP Exercise Inspection - March 2021 ML20258A0202020-09-0909 September 2020 EP Program Inspection RFI, Request for Information to Support and Prepare for Emergency Preparedness (EP) Program Inspection Scheduled to Occur the Week of November 16, 2020 ML20260H4422020-09-0808 September 2020 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Official RAIs for RR Associated with Updating ASME Code RR SEs with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020 and RBS-ISI-019) ML20155K7172020-06-0303 June 2020 Notification of NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000416/2020013) and Request for Information ML20150A6012020-05-29029 May 2020 NRR E-mail Capture - Grand Gulf - Official RAI for LAR Associated with Containment ILRT Interval Change from 10 Years to 15 Years ML19302E1082019-10-29029 October 2019 Document Request - GG 95001 - August 2 2019 ML19078A3772019-03-19019 March 2019 NRR E-mail Capture - Grand Gulf - Official Rais for Relief Request GG-ISI-023, Inservice Inspection Impracticality, Limited Coverage Examinations During the Third 10-Year Inservice Inspection Interval ML19063B4882019-03-0404 March 2019 Notification of NRC Triennial Heat Sink Performance Inspection (05000416/2019002) and Request for Information ML18304A4602018-10-31031 October 2018 NRR E-mail Capture - Final Request for Additional Information - TSTF-425 (L-2018-LLA-0106) ML18250A3042018-08-30030 August 2018 NRR E-mail Capture - Final Request for Additional Information - Emergency Action Level Scheme Change (L-2018-LLA-0116) ML18250A3032018-08-0101 August 2018 NRR E-mail Capture - Correction: Draft RAI - EAL Scheme Change (L-2018-LLA-0116) ML18187A3292018-07-20020 July 2018 Request for Additional Information, Request to Revise Updated Final Safety Analysis Report to Incorporate Tornado Missile Risk Evaluator Methodology Into Licensing Basis ML18138A4682018-05-23023 May 2018 Supplemental Information Needed for Acceptance of Request for Licensing Action Adoption of TSTF-425, Relocate Surveillance Frequencies to License Control ML18058A0572018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to J. Giddens Request for Additional Information Regarding Entergy Operations, Inc.'S Decommissioning Funding Plan Update) ML17257A1422017-09-14014 September 2017 NRR E-mail Capture - Grand Gulf - Official Requests for Additional Information (Rais) for RR GG-ISI-020 to Use BWRVIP Guidelines ML17235B1752017-08-23023 August 2017 NRR E-mail Capture - Grand Gulf - Official RAI for Relief Request GG-ISI-021 Associated with Fourth Interval Inservice Inspection Using Code Case N-702 ML17214A0992017-08-0202 August 2017 NRR E-mail Capture - Grand Gulf - Official RAIs for LAR Associated with One Cycle Extension of Appendix J Type a ILRT and Drywell Bypass Test Interval ML17142A2582017-05-19019 May 2017 Notification of NRC Design Bases Assurance Inspection (05000416/2017007) and Initial Request for Information ML16181A1122016-07-12012 July 2016 Request for Additional Information on Severe Accident Mitigation Alternatives for the Review of the Grand Gulf Nuclear Station, Unit 1, License Renewal Application Environmental Review ML16117A1862016-04-26026 April 2016 Entergy Fleet Relief Request EN-ISI-15-1 Request for Additional Information - 04/26/16 Email from R. Guzman to G. Davant (CAC Nos. MF7133-MF7136) ML16013A0642016-01-13013 January 2016 NRR E-mail Capture - Request for Additional Information Entergy CNRO-2015-00023 - Revision to Entergy Quality Assurance Program Manual (Fleet Submittal CAC Nos. MF7086-MF7097) ML15341A1662015-12-0707 December 2015 NRR E-mail Capture - Entergy Fleet RR-EN-15-1, Request for Additional Information (CACs MF6341-MF6349) ML15286A1082015-10-28028 October 2015 Requests for Additional Information for the Review of the Grand Gulf Nuclear Station, License Renewal Application ML15261A5652015-09-24024 September 2015 Request for Additional Information Regarding Proposed Revision of Technical Specifications for Containment Leak Rate Testing ML15085A4932015-04-0606 April 2015 Request for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application, Set 52 GNRO-2015/00002, Response to Electronic Request for Additional Information Regarding Modification of Technical Specification (TS) 3.8.4, DC Sources Operating Surveillance Requirements (Srs) 3.8.4.2 and 3.8.4.5. Amendment Request Dated 12/9/20142015-03-27027 March 2015 Response to Electronic Request for Additional Information Regarding Modification of Technical Specification (TS) 3.8.4, DC Sources Operating Surveillance Requirements (Srs) 3.8.4.2 and 3.8.4.5. Amendment Request Dated 12/9/2014 ML15036A5642015-02-18018 February 2015 Updated Fluence Methodology License Amendment Request Unacceptable with Opportunity to Supplement GNRO-2014/00079, Request for Additional Information Regarding Request for Adoption of TSTF-423, Revision 1, Change in Technical Specification End States (CE-NPSD-1186)2014-11-13013 November 2014 Request for Additional Information Regarding Request for Adoption of TSTF-423, Revision 1, Change in Technical Specification End States (CE-NPSD-1186) GNRO-2014/00076, Response to Request for Additional (RAI) Set 51 Dated September 11, 20142014-11-0606 November 2014 Response to Request for Additional (RAI) Set 51 Dated September 11, 2014 GNRO-2014/00031, Response to Electronic Request for Additional Information Regarding Maximum Extended Load Line Limit Plus Amendment Request, Dated 3/18/20142014-04-11011 April 2014 Response to Electronic Request for Additional Information Regarding Maximum Extended Load Line Limit Plus Amendment Request, Dated 3/18/2014 ML13318A8052014-01-0202 January 2014 Request for Additional Information for the Review of the Grand Gulf Nuclear Station, License Renewal Application (TAC No. ME7493) - Set 50 ML13353A6572013-12-19019 December 2013 Licensed Operator Positive Fitness-For-Duty Test ML13345A1822013-12-19019 December 2013 Supplemental Information Needed for Acceptance of Licensing Action, Request to Revise Technical Specification to Allow Operation in Expanded Maximum Extended Load Line Limit Analysis Plus (Mellla+) Domain ML13316B9862013-11-25025 November 2013 Interim Staff Evaluation and Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) ML13263A2252013-11-21021 November 2013 LRA Draft RAI Set 48 ML13304B4182013-11-0101 November 2013 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns ML13260A0062013-09-16016 September 2013 Email, Request for Additional Information, Round 3, Request to Revise Technical Specifications and Surveillance Requirements to Support Operation with a 24-Month Fuel Cycle in Accordance with Generic Letter 91-04 ML13238A2342013-09-12012 September 2013 Requests for Additional Information for the Review of the Grand Gulf Nuclear Station, License Renewal Application (TAC No. ME7493) - Set 49 ML13227A3942013-08-28028 August 2013 Request for Additional Information for the Review of the Grand Gulf Nuclear Station, License Renewal Application (TAC No. ME7493) - Set 47 ML13226A1902013-08-14014 August 2013 Request for Additional Information Email, Round 2, Request to Revise FOL to Delete 2.C(32), Partial Feedwater Heating, to Allow Plant to Operate with Final Feedwater Temperature Reduction at End of Fuel Cycle ML13207A1242013-07-30030 July 2013 Request for Additional Information, Overall Integrated Plan in Response to 3/12/2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051) ML13149A3662013-05-29029 May 2013 Request for Additional Information Email Decommissioning Funding Status Report 2023-04-26
[Table view] |
See also: IR 05000416/2020013
Text
June 3, 2020
Mr. Eric Larson, Site Vice President
Entergy Operations, Inc.
Grand Gulf Nuclear Station
P.O. Box 756
Port Gibson, MS 39150
SUBJECT: GRAND GULF NUCLEAR STATION - NOTIFICATION OF NRC
FIRE PROTECTION BASELINE INSPECTION (NRC INSPECTION
REPORT 05000416/2020013) AND REQUEST FOR INFORMATION
Dear Mr. Larson:
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC),
Region IV staff will conduct a triennial fire protection baseline inspection at your Grand Gulf
Nuclear Station in August 2020. The inspection team will be comprised of three reactor
inspectors from the NRC Region IV office. The inspection will be conducted in accordance with
Inspection Procedure 71111, Attachment 21N.05, Fire Protection Team Inspection, the NRCs
baseline fire protection inspection procedure.
The schedule for the inspection is as follows:
- Information gathering visit: July 21 and 22, 2020
- Onsite inspection: August 10- 4 and August 24-28, 2020
The purpose of the information gathering visit is to obtain information and documentation
needed to support the inspection and to become familiar with the fire protection program, fire
protection features, post-fire safe shutdown capabilities and plant layout.
The team lead and one inspector will participate in the information gathering visit to select the
scope of structures, systems, and components for evaluation, identify additional documents
needed to support the inspection, obtain unescorted access, and meet with the key personnel
who will support the inspection. The fire inspection sample selection will require a walkdown of
fire areas in company with key personnel from your staff. The enclosure to this letter provides
an initial list of the documents the team will need for their review. We request that your staff
transmit copies of the documents listed in the enclosure to the NRC Region IV office in
preparation for the inspection. Please send this information so that it will arrive in the NRC
Region IV office by the dates listed in the enclosure.
During the information gathering visit, the team leader will also discuss the following inspection
support administrative details: (1) office space size and location; (2) specific documents
requested to be made available to the team in their office spaces; (3) arrangements for reactor
E. Larson 2
site access (including radiation protection training, security, safety, and fitness for duty
requirements); and (4) the availability of knowledgeable plant staff and licensing organization
personnel to serve as points of contact during the inspection.
We request that during the on-site inspection weeks you ensure that copies of analyses,
evaluations, or documentation regarding the implementation and maintenance of the station fire
protection program, including the success path necessary to achieve and maintain safe
shutdown conditions, be readily accessible to the team for their review. Of specific interest for
the fire protection portion of the inspection are those documents which establish that your fire
protection program satisfies NRC regulatory requirements and conform to applicable NRC and
industry fire protection guidance (i.e., fire protection compliance assessment documents). Also,
personnel should be available at the site during the inspection who are knowledgeable
regarding those plant systems required to achieve and maintain safe and stable plant
conditions, reactor plant fire protection systems and features, and the station fire protection
program and its implementation.
The team would like to perform a walkthrough of a sample of post-fire safe shutdown
procedures with qualified operators in the plant during the week of August 10, 2020. Please put
us in contact with the appropriate personnel for planning the walkthroughs during the onsite
information gathering trip. The team would like to observe an unannounced fire brigade drill in
the plant, if possible, during the week of August 24, 2020. Please put us in contact with the
appropriate personnel for planning fire brigade drills during the onsite information gathering trip.
PAPERWORK REDUCTION ACT STATEMENT
This letter contains mandatory information collections that are subject to the Paperwork
Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB)
approved these information collections (approval number 3150-0011). Send comments
regarding this information collection to the Information Services Branch, Office of the Chief
Information Officer, Mail Stop: T6 A10M, U.S. Nuclear Regulatory Commission, Washington,
DC 20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office
of Information and Regulatory Affairs, NEOB-10202, (3150-0011) Office of Management and
Budget, Washington, DC 20503.
Public Protection Notification
The NRC may not conduct nor sponsor, and a person is not required to respond to, a request
for information or an information collection requirement unless the requesting document
displays a currently valid OMB control number.
This letter and its enclosure will be made available for public inspection and copying at
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
E. Larson 3
Your cooperation and support during this inspection will be appreciated. If you have questions
concerning this inspection or the inspection teams information or logistical needs, please
contact me in the Region IV office at (817) 200-1114 or Nnaerika.Okonkwo@nrc.gov.
Sincerely,
Nnaerika Okonkwo
Nnaerika Okonkwo, Reactor Inspector
Engineering Branch 2
Division of Reactor Safety
Docket No. 05000416
License No. NPF-29
Enclosure:
Triennial Fire Protection Inspection
Document Request
cc w/ encl: Distribution via LISTSERV
ML20155K717
SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:
By: NPO Yes No Publicly Available Sensitive NRC-002
OFFICE RI:EB2
NAME NOkonkwo
SIGNATURE /RA/
DATE 6/3/2020
Triennial Fire Protection Inspection Document Request
The documents and information requested in this enclosure should generally be made available
to the inspection team prior to the inspection. Electronic format is preferred, except where
specifically noted. If electronic files are made available via a secure document management
service, then the remote document access must allow inspectors to download, save, and print
the documents.
If a secure document management service is utilized, it is recommended that a separate folder
be used corresponding to each item listed below. It is recommended that multiple documents
within each folder be individually entered and combined into a compressed (ZIP) file which is
then uploaded into the same folder. Documents should be identified by both document number
and noun name. Electronic media on compact disc or paper records (hard copy) are also
acceptable.
Where ANSI C-size paper (17 X 22) drawings are requested, please prepare two copies.
Retain one copy on site for the teams use during the inspection weeks. Send one copy to the
team leader at the NRC Region IV office.
To allow review before the on-site information gathering visit, the documents requested in items
A.1 thru A.18 should be made available to the team no later than June 22, 2020.
Based on review of the documentation, the team leader will identify the scope for the inspection
prior to the end of the on-site information gathering visit or in-office review of the information
obtained.
To allow review before the on-site inspection weeks, the remaining requested documents
should be made available to the team no later than August 3, 2020.
This document request is based on typical documents that a generic plant might have. As such,
this generic document request is not meant to imply that any specific plant is required to have all
the listed documents. It is recognized that some documents listed below may not be available
for your plant. In addition, the document titles listed below are based on typical industry
document names; your plant-specific document titles may vary.
Enclosure
A. DESIGN AND LICENSING BASIS DOCUMENTS
A.1 The current version of the Fire Protection Program and Fire Hazards Analysis.
A.2 Post-fire safe shutdown analysis and the supporting calculations that
demonstrate acceptable plant response.
A.3 The fire protection probabilistic risk assessment or portions of the plants
individual plant examination for external events (IPEEE) report addressing fire
events. Also, include the results of any post-IPEEE reviews and listings of
actions taken/plant modifications conducted in response to IPEEE information
that relate to fire risk.
A.4 Licensing basis documents for fire protection (safety evaluation reports, pertinent
sections of the final safety analysis report, exemptions, deviations, letters to/from
the NRC regarding fire protection/fire safe shutdown, etc.).
A.5 List of post-fire safe shutdown systems and components (i.e., safe shutdown
equipment list).
A.6 List of fire areas with automatic fire suppression systems. Include a description of
the suppression agent used.
A.7 A list, with descriptions, of design change packages performed since the last fire
protection team inspection associated with fire protection or post-fire safe
shutdown systems.
A.8 A list, with descriptions, of any fire protection program changes and evaluations
(not limited to Generic Letter 86-10 evaluations) performed since the last fire
protection team inspection.
A.9 Facility Operating License.
A.10 Technical Specifications (electronic format only).
A.11 Updated Final Safety Analysis Report (electronic format only).
A.12 Fire Protection System(s) Design Basis Document.
A.13 A list of the ten most risk significant plant systems for core damage frequency
from the fire protection probabilistic risk assessment (if available) or the internal
events probabilistic risk assessment.
A.14 A list of the ten most risk significant plant systems for large early release
frequency from the fire protection probabilistic risk assessment (if available) or
the internal events probabilistic risk assessment.
2
A.15 Plant layout drawings which identify: (electronic format and ANSI C-size paper
drawings)
- Plant fire area boundaries
- Combustible control zone drawings
- Areas protected by automatic fire suppression and detection
A.16 For local manual operator actions, provide the following:
- Manual Action Feasibility Study
- Operator Time Critical Action Program
- Time lines for time-critical manual actions
A.17 Organization charts of site personnel down to the level of fire protection staff
personnel.
A.18 A contact list of key site personnel who will be supporting this inspection, giving
the office location and phone number onsite.
B. GENERAL PLANT DESIGN DOCUMENTS
B.1 Piping and instrumentation diagrams (P&IDs) and legend list for components
used to achieve and maintain post-fire safe shutdown for the sample systems or
fire areas selected (electronic format and C-size paper drawings).
B.2 Piping and instrumentation diagrams and legend list for fire protection systems,
including the fire water supply; water suppression sprinklers; and deluge,
gaseous suppression systems for the sample systems or fire areas selected
(electronic format and C-size paper drawings).
B.3 AC and DC electrical system single line diagrams, from off-site power down to
the highest safety-related bus level (typically 4kV, EDG bus) (electronic format
and C-size paper drawings).
B.4 Single line diagrams for motor control centers (MCCs) that supply post-fire
nuclear safety component loads for the sample systems or fire areas selected
(electronic format and C-size paper drawings).
B.5 Equipment location drawings which identify the physical plant locations of post-
fire safety shutdown equipment for the sample systems or fire areas selected
(electronic format and C-size paper drawings).
C. CLASSIC FIRE PROTECTION
C.1 Copy of fire protection program implementing procedures (e.g., administrative
controls, surveillance testing, and fire brigade).
C.2 List with descriptions of calculations and engineering analyses, studies, or
evaluations for the fire protection system, including the fire water system.
3
C.3 Last two completed surveillances of fire protection features for the sample
systems or fire areas selected (detection, suppression, damper inspections,
damper tests, penetration inspections, barrier inspections, etc.).
C.4 List with descriptions of routine tests, surveillances, and preventive maintenance
on fire pumps, including pump controllers and batteries.
C.5 Last two completed annual fire pump pressure and flow tests with a complete
copy of the test procedure.
C.6 Last two completed monthly and/or quarterly fire pump tests with a complete
copy of the test procedure.
C.7 Last two completed fire water system flow tests and flushes with a complete copy
of the test procedure.
C.8 For fire brigade drills, provide the following:
- Last five fire brigade drill critiques
- Last drill critique for a drill with off-site fire department support
- Last unannounced drill critique
- Last back-shift drill critique
- Dates, shifts, and locations of unannounced drills for last three years
- Summary of any unsatisfactory drill performance items for last three years
- Last unannounced drill critique by a qualified individual independent of the
licensees staff
C.9 For fire brigade equipment provide the following:
- Procedure for inventory and inspection
- Most recent inspection and inventory results
C.10 Fire Brigade Qualifications, including self-contained breathing apparatus, (SCBA)
and training lesson plans.
C.11 Copy of the evaluation or analysis of the effects of fire suppression activities on
the ability to achieve safe and stable conditions for the sample systems or fire
areas selected demonstrating:
- The automatic or manual actuation of a suppression system, due to a fire in a
single location, will not indirectly cause damage to the success path
- The inadvertent actuation or rupture of a suppression system will not
indirectly cause damage to the success path
- Adequate drainage for areas protected by water suppression systems
- The hydrostatic rating of any floor penetration seals installed within the fire
areas that are credited with keeping water from leaking into fire areas below
C.12 Pre-fire plans for all fire areas.
4
C.13 Impairment Log (at start of inspection) for fire protection features that are out of
service.
C.14 List of penetration seal work, re-work, or installation activities, in the last three
years.
C.15 List of fire wrap work, rework, or installation activities, in the last three years.
C.16 Fire protection system health reports for the two most recent quarters.
C.17 Fire protection program health reports for the two most recent quarters.
C.18 Licensee evaluations of industry operating experience concerning fire protection
issues completed in the last three years.
C.19 List of fire event analysis reports for the last three years.
C.20 Fire protection program requirements (e.g., limiting conditions for operation,
surveillance test requirements) covered by technical specifications, the technical
requirements manual, the updated final safety analysis report, procedures or
similar documents.
C.21 List of applicable NFPA codes and standards and issuance dates (i.e., codes of
record).
C.22 A list or document identifying any deviations from the NFPA codes of record.
D. ELECTRICAL
D.1 Electrical system health reports for the two most recent quarters.
D.2 Surveillance procedures and last surveillance demonstrating operability of
components required for alternative shutdown.
E. OPERATIONS
E.1 List with descriptions of licensed operator Job Performance Measures (JPMs) for
operator actions required to achieve and maintain post-fire safe shutdown.
E.2 List with descriptions of non-licensed operator training associated with non-
licensed operator actions to achieve and maintain post-fire nuclear safe
shutdown (including JPMs, in-field training walkdowns, simulations, or initial
qualification).
E.3 Lesson plans for post-fire safe shutdown training for licensed and non-licensed
operators.
E.4 Thermal hydraulic calculation or analysis that determines the time requirements
for time-critical manual operator actions.
5
E.5 Operating procedures to achieve and maintain post-fire safe shutdown from the
control room and requiring a control room evacuation.
E.6 For safe shutdown equipment and tools, provide the following:
- Procedure for inventory and inspection
- Most recent inspection and inventory results
E.7 List with descriptions of procedures that implement cold shutdown repairs, if
required.
E.8 For cold shutdown repairs, if required, provide the following:
- Procedure for inventory and inspection (i.e., needed tools, material, etc.)
- Most recent inspection and inventory results
F. ADMINISTRATIVE CONTROL, OVERSIGHT, AND CORRECTIVE ACTION
PROGRAMS
F.1 Copies of procedures that control the configuration of the fire protection program,
features, and post-fire safe shutdown methodology and system design. Also,
copies of procedures that govern the implementation of plant modifications,
maintenance, and special operations and their impact on fire protection.
F.2 List of open and closed condition reports for the fire protection systems for the
last three years.
F.3 List of open and closed condition reports associated with the post-fire safe
shutdown analysis for the last three years.
F.4 List of open and closed condition reports associated with operator actions to
achieve and maintain post-fire safe shutdown for the last three years.
F.5 List of open and closed condition reports associated with the fire protection
program including plant change evaluations, post-fire operating procedures
and/or training, timeline evaluations for operator actions, and supporting
engineering evaluations, analysis, or calculations for the last three years.
F.6 List of open and closed condition reports for emergency lighting units for the last
three years.
F.7 Self-assessments, peer assessments, and audits of fire protection activities for
the last three years.
F.8 Self-assessments, peer assessments, and audits of post-fire nuclear safety
capability methodology for the last three years.
F.9 Provide administrative procedures that control temporary modifications,
permanent plant changes, design changes, procedure changes, ageing
6
management changes, equivalency evaluations, suitability analyses,
calculations, commercial grade dedication, safety-security interface, and repairs.
F.10 Provide procedures that control the following: combustible controls, hot work,
monitoring, compensatory measures, and work-around.
F.11 Last five hot work permits (at power).
F.12 Last five transient combustible permits (at power).
G. Aging Management Program
G.1 Copies of the aging management programs applicable to fire protection including
but not limited to the following:
- Aboveground Metallic Tanks
- Buried and Underground Piping and Tanks
G.2 Copies of procedures, work orders, preventive maintenance tasks, or other
documents which implement the commitments made as part of the license
extension related to fire protection.
G.3 List of aging management activities related to fire protection performed to date.
7