Letter Sequence RAI |
---|
|
|
MONTHYEARML11350A0532012-01-0404 January 2012 Plan for the Scoping and Screening Regulatory Audit Regarding the Grand Gulf Nuclear Station, Unit 1 License Renewal Application Review Project stage: Other ML12009A1052012-01-18018 January 2012 Plan for the Aging Management Program Regulatory Audit Regarding the Grand Gulf Nuclear Station, Unit 1, License Renewal Application Review Project stage: Other ML12067A2352012-04-0303 April 2012 Requests for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application Project stage: RAI ML12068A2332012-04-0404 April 2012 Requests for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application Project stage: RAI ML12080A1912012-04-11011 April 2012 Request for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application Grand Gulf LRA RAI Set 3 Project stage: RAI ML12074A0082012-04-12012 April 2012 Requests for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application Project stage: RAI ML12076A0142012-04-16016 April 2012 Request for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application (TAC No. ME7493) Grand Gulf LRA Draft RAI Set 5 Project stage: Draft RAI ML12076A0092012-04-17017 April 2012 Requests for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal (TAC ME7493) Grand Gulf LRA Draft RAI Set 6 Project stage: Draft RAI ML12087A0012012-04-18018 April 2012 Requests for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application (TAC ME7493)Grand Gulf LRA RAI Set 07 Project stage: RAI ML12094A0092012-04-25025 April 2012 Requests for Additional Information for the Review of the Grand Gulf Nulcear Station Licesne Renewal Application Project stage: RAI ML12101A3602012-04-26026 April 2012 Request for Additional Information for the Review of Th Grand Gulf Nuclear Station License Renewal Application (TAC No. ME7493) Grand Gulf LRA RAI Set 09 Project stage: RAI ML12104A2192012-04-30030 April 2012 Request for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application (TAC No. ME7493)LRA RAI Set 10 Project stage: RAI GNRO-2012/00029, Response to Request for Additional Information (RAI) Regarding the License Renewal Application2012-05-0101 May 2012 Response to Request for Additional Information (RAI) Regarding the License Renewal Application Project stage: Response to RAI ML12109A2132012-05-0303 May 2012 Requests for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application (TAC No. ME7493) Grand Gulf LRA RAI Set 11 Project stage: RAI GNRO-2012/00036, Response to Request for Additional Information (RAI) Dated April 12, 20122012-05-0909 May 2012 Response to Request for Additional Information (RAI) Dated April 12, 2012 Project stage: Response to RAI ML12118A5392012-05-15015 May 2012 Requests for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application Project stage: RAI ML12125A3732012-05-24024 May 2012 Requests for Additional Information for the Review of the Grant Gulf Nuclear Station License Renewal Application (TAC No. ME7493)Grand Gulf LRA RAI Set 17 Project stage: RAI ML12139A0552012-05-29029 May 2012 LRA RAI Set 19 Project stage: RAI ML12151A2652012-06-15015 June 2012 Request for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application (TAC No. ME7493) Grand Gulf LRA RAI Set 20 Project stage: RAI ML12165A3872012-06-20020 June 2012 Scoping and Screening Methodology Audit Report Regarding the Grand Gulf Nuclear Station, Unit 1, License Renewal Application Project stage: Other ML12151A3682012-06-20020 June 2012 Requests for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application Project stage: RAI ML12152A3932012-06-22022 June 2012 Request for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application Project stage: RAI ML12152A3452012-06-22022 June 2012 Request for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application (Tac No. ME7493) Project stage: RAI ML12157A0562012-06-27027 June 2012 Request for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application (TAC No. ME7493)Grand Gulf LRA RAI Set 24 Project stage: RAI ML12164A7262012-06-27027 June 2012 RAI for the Review of the Grand Gulf Nuclear Station License Renewal Application Project stage: RAI ML12180A5412012-07-17017 July 2012 Summary of Telephone Conference Call Held on March 14, 2012, Between NRC and Entergy Operations, Inc., Concerning RAI Pertaining to the Grand Gulf Nuclear Station, LRA Project stage: RAI ML12188A7062012-07-17017 July 2012 Requests for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application Project stage: RAI ML12188A5162012-07-23023 July 2012 Requests for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application Project stage: RAI ML12200A1382012-07-27027 July 2012 Requests for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application Project stage: RAI ML12201B4762012-07-27027 July 2012 LRA RAI Set 30 Project stage: RAI ML12191A1872012-07-31031 July 2012 LRA RAI Telecon 2012-04-13 Project stage: RAI ML12208A2672012-08-0707 August 2012 RAI for the Review of the Grand Gulf Nuclear Station License Renewal Application Project stage: RAI ML12193A0712012-08-15015 August 2012 Summary of Telephone Conference Call Held on 5/15/12 Between the U.S. Nuclear Regulatory Commission and Entergy Operations, Inc., Concerning Requests for Additional Information Pertaining to the Grand Gulf Nuclear Station, LRA Project stage: RAI ML12220A3372012-08-15015 August 2012 RAI for the Review of the Grand Gulf Nuclear Station License Renewal Application Project stage: RAI ML12201B5042012-08-15015 August 2012 Summary of Telephone Conference Call Held on 5/23/12 Between the U.S. Nuclear Regulatory Commission and Entergy Operations, Inc., Concerning the RAIs Pertaining to the Grand Gulf Nuclear Station License Renewal Application Project stage: RAI ML12202A2142012-08-15015 August 2012 5/30/12 Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and Entergy Operations, Inc., Concerning Requests for Additional Information Pertaining to the Grand Gulf Nuclear Station, LRA Project stage: RAI ML12230A3102012-08-21021 August 2012 Correction to Requests for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application Project stage: RAI ML12201B5452012-08-28028 August 2012 Summary of Telephone Conference Call Held on 6/5/12, Between NRC and Entergy, Concerning RAI Pertaining to the Grand Gulf Nuclear Station, LRA Project stage: RAI ML12209A1482012-08-28028 August 2012 6/8/12 Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and Entergy Operations, Inc., Concerning Requests for Additional Information Pertaining to the Grand Gulf Nuclear Station, LRA Project stage: RAI ML12234A6712012-09-0505 September 2012 Requests for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application Project stage: RAI ML12242A5452012-09-0707 September 2012 Revision of Schedule for the Conduct of Review of the Grand Gulf Nuclear Station, LRA Project stage: Approval ML12230A2472012-09-0707 September 2012 Requests for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application Project stage: RAI ML12214A5482012-09-14014 September 2012 7/18/12 Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and Entergy Operations, Inc., Concerning Requests for Additional Information Pertaining to the Grand Gulf Nuclear Station, LRA Project stage: RAI ML12248A1582012-09-14014 September 2012 Requests for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application Project stage: RAI ML12270A2492012-10-0303 October 2012 Requests for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application Project stage: RAI ML12278A0362012-10-17017 October 2012 Requests for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application Project stage: RAI ML12286A0242012-10-19019 October 2012 RAI for the Review of the Grand Gulf Nuclear Station LRA Project stage: RAI GNRO-2012/00128, Response to Requests for Additional Information (RAI) Set 38 Dated 10/03/20122012-10-22022 October 2012 Response to Requests for Additional Information (RAI) Set 38 Dated 10/03/2012 Project stage: Response to RAI ML12264A3872012-10-31031 October 2012 Summary of Telephone Conference Call Held on 8/21/12, Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning Requests for Additional Information Pertaining to the Grand Gulf Nuclear Station, LRA Project stage: RAI ML12250A1052012-10-31031 October 2012 Summary of Telephone Conference Call Held on 8/15/12 Between the U.S. Nuclear Regulatory Commission and Entergy Operations, Inc., Concerning Requests for Additional Information Pertaining to the Grand Gulf Nuclear Station, LRA Project stage: RAI 2012-05-15
[Table View] |
|
---|
Category:Request for Additional Information (RAI)
MONTHYEARML24088A0092024-03-27027 March 2024 NRR E-mail Capture - Entergy Fleet - Final Request for Confirmation of Information (RCI) Re Alternative Request EN-RR-22-001 Concerning ASME Code Case N-752 (L-2022-LLR-0054) ML23348A1222023-12-14014 December 2023 NRR E-mail Capture - Grand Gulf, River Bend, and Waterford, Unit 3 - 2nd Round of Official RAIs for RR EN-RR-22-001, Use ASME Code Case N-752, Risk Informed Categorization for Class 2 and 3 Systems ML23116A1462023-04-26026 April 2023 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Final RAI for Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019) ML23059A0742023-02-27027 February 2023 Information Request, Security IR 2023402 ML22353A6122022-12-19019 December 2022 March 2023 Emergency Preparedness Exercise Inspection - Request for Information ML22271A8572022-10-0303 October 2022 Notification of Commercial Grade Dedication Inspection (05000416/2023011) and Request for Information ML22110A1172022-04-19019 April 2022 (GG) 2022 Emergency Preparedness (EP) Program Inspection RFI Sdh 041922 ML21179A1202021-06-28028 June 2021 Notification of NRC Supplemental Inspection of Action Matrix Column 3 (Degraded Performance) Inputs and Request for Information ML21074A0822021-03-15015 March 2021 Notification of Evaluations of Changes, Tests, and Experiments Inspection (Inspection Report 05000416/2021002) and Request for Information ML20363A1462020-12-22022 December 2020 Request for Information: Grand Gulf EP Exercise Inspection - March 2021 ML20258A0202020-09-0909 September 2020 EP Program Inspection RFI, Request for Information to Support and Prepare for Emergency Preparedness (EP) Program Inspection Scheduled to Occur the Week of November 16, 2020 ML20260H4422020-09-0808 September 2020 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Official RAIs for RR Associated with Updating ASME Code RR SEs with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020 and RBS-ISI-019) ML20155K7172020-06-0303 June 2020 Notification of NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000416/2020013) and Request for Information ML20150A6012020-05-29029 May 2020 NRR E-mail Capture - Grand Gulf - Official RAI for LAR Associated with Containment ILRT Interval Change from 10 Years to 15 Years ML19302E1082019-10-29029 October 2019 Document Request - GG 95001 - August 2 2019 ML19078A3772019-03-19019 March 2019 NRR E-mail Capture - Grand Gulf - Official Rais for Relief Request GG-ISI-023, Inservice Inspection Impracticality, Limited Coverage Examinations During the Third 10-Year Inservice Inspection Interval ML19063B4882019-03-0404 March 2019 Notification of NRC Triennial Heat Sink Performance Inspection (05000416/2019002) and Request for Information ML18304A4602018-10-31031 October 2018 NRR E-mail Capture - Final Request for Additional Information - TSTF-425 (L-2018-LLA-0106) ML18250A3042018-08-30030 August 2018 NRR E-mail Capture - Final Request for Additional Information - Emergency Action Level Scheme Change (L-2018-LLA-0116) ML18250A3032018-08-0101 August 2018 NRR E-mail Capture - Correction: Draft RAI - EAL Scheme Change (L-2018-LLA-0116) ML18187A3292018-07-20020 July 2018 Request for Additional Information, Request to Revise Updated Final Safety Analysis Report to Incorporate Tornado Missile Risk Evaluator Methodology Into Licensing Basis ML18138A4682018-05-23023 May 2018 Supplemental Information Needed for Acceptance of Request for Licensing Action Adoption of TSTF-425, Relocate Surveillance Frequencies to License Control ML18058A0572018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to J. Giddens Request for Additional Information Regarding Entergy Operations, Inc.'S Decommissioning Funding Plan Update) ML17257A1422017-09-14014 September 2017 NRR E-mail Capture - Grand Gulf - Official Requests for Additional Information (Rais) for RR GG-ISI-020 to Use BWRVIP Guidelines ML17235B1752017-08-23023 August 2017 NRR E-mail Capture - Grand Gulf - Official RAI for Relief Request GG-ISI-021 Associated with Fourth Interval Inservice Inspection Using Code Case N-702 ML17214A0992017-08-0202 August 2017 NRR E-mail Capture - Grand Gulf - Official RAIs for LAR Associated with One Cycle Extension of Appendix J Type a ILRT and Drywell Bypass Test Interval ML17142A2582017-05-19019 May 2017 Notification of NRC Design Bases Assurance Inspection (05000416/2017007) and Initial Request for Information ML16181A1122016-07-12012 July 2016 Request for Additional Information on Severe Accident Mitigation Alternatives for the Review of the Grand Gulf Nuclear Station, Unit 1, License Renewal Application Environmental Review ML16117A1862016-04-26026 April 2016 Entergy Fleet Relief Request EN-ISI-15-1 Request for Additional Information - 04/26/16 Email from R. Guzman to G. Davant (CAC Nos. MF7133-MF7136) ML16013A0642016-01-13013 January 2016 NRR E-mail Capture - Request for Additional Information Entergy CNRO-2015-00023 - Revision to Entergy Quality Assurance Program Manual (Fleet Submittal CAC Nos. MF7086-MF7097) ML15341A1662015-12-0707 December 2015 NRR E-mail Capture - Entergy Fleet RR-EN-15-1, Request for Additional Information (CACs MF6341-MF6349) ML15286A1082015-10-28028 October 2015 Requests for Additional Information for the Review of the Grand Gulf Nuclear Station, License Renewal Application ML15261A5652015-09-24024 September 2015 Request for Additional Information Regarding Proposed Revision of Technical Specifications for Containment Leak Rate Testing ML15085A4932015-04-0606 April 2015 Request for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application, Set 52 GNRO-2015/00002, Response to Electronic Request for Additional Information Regarding Modification of Technical Specification (TS) 3.8.4, DC Sources Operating Surveillance Requirements (Srs) 3.8.4.2 and 3.8.4.5. Amendment Request Dated 12/9/20142015-03-27027 March 2015 Response to Electronic Request for Additional Information Regarding Modification of Technical Specification (TS) 3.8.4, DC Sources Operating Surveillance Requirements (Srs) 3.8.4.2 and 3.8.4.5. Amendment Request Dated 12/9/2014 ML15036A5642015-02-18018 February 2015 Updated Fluence Methodology License Amendment Request Unacceptable with Opportunity to Supplement GNRO-2014/00079, Request for Additional Information Regarding Request for Adoption of TSTF-423, Revision 1, Change in Technical Specification End States (CE-NPSD-1186)2014-11-13013 November 2014 Request for Additional Information Regarding Request for Adoption of TSTF-423, Revision 1, Change in Technical Specification End States (CE-NPSD-1186) GNRO-2014/00076, Response to Request for Additional (RAI) Set 51 Dated September 11, 20142014-11-0606 November 2014 Response to Request for Additional (RAI) Set 51 Dated September 11, 2014 GNRO-2014/00031, Response to Electronic Request for Additional Information Regarding Maximum Extended Load Line Limit Plus Amendment Request, Dated 3/18/20142014-04-11011 April 2014 Response to Electronic Request for Additional Information Regarding Maximum Extended Load Line Limit Plus Amendment Request, Dated 3/18/2014 ML13318A8052014-01-0202 January 2014 Request for Additional Information for the Review of the Grand Gulf Nuclear Station, License Renewal Application (TAC No. ME7493) - Set 50 ML13345A1822013-12-19019 December 2013 Supplemental Information Needed for Acceptance of Licensing Action, Request to Revise Technical Specification to Allow Operation in Expanded Maximum Extended Load Line Limit Analysis Plus (Mellla+) Domain ML13353A6572013-12-19019 December 2013 Licensed Operator Positive Fitness-For-Duty Test ML13316B9862013-11-25025 November 2013 Interim Staff Evaluation and Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) ML13263A2252013-11-21021 November 2013 LRA Draft RAI Set 48 ML13304B4182013-11-0101 November 2013 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns ML13260A0062013-09-16016 September 2013 Email, Request for Additional Information, Round 3, Request to Revise Technical Specifications and Surveillance Requirements to Support Operation with a 24-Month Fuel Cycle in Accordance with Generic Letter 91-04 ML13238A2342013-09-12012 September 2013 Requests for Additional Information for the Review of the Grand Gulf Nuclear Station, License Renewal Application (TAC No. ME7493) - Set 49 ML13227A3942013-08-28028 August 2013 Request for Additional Information for the Review of the Grand Gulf Nuclear Station, License Renewal Application (TAC No. ME7493) - Set 47 ML13226A1902013-08-14014 August 2013 Request for Additional Information Email, Round 2, Request to Revise FOL to Delete 2.C(32), Partial Feedwater Heating, to Allow Plant to Operate with Final Feedwater Temperature Reduction at End of Fuel Cycle ML13207A1242013-07-30030 July 2013 Request for Additional Information, Overall Integrated Plan in Response to 3/12/2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051) 2024-03-27
[Table view] Category:Letter
MONTHYEARIR 05000416/20240112024-10-16016 October 2024 – Fire Protection Team Inspection Report 05000416/2024011 ML24263A2712024-09-19019 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24257A0172024-09-17017 September 2024 Request for Withholding Information from Public Disclosure Unit 1 IR 05000416/20240122024-09-17017 September 2024 License Renewal Post Approval Phase 2 Inspection Report 05000416/2024012 ML24254A3602024-09-10010 September 2024 Pre-Submittal Slides for License Amendment Request, Criticality Safety Analysis, Technical Specification 4.3.1, Criticality and Technical Specification 5.5.14, Spent Fuel Storage Rack Neutron Absorber Monitoring Program IR 05000416/20244022024-09-0909 September 2024 Security Baseline Inspection Report 05000416/2024402 05000416/LER-2024-003, Feedwater Inlet Check Valve Incorrectly Determined Operable2024-08-26026 August 2024 Feedwater Inlet Check Valve Incorrectly Determined Operable ML24235A0832024-08-22022 August 2024 Evaluations Performed in Accordance with 10 CFR 50.54(q) for Changes to Emergency Planning Documents IR 05000416/20240052024-08-21021 August 2024 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2024005) ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 IR 05000416/20240022024-07-29029 July 2024 Integrated Inspection Report 05000416/2024002 ML24176A1202024-07-29029 July 2024 Issuance of Amendment 234 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b ML24172A2502024-07-29029 July 2024 – Issuance of Amendment No. 233 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML24204A2432024-07-23023 July 2024 Notification of Cyber Security Baseline Inspection and Request for Information (05000416/2024403) ML24191A2432024-07-0909 July 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operations IR 05000416/20240102024-06-27027 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000416/2024010 ML24156A1762024-06-24024 June 2024 Regulatory Audit Summary in Support of License Amendment Requests to Adopt TSTF-505, Revision 2 and 10 CFR 50.69 (Epids L-2023-LLA-0081 and L-2023-LLA-0080) ML24165A1512024-06-13013 June 2024 Second Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk-Informe ML24163A2652024-06-11011 June 2024 Inservice Inspection Summary Report ML24060A2192024-05-30030 May 2024 Authorization of Alternative to Use EN-RR-01 Concerning Proposed Alternative to Adopt Code Case N-752 05000416/LER-2024-002, Automatic Actuation of Reactor Protection System2024-05-28028 May 2024 Automatic Actuation of Reactor Protection System ML24130A0912024-05-0909 May 2024 Request for Information Letter License Renewal Phase 2 Inspection ML24128A1512024-05-0909 May 2024 Project Manager Assignment ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions IR 05000416/20240012024-05-0202 May 2024 Integrated Inspection Report 05000416 2024001 ML24122C6112024-05-0101 May 2024 Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf. ML24116A0372024-04-25025 April 2024 Report of Technical Specification Bases Changes ML24113A0952024-04-22022 April 2024 Annual Radioactive Effluent Release Report for 2023 ML24113A0972024-04-22022 April 2024 Annual Report of Individual Monitoring - NRC Form 5 for 2023 Per 1 0 CFR 20.2206 ML24107B0402024-04-16016 April 2024 Notification by Entergy Operations, Inc., of Proposed Economic Performance Incentive and Reliance on Post-Event Improvements in Plant Procedures And/Or Methods of Operation in FERC ML24107A8872024-04-16016 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) ML24101A3882024-04-10010 April 2024 Response to Request for Confirmation of Information by the Office of Nuclear Reactor Regulation Proposed Alternative Request EN-RR-22-001 Risk-Informed Categorization and Treatment for Repair ML24100A0692024-04-0909 April 2024 Report of Changes or Errors to 10 CFR 50.46 Analysis ML24094A0992024-04-0303 April 2024 (GGNS) Core Operating Limits Report (COLR) Cycle 25, Revision O ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams 05000416/LER-2024-001, High Pressure Core Spray Inoperable Due to Minimum Flow Valve Failure to Close2024-03-27027 March 2024 High Pressure Core Spray Inoperable Due to Minimum Flow Valve Failure to Close IR 05000416/20220042024-03-19019 March 2024 – Amended Integrated Inspection Report 05000416/2022004 and Exercise of Enforcement Discretion ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) IR 05000416/20230062024-02-28028 February 2024 Annual Assessment Letter for Grand Gulf Nuclear Station - Report 05000416/2023006 ML24058A3512024-02-28028 February 2024 Notification of Biennial Problem Identification and Resolution Inspection and Request for Information IR 05000416/20233012024-02-26026 February 2024 NRC Examination Report 05000416-2023301 05000416/LER-2023-002, Reactor Scram Due to Generator Stator Fault to Ground2024-02-13013 February 2024 Reactor Scram Due to Generator Stator Fault to Ground ML24043A1892024-02-12012 February 2024 Spent Fuel Storage Radioactive Effluent Release Report for 2023 ML24012A1422024-01-31031 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0051 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24043A0732024-01-29029 January 2024 2024-01 Post Examination Comments IR 05000416/20230042024-01-25025 January 2024 Integrated Inspection Report 5000416/2023004 IR 05000416/20234012024-01-18018 January 2024 Cyber Security Inspection Report 05000416/2023401 (Public) ML24018A0222024-01-18018 January 2024 Core Operating Limits Report (COLR) Cycle 24, Revision 2 2024-09-09
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 27,2012 Mr. Michael Perito Vice President, Site Entergy Operations, Inc.
P.O. Box 756 Port Gibson, MS 39150
SUBJECT:
REQUESTS FOR ADDITIONAL INFORMATiON FOR THE REVIEW OF THE GRAND GULF NUCLEAR STATION LICENSE RENEWAL APPLICATION (TAC NO. ME7493)
Dear Mr. Perito:
BV ietter dated October 28, 2011, Entergy Operations. Inc., submitted an application pursuant to TItle 10 of the Code of Federel Regulations Part 54, to renew the operating license fo( Grand GUlf Nuclear Station, Unit 1, for review by the U.S. Nuclear Regulatory Commissior: (NRC or the staft). The staff is reviewing the information contained In t~e license renewal application and has identified, in the enclosure areas where additional inf<:>rmation is needed to complete the review.
These I-equests for addltionai information were discussed with Jeff Seiter, and a mutually agreeable date for the response is wjthir. 30 days from the dare of this letter. If you have any questioi1 :':;. piease contact me at 301~415-1045 or by e-ma!l at flathaniel.ferrer@nrc.gov.
Sincerely, Nathaniel Ferrer Project Manager Projects Branch 1 Division of License R~newai Office of Nuclear Reactor r-~egulation Docket No. 50-416
£nciOSllre Requests tor Addltionai Infc;-;"Yt3tion ccw!er:c!: Listse'v
GRAND GULF NUCLEAR STATION LICENSE RENEWAL APPLICATION REQUESTS FOR ADDITIONAL INFORMATION SET 30 RAI3.0.5-1 Background. Pursuant to 10 CFR 54.21 (a)(3), a license renewal applicant is required to demonstrate that the effects of aging on structures and components subject to an aging management review are adequately managed so that their intended functions will be maintained consistent with the current licensing basis for the period of extended operation. Section 3.0.1 of NUREG-1800, "Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants," Revision 2 (SRP-LR), defines an aging management review as the identification of the materials, environments, aging effects, and aging management programs (AMPs) credited for managing the aging effects. SRP-LR Section A.1.2.3 defines an acceptable AMP as consisting of ten elements, including Element 10, "Operating Experience," which is described in SRP-LR Section A.1.2.3.1 0, Paragraph 1 (in part), as follows:
Consideration of future plant-specific and industry operating experience relating to aging management programs should be discussed. Reviews of operating experience by the applicant in the future may identify areas where aging management programs should be enhanced or new programs developed. An applicant should commit to a future review of plant-specific and industry operating experience to confirm the effectiveness of its aging management programs or indicate a need to develop new aging management programs (emphasis added). This information should provide objective evidence to support the conclusion that the effects of aging will be managed adequately so that the structure and component intended function(s) will be maintained during the period of extended operation.
In addition, 10 CFR 54.21 (d) requires the application to contain a final safety analysis report (FSAR) supplement. This supplement must contain a summary description of the programs and activities for managing the effects of aging and the evaluation of time-limited aging analyses for the period of extended operation.
The NRC issued License Renewal Interim Staff Guidance (LR-ISG)-2011-05, "Ongoing Review of Operating Experience," dated March 16, 2012, to clarify the staff's position that license renewal AMPs should be informed, and enhanced when necessary, based on the ongoing review of both plant-specific and industry operating experience.
Based on its review of the Grand Gulf Nuclear Station, Units 1, license renewal application (LRA), the staff determined that Section B.O.4 provides a general description of how the applicant gathered and considered operating experience in preparing its LRA, and Sections B.1.1 through B.1.44 summarize the specific operating experience considered for each AMP.
Issue. LRA Sections B.O.4 and 8.1.1 through B.1.44 describe how the applicant incorporated operating experience into its AMPs and will monitor internal and external operating experience on an ongoing basis. The applicant states that the Operating Experience Program and the
- 2 Corrective Action Program (CAP) are used to evaluate operating experience to enhance AMPs and ensure the effectiveness of AMPs. However, the LRA does not provide specific details to describe the Operating Experience Program and CAP and how they are used to monitor operating experience on an ongoing basis and ensure the continued effectiveness of AMPs.
The LRA also does not state whether new AMPs will be developed, as necessary.
Request.
- a. Describe the programmatic activities that will be used to continually identify aging issues, evaluate them and, as necessary, enhance the AMPs or develop new AMPs for license renewal. Indicate whether these activities and programs will be consistent with guidance described in LR-ISG-2011-0S. If not consistent, provide the basis for the conclusion that the programmatic activities will ensure operating experience will be reviewed on an ongoing basis to address age-related degradation and aging management during the term of the renewed license
- b. Consistent with the response to Request (a) above, provide a summary description in the updated FSAR supplement of how operating experience will be reviewed on an ongoing basis to address age-related degradation and aging management during the term of the renewed license.
RAI8.1.42-1a Background. Generic Aging Lessons Learned (GALL) Report aging management program (AMP) XI.S6, "Structures Monitoring," program element "detection of aging effects," states that in general, all structures are monitored on a frequency not to exceed S years. The GALL Report further states that some structures of lower safety significance, and subjected to benign environmental conditions, may be monitored at an interval exceeding S years; however, they should be identified and listed, together with their operating experience.
Issue. The LRA states that the Structures Monitoring Program, with enhancements, is consistent with the GALL Report AMP XI.S6. In its response to RAI B.1.42-1, dated May 30, 2012, the applicant stated that an enhancement identified in LRA Section 8.1.42 will require inspections every S years for structures and structural components within the scope of license renewal unless technical justification is provided to extend the inspection interval to 10 years.
The applicant further stated that this enhancement will also ensure that in-scope structures are inspected at least once every 10 years during the period of extended operation. GALL Report AMP XI.S6 does allow some structures of lower safety significance, and subject to benign environmental conditions, to be monitored at an interval exceeding S years; however, the structures should be identified and listed, together with their operating experience. It is not clear whether all structures and structural components, within the scope of license renewal, will be monitored on a frequency not to exceed S years consistent with the recommendations in the GALL Report, or if the applicant plans to extend the inspection interval for structures of lower safety significance.
-3 Request.
- a. Clarify if all structures and structural components, within the scope of license renewal, will be inspected every 5 years consistent with recommendations in GALL Report AMP XI.S6.
- b. If there are structures and structural components that will be inspected at a frequency greater than the 5-year interval as recommended in GALL Report AMP XI,S6, identify and list the structures and structural components, and provide technical justification (e.g., safety significance, environmental conditions, and operating experience) for this inspection frequency that demonstrates that aging effects will be detected before there is loss of intended function(s).
SUBJECT:
REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE GRAND GULF NUCLEAR STATION, LICENSE RENEWAL APPLICATION DISTRIBUTION:
HARD COPY:
DLR RF E-MAIL:
PUBLIC [or NON-PUBLIC, if applicable]
RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRapb Resource RidsNrrDIrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource NFerrer DDrucker DWrona DMorey AWang RSmith, RIV BRice, RIV GPick, RIV DMclntyre, OPA
..'ML12201B476 I
. OFFICE I LA:RPB2:DLR PM:RPB1:DLR BC:RPB1:DLR PM: RPB1:DLR I NAME IKing NFerrer DMorey NFerrer
!DATE L--._ _..
7/26/12 07/27/12 07/27/12 . . I 07/27/12