Notification of NRC Initial Operator Licensing Examination 05000416/2024301
ML23102A148
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 04/12/2023
From: Heather Gepford
NRC/RGN-IV/DORS/OB
To: Kapellas B
Entergy Operations
Kirkland J
References
50-416/24-301
Download: ML23102A148 (4)


See also: IR 05000416/2024301

Text

April 12, 2023

Brad Kapellas, Site Vice President

Entergy Operations, Inc.

Grand Gulf Nuclear Station

P.O. Box 756

Port Gibson, MS 39150

SUBJECT: GRAND GULF NUCLEAR STATION - NOTIFICATION OF NRC INITIAL

OPERATOR LICENSING EXAMINATION 05000416/2024301

Dear Brad Scott:

In a telephone conversation on April 11, 2023, between Mr. Anthony Watson, Operations

Training Superintendent and Mr. John Kirkland, Chief Examiner, arrangements were made for

the administration of operator licensing examinations at Grand Gulf Nuclear Station during the

week of January 22, 2024.

As agreed during the telephone conversation, your staff will prepare the examinations based on

the guidelines in Revision 12 to NUREG-1021, Operator Licensing Examination Standards for

Power Reactors. The NRCs regional office will discuss with your staff any changes that might

be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the operating test

outlines by August 21, 2023. The written examination outline was provided to your staff on

April 11, 2023. The written examinations, operating tests, and supporting reference materials

identified in NUREG-1021, Examination Standard (ES)-2.1, Preparing for Operator Licensing

Initial Examinations, will be due by November 6, 2023. Pursuant to Title 10 of the Code of

Federal Regulations (10 CFR) 55.40(b)(3), an authorized representative of the facility licensee

shall approve the examinations and tests before they are submitted to the NRC for review and

approval. All materials shall be complete and ready to use.

We request that any personal, proprietary, sensitive unclassified, or safeguards information in

your response be contained in a separate enclosure and appropriately marked. Delays in

receiving the required materials, or the submittal of inadequate or incomplete materials, may

cause the examinations to be cancelled or rescheduled. In addition, your support for on-site

validation of the examinations is required during the week of December 11, 2023.

To conduct the requested written examinations and operating tests, your staff will need to

provide adequate space and accommodations and to make the simulation facility available on

the dates noted above. In accordance with ES 3.5, Administering Operating Tests, your staff

should retain the original simulator performance data (e.g., system pressures, temperatures,

and levels) generated during the dynamic operating tests until the NRC takes licensing action

on all the applications and any adjudicatory actions on any hearing demands are complete.

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E. LAMAR BLVD

ARLINGTON, TX 76011-4511

B. Kapellas

2

ES-1.2, Guidelines for Taking NRC Examinations, contains a number of NRC guidelines for

the written examinations and operating tests as they are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator waiver or excusal requests (if any) (Office of Management

and Budget (OMB) control number 3150 0090) at least 60 days before the first examination date

(if possible). Contact Mr. Kirkland to determine the method for submission of the waiver or

excusal requests. Preliminary reactor operator and senior reactor operator license applications

(OMB control number 3150 0090) and medical certifications (OMB control number 3150 0024)

should be submitted at least 30 days before the first examination date. If the NRC does not

receive the preliminary applications at least 30 days before the examination date, a

postponement may be necessary. Final, signed applications certifying that all training has been

completed and requesting any waivers or excusals, as applicable, should be submitted at least

14 days before the first examination date.

Although the guidelines for waiver or excusal requests call for their receipt at least 30 days

before the first examination date (preliminary) and 14 days before the first examination date

(final), the requests should be submitted as early as possible in the process (see the 60-day

guideline above). Resolutions resulting from verbal inquiries by the facility licensee to the NRC

are not binding. Submittals addressing waivers or excusals, or both, should be in writing

(i.e., using NRC Form 398 or as directed when Mr. Kirkland is contacted to determine the

method for submission. The NRC will document its final decision on whether to grant a waiver or

excusal on the final (not preliminary) NRC Form 398 submitted for the applicant. The NRC will

not provide its decision until the final application is submitted to the agency.

Paperwork Reduction Act Statement

This letter contains information collection requirements that are subject to the Paperwork

Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved

by the OMB, approval number 3150-0018.

The burden to the public for these mandatory information collections is estimated to average

400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br /> per examination, including the time for reviewing instructions, searching existing data

sources, gathering and maintaining the data needed, and completing and reviewing the

information collections. Send comments regarding this information collection to the FOIA,

Library, and Information Collections Branch (T6-A10M), U.S. Nuclear Regulatory Commission,

Washington, DC 20555 0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the OMB

reviewer at: OMB Office of Information and Regulatory Affairs (3150-0018), Attn: Desk Officer

for the Nuclear Regulatory Commission, 725 17th Street, NW Washington, DC 20503; e-mail:

oira_submission@omb.eop.gov.

Public Protection Notification

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection

of information unless the document requesting or requiring the collection displays a currently

valid OMB control number.

In accordance with 10 CFR 2.390, Public inspections, exemptions, requests for withholding, a

copy of this letter and its enclosures will be available electronically for public inspection through the

NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible

B. Kapellas

3

on the NRCs Web site at http://www.nrc.gov/reading-rm/adams.html.

Thank you for your cooperation in this matter. Mr. Watson has been advised of the policies and

guidelines referenced in this letter. If you have any questions about the NRCs examination

procedures and guidelines, please contact Mr. Kirkland at 817-200-1171, or me at 817-200-

1159.

Sincerely,

Heather J. Gepford, PhD, Chief

Operations Branch

Division of Operating Reactor Safety

Docket No. 05000416

License No. NPF-29

Electronic Distribution via LISTSERVE

Signed by Gepford, Heather

on 04/12/23

ML23102A148

SUNSI Review:

ADAMS:

Non-Publicly Available

Non-Sensitive

Keyword:

By: JCK

Yes No

Publicly Available

Sensitive

NRR-079

OFFICE

SOE: OB

C: OB

NAME

JKirkland

HGepford

SIGNATURE

JCK

HJG

DATE

04/12/23

04/12/23