Letter Sequence Acceptance Review |
|---|
TAC:MF2798, Clarify Application of Setpoint Methodology for LSSS Functions (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
- Supplement, Supplement
Results
Other: GNRO-2013/00060, Entergys First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049), GNRO-2014/00011, Entergys Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses- with- Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049), GNRO-2014/00060, Entergys Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, GNRO-2015/00004, Entergys Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mititgation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049), ML14101A043, ML14101A087, ML14119A009, ML14260A130, ML14262A372, ML14262A397, ML14265A370, ML14265A384, ML14265A422, ML15085A227
|
MONTHYEARGNRO-2013/00060, Entergys First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049)2013-08-28028 August 2013 Entergys First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049) Project stage: Other GNRO-2013/00012, Maximum Extended Load Line Limit Analysis Plus (Mellla+), License Amendment Request2013-09-25025 September 2013 Maximum Extended Load Line Limit Analysis Plus (Mellla+), License Amendment Request Project stage: Request ML13345A1822013-12-19019 December 2013 Supplemental Information Needed for Acceptance of Licensing Action, Request to Revise Technical Specification to Allow Operation in Expanded Maximum Extended Load Line Limit Analysis Plus (Mellla+) Domain Project stage: Acceptance Review ML13364A2862013-12-30030 December 2013 Maximum Extended Load Mine Limit Analysis Plus (Mella+) License Amendment Request-Responses to Requests for Supplemental Information Project stage: Supplement ML14023A5802014-01-23023 January 2014 NRR E-mail Capture - Acceptance Review of Grand Guld Nuclear Station License Amendment Request Regarding Maximum Extended Load Line Limit Analysis Plus Project stage: Acceptance Review ML14037A1492014-02-0606 February 2014 NRR E-mail Capture - Grand Gulf Nuclear Station Request for Additional Information Regarding Maximun Extended Load Line Limit Plus Amendment Request Project stage: RAI GNRO-2014/00011, Entergys Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses- with- Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2014-02-28028 February 2014 Entergys Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses- with- Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) Project stage: Other GNRO-2014/00024, Response to Request for Additional Information Regarding Maximum Extended Load Line Limit Plus Amendment Request, Dated 2/6/20142014-03-10010 March 2014 Response to Request for Additional Information Regarding Maximum Extended Load Line Limit Plus Amendment Request, Dated 2/6/2014 Project stage: Response to RAI ML14080A2722014-03-18018 March 2014 NRR E-mail Capture - Grand Gulf Nuclear Station Request for Additional Information Regarding Maximun Extended Load Line Limit Plus Amendment Request Project stage: RAI ML14119A0092014-04-28028 April 2014 NRR E-mail Capture - Grand Gulf Nuclear Station Audit Plan Regarding Maximun Extended Load Line Limit Plus Amendment Request Project stage: Other ML14101A0432014-05-0808 May 2014 Request for Withholding from Public Disclosure - 12/19/2013 Affidavit Executed by L. Dolan, GE-Hitachi Nuclear Energy Americas LLC Related to Responses to Request for Supplemental Information Project stage: Other ML14101A0872014-05-0808 May 2014 Request for Withholding from Public Disclosure - 9/10/2013 Affidavit Executed by P. Yandow, GE-Hitachi Nuclear Energy Americas LLC Related to Nedc - 33612P, Revision 0 Project stage: Other ML14140A3012014-05-19019 May 2014 NRR E-mail Capture - Grand Gulf Nuclear Station, Unit 1, Request for Additional Information Regarding Maximum Load Line Limit Analysis Plus Project stage: RAI ML14211A1362014-07-30030 July 2014 NRR E-mail Capture - Grand Gulf Nuclear Station Request for Additional Information Regarding Maximun Extended Load Line Limit Plus Amendment Request Project stage: RAI GNRO-2014/00051, Response to Request for Additional Information Regarding Maximum Extended Load Line Limit Plus Amendment Request Dated 7/2/20142014-08-14014 August 2014 Response to Request for Additional Information Regarding Maximum Extended Load Line Limit Plus Amendment Request Dated 7/2/2014 Project stage: Response to RAI GNRO-2014/00045, Response to Request for Additional Information Regarding Maximum Extended Load Line Limit Plus Amendment Request, Dated 5/19/20142014-08-26026 August 2014 Response to Request for Additional Information Regarding Maximum Extended Load Line Limit Plus Amendment Request, Dated 5/19/2014 Project stage: Response to RAI GNRO-2014/00060, Entergys Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2014-08-26026 August 2014 Entergys Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Other GNRO-2014/00064, Superseding Response to Request for Additional Information Regarding Maximum Extended Load Line Limit Plus Amendment Request, Dated 3/18/20142014-09-0404 September 2014 Superseding Response to Request for Additional Information Regarding Maximum Extended Load Line Limit Plus Amendment Request, Dated 3/18/2014 Project stage: Response to RAI GNRO-2014/00052, Response to Electronic Request for Additional Information Regarding Maximum Extended Load Line Limit Plus Amendment Request, Dated 7/29/20142014-09-10010 September 2014 Response to Electronic Request for Additional Information Regarding Maximum Extended Load Line Limit Plus Amendment Request, Dated 7/29/2014 Project stage: Request ML14111A0582014-10-23023 October 2014 Request for Withholding from Public Disclosure - 3/4/14 Affidavit Executed by P. Yandow, GE-Hitachi Nuclear Energy Americas LLC Related to Enclosure to GNRO-2014/00024 Responses to Request for Additional Information Project stage: RAI ML14265A3702014-10-23023 October 2014 Request for Withholding from Public Disclosure - 7/1/14 Affidavit Executed by P. Yandow, GE-Hitachi Nuclear Energy Americas LLC Related to Attachment 1 to GNRO-2014/00064 Dated 9/4/14 Project stage: Other ML14265A3842014-10-23023 October 2014 Request for Withholding from Public Disclosure - 6/19/14 Affidavit Executed by P. Yandow, GE-Hitachi Nuclear Energy Americas LLC Related to Attachment 1 to GNRO-2014/00045 Dated 8/26/14 Project stage: Other ML14265A4222014-10-23023 October 2014 Request for Withholding from Public Disclosure - 6/25/14 Affidavit Executed by J. Harrison, GE-Hitachi Nuclear Energy Americas LLC Related to Attachment 3 to GNRO-2014/00045 Dated 8/26/14 Project stage: Other ML14262A3722014-11-12012 November 2014 Request for Withholding from Public Disclosure - 8/20/14 Affidavit Executed by J. Harrison, GE-Hitachi Nuclear Energy Americas LLC Related to Attachment 1 to GNRO-2014/00052 Dated 9/10/14 Project stage: Other ML14262A3972014-11-12012 November 2014 Request for Withholding from Public Disclosure - 7/22/14 Affidavit Executed by J. Harrison, GE-Hitachi Nuclear Energy Americas LLC Related to Enclosure 1 to GNRO-2014/00051 Dated 8/14/14 Project stage: Other ML14260A1302014-11-25025 November 2014 April 23-25, 2014, Audit Report Regarding Maximum Extended Load Line Limit Analysis Plus Amendment Including Minimum Stable Film Boiling Temperature and Quench Model Project stage: Other GNRO-2014/00083, Traversing Incore Probe (TIP) Comparisons TIP Comparisons for Current Operating Conditions in Support of the Grand Gulf Nuclear Station (GGNS) Maximum Extended Load Line Limit Analysis Plus (Mellla+) License Amendment Request2014-12-15015 December 2014 Traversing Incore Probe (TIP) Comparisons TIP Comparisons for Current Operating Conditions in Support of the Grand Gulf Nuclear Station (GGNS) Maximum Extended Load Line Limit Analysis Plus (Mellla+) License Amendment Request Project stage: Request GNRO-2014/00090, Correction to Typographical Error in Entergy Letter GNRO-2014/00053 Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using Consolidated Line Item Improvement.2015-01-0606 January 2015 Correction to Typographical Error in Entergy Letter GNRO-2014/00053 Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using Consolidated Line Item Improvement. Project stage: Request GNRO-2014/00088, Response to Item 20 Request for Additional Information Regarding Maximum Extended Load Line Limit Plus Amendment Request, Dated 5/19/20142015-01-20020 January 2015 Response to Item 20 Request for Additional Information Regarding Maximum Extended Load Line Limit Plus Amendment Request, Dated 5/19/2014 Project stage: Request GNRO-2015/00003, Response to Item 25 Request for Additional Information Regarding Maximum Extended Load Line Limit Plus, Amendment Request, Dated 5/19/20142015-02-0909 February 2015 Response to Item 25 Request for Additional Information Regarding Maximum Extended Load Line Limit Plus, Amendment Request, Dated 5/19/2014 Project stage: Request GNRO-2015/00011, Supplement to License Amendment Request Application to Revise the Current Methodology from 0 EFPY Through the End of Extended Operations to a Single Fluence Method2015-02-18018 February 2015 Supplement to License Amendment Request Application to Revise the Current Methodology from 0 EFPY Through the End of Extended Operations to a Single Fluence Method Project stage: Supplement GNRO-2015/00013, Request to Convert Regulatory Commitments for Time Critical Operator Actions Listed in Letter GNRO-2015/00003, Response to Item 25 Request for Additional Information Regarding Maximum Extended Load Line Limit2015-02-19019 February 2015 Request to Convert Regulatory Commitments for Time Critical Operator Actions Listed in Letter GNRO-2015/00003, Response to Item 25 Request for Additional Information Regarding Maximum Extended Load Line Limit Project stage: Request GNRO-2015/00004, Entergys Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mititgation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2015-02-19019 February 2015 Entergys Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mititgation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) Project stage: Other GNRO-2015/00012, Response to License Amendment Request for Revision of Five Technical Specification Allowable Value Setpoints Request for Additional Information2015-03-0303 March 2015 Response to License Amendment Request for Revision of Five Technical Specification Allowable Value Setpoints Request for Additional Information Project stage: Request ML15040A1262015-03-19019 March 2015 Request for Withholding Information from Public Disclosure - 10/30/14 Affidavit Executed by James F. Harrison, GE-Hitachi Nuclear Energy Americas LLC, Related to Attachment 1 to GNRO-2014/00088 Dated 1/20/15 (TAC MF27 Project stage: Withholding Request Acceptance ML15085A2272015-04-14014 April 2015 October 15, 2014, Onsite Audit Report Regarding Maximum Extended Load Line Limit Analysis Plus Project stage: Other ML15040A0932015-06-24024 June 2015 Request for Withholding Information from Public Disclosure-10/12/14 Affidavit Executed by James F. Harrison, GE-Hitachi Nuclear Energy Amenricas LLC Related to Attachment 1 to GNRO-2014/00083 Dated 12/15/2014 (MF2798) Project stage: Withholding Request Acceptance GNRO-2015/00059, Submits Corrected Technical Specification Pages Regarding Maximum Extended Load Line Limit Plus License Amendment Request, Dated 9/25/20132015-08-14014 August 2015 Submits Corrected Technical Specification Pages Regarding Maximum Extended Load Line Limit Plus License Amendment Request, Dated 9/25/2013 Project stage: Request ML15229A2192015-08-31031 August 2015 Redacted, Issuance of Amendment Maximum Extended Load Line Limit Analysis Plus License Amendment Request Project stage: Approval 2014-05-08
[Table View] |
Text
Vice President, Operations Entergy Operations, Inc.
Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 December 19, 2013
SUBJECT:
GRAND GULF NUCLEAR STATION, UNIT 1-SUPPLEMENTAL INFORMATION NEEDED FOR ACCEPTANCE OF LICENSING ACTION, REQUEST TO ALLOW OPERATION IN EXPANDED MAXIMUM EXTENDED LOAD LINE LIMIT ANALYSIS PLUS DOMAIN (TAC NO. MF2798)
Dear Sir or Madam:
By letter dated September 25, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13269A140}, Entergy Operations, Inc. (Entergy, the licensee),
submitted a license amendment request for the Grand Gulf Nuclear Station, Unit 1 (GGNS).
The letter dated September 25, 2013, contains sensitive unclassified non-safeguards information (proprietary) and, accordingly, those portions are withheld from public disclosure.
The proposed amendment would revise the Operating License and Technical Specifications to allow plant operation in the expanded Maximum Extended Load Line Limit Analysis Plus (MELLLA+) domain. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the U.S. Nuclear Regulatory Commission (NRC) staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of the Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.43 of 1 0 CFR addresses the content of the technical information required. This section stipulates the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that the information delineated in the enclosure to this letter is necessary to enable the NRC staff to make an independent assessment regarding the acceptability of the proposed amendment request in terms of regulatory requirements and the protection of public health and safety and the environment.
In order to make the application complete, the NRC staff requests that Entergy supplement the application to address the information requested in the enclosure by January 3, 2014. This will enable the NRC staff to complete its detailed technical review. If the information responsive to the NRC staff's request is not received by the above date, the application will not be accepted for review pursuant to 10 CFR 2.101, and the NRC staff will cease its review activities associated with the application. If the application is subsequently accepted for review, you will be advised of any further information needed to support the NRC staff's detailed technical review by separate correspondence.
The information requested and associated time frame in this letter were discussed with Mr. Steve Ward of your staff on December 4, 2013.
If you have any questions, please contact me at (301) 415-1445 or Alan.Wang@nrc.gov.
Docket No. 50-416
Enclosure:
Supplemental Information Request cc w/encl: Distribution via Listserv Sincerely,
~
vJDA~//
Alan Wang, Project MM,ager Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
SUPPLEMENTAL INFORMATION REQUEST NEEDED FOR ACCEPTANCE OF LICENSING ACTION LICENSE AMENDMENT REQUEST TO ALLOW OPERATION IN EXPANDED MAXIMUM EXTENDED LOAD LINE LIMIT ANALYSIS PLUS DOMAIN ENTERGY OPERATIONS. INC.
GRAND GULF NUCLEAR STATION. UNIT 1 DOCKET NO. 50-416 By letter dated September 25, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13269A140), Entergy Operations, Inc. (Entergy, the licensee),
submitted a license amendment request (LAR) for the Grand Gulf Nuclear Station, Unit 1 (GGNS). The letter dated September 25, 2013, contains sensitive unclassified non-safeguards information (proprietary) and, accordingly, those portions are withheld from public disclosure.
The proposed amendment would revise the Operating License and Technical Specifications to allow plant operation in the expanded Maximum Extended Load Line Limit Analysis Plus (MELLLA+) domain. By letter dated September 17, 2007 (ADAMS Accession No. ML072190207), the U.S. Nuclear Regulatory Commission (NRC) staff approved the original topical report (TR) NEDC-33006P, "General Electric Boiling Water Reactor [BWR] Maximum Extended Load Line Limit Analysis Plus," Revision 2, with the proviso that licensees must provide NRC-approved plant-specific automatic backup stability protection for MELLLA+
operation.
By letter dated March 28, 2012 (ADAMS Accession No. ML120400319), the NRC issued license Amendment No. 188 for GGNS to replace the existing Average Power Range Monitor (APRM) subsystem of the Neutron Monitoring System with a digital General Electric - Hitachi (GEH)
Nuclear Measurement Analysis and Control (NUMAC) Power Range Neutron Monitoring System (PRNMS), with the Option Ill algorithm for MELLLA. However, as noted in the NRC's safety evaluation (SE), the proviso for demonstrating automatic backup stability protection to enable NRC staff approval of MELLLA+ operation, as required by the September 2007 TR, was incomplete. The NRC staff noted that the licensee's response did not include an equivalent of a NUREG-0800, Branch Technical Position (BTP) 7-19, Revision 5, "Guidance for Evaluation of Diversity and Defense-in-Depth in Digital Computer-Based Instrumentation and Control Systems" (Reference 1) analysis to demonstrate adequate diversity for vulnerabilities to common-cause failures to the Oscillation Power Range Monitor (OPRM) instrument's Detect and Suppress Solution-Confirmation Density (DSS-CD) algorithm trip function. On page 54 of the NRC's March 28, 2012, SE, the staff stated, in part, that, "Therefore, the NRC staff did not evaluate the adequacy of the diversity of DSS-CD trip function in consideration of potential common-cause failures within the PRNMS."
Following completion of the installation of the PRNMS, Entergy was to evaluate the performance of PRNMS at GGNS. The NRC staff noted on page 2 of the SE dated Enclosure March 28, 2012, that because this licensing action with MELLLA+ does not enable the DSS-CD trip output, the staff had limited its review of the DSS-CD trip to (1) confirm that the licensee will use its local indications to obtain operating experience, and (2) evaluate and confirm that the presence of the confirmation density algorithm would not adversely affect the performance of the required safety functions. This continued performance evaluation information was not available or referenced in the September 25, 2013, GGNS LAR and thus the technical analysis included within it does not provide an evaluation, assessment, observation, or cited information on the diversity and defense-in-depth of the MELLLA+ trip function that satisfies the acceptance criterion in BTP 7-19.
The use of common software for normal and backup stability can disable both functions in case of common-cause software failure. Thus, the NRC staff needs the following supplemental information to complete the acceptance review:
- 1.
On page xiii of the September 17, 2007, MELLLA+ TR states: "Therefore, the NRC staff concluded that manual backup stability protection is not appropriate and a NRC-approved automatic backup stability protection must be implemented for MELLLA + operation." Please provide the required supplemental information on the automatic backup stability protection.
- 2.
Please provide hardware/software technical information as emphasized in the reference document GEH NEDC-33075P, pages 1-2. This information should specifically document the hardware and software and/or firmware designs as per any variations from MELLLA to the MELLLA+ algorithm.
- 3.
Demonstrate the common-cause failure vulnerabilities and the defense-in-depth for the detection algorithms and the backup stability solution. It is unclear if the primary and backup stability trip functions for MELLLA+ use the same software and are therefore subject to software common-cause failure. Please provide a discussion of the postulated Software Common-Cause Failure (SWCCF) with its possible consequences on diversity and defense-in-depth.
- 4.
If a postulated SWCCF condition disables an appropriate response, then what documented diverse means not subject to the same common-cause failure would be available to provide adequate protection? Please discuss the proposed design with respect to how it meets the guidance of BTP 7-19. Provide a detailed analysis meeting the guidance contained in BTP 7-19.
Reference:
- 1.
U.S. Nuclear Regulatory Commission, NUREG-0800, "Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR [Light-Water Reactor]
Edition," (SRP) Branch Technical Position (BTP) 7-19. "Guidance for Evaluation of Diversity and Defense-in-Depth in Digital Computer Based Instrumentation and Control Systems," Revision 5, March 2007 (ADAMS Accession No. ML070550072).
ML13345A182 Sincerely, Ira/
Alan Wang, Project Manager Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation OFFICE NRR/DORULPL4-2/PM NRRIDORULPL4-2/LA NRR/DORULPL4-2/BC NRR/DORULPL4-2/PM NAME A Wang JBurkhardt DBroaddus (KFeintuch for)
A Wang DATE 12/12/13 12/11/13 12/17113 12/19/13