'N PSEG Nuclear LLC P.O Box 236, Hancocks Bndge, New Jersey 08038-0236 SEP 1 6 2002 O PSEG NuclearLLC LR-N02-0326 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

MONTHLY OPERATING REPORT HOPE CREEK GENERATING STATION DOCKET NO. 50-354 In compliance with Section 6.9, Reporting Requirements for the Hope Creek Technical Specifications, the operating statistics for August 2002 are being forwarded.

Sincerely, D. F. G rchow Vice President - Operations RAR Attachments C Distribution 95-2168 REV 7/99

I DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 09/10/02 COMPLETED BY: F. Todd TELEPHONE: (856) 339-1316 Reporting Period August 2002 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 1083 Maximum Dependable Capacity (MWe-Net) 1049 Month Year-to-date Cumulative No. of hours reactor was critical 744 5764 118186 No. of hours-generator was on line (service 744 - 5625 115890 hours)

Unit reserve shutdown hours 0 0 0 Net Electrical Energy (MWH) 749505- 5752611 117388219 UNIT SHUTDOWNS NO. DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION/

F=FORCED (HOURS) (1) SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2)

(1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other

DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 09/10/02 COMPLETED BY: R. Ritzman TELEPHONE: (856) 339-1445 Summary Of Monthly Operating Experience

" Hope Creek began the month at 100% power.

" On August 17, there was a planned power reduction to approximately 39%

power to perform control valve testing and replacement of the MG set brushes. Power was returned to 100% on August 21. There were no other significant power reductions during August.

" At the end of the month, Hope Creek competed 65 days of continuous on-line operation.