LR-N06-0009, December 2005 Monthly Operating Report for Hope Creek Generating Station
| ML060380610 | |
| Person / Time | |
|---|---|
| Site: | Hope Creek |
| Issue date: | 01/12/2006 |
| From: | Massaro M Public Service Enterprise Group |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| LR-N06-0009 | |
| Download: ML060380610 (3) | |
Text
G Nuclear LLC Box 236, Hancocks Bridge, New Jersey 08038-0236 Oc PSEG Nuclear LLC U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 MONTHLY OPERATING REPOIT HOPE CREEK GENERATING S fATION DOCKET NO. 50-354 iE LR-N06-0009 JAN 1 2 2006 In compliance with Section 6.9, Reporting Requirements for the Hope Creek Technical Specifications, the operating statistics for December 2005 are being forwarded.
Sincerely, Michael J. Massaro Hope Creek Plant Manager Attachments C Distribution r e 5 Q 95-2168 REV. 7/99
I' DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-354 Hope Creek 01/09/06 K. Hight (856) 339-3887 Reporting Period December 2005 OP :RATING DATA REPORT Design Electrical Rating (MWe Net)
Maximum Dependable Capacity (MWe-Net)
No. of hours reactor was critic I No. of hours generator was on ine (service 1083 1049 hours0.0121 days <br />0.291 hours <br />0.00173 weeks <br />3.991445e-4 months <br />)
Unit reserve shutdown hours Net Electrical Energy (MWH)
Month Year-to-date Cumulative 744 7758 142545 744 7379 139459 0
0 0
816628 7684767 141472905 Ii NI SUTDO'INNS NO.
DATE TYPE
_DURATION REASON METHOD OF CORRECTIVE ACTION/
F=FORCED (HOURSO I
(1)
SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2) i i
_=
I
- I_=
(1) Reason A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)
H - Other (2) Method 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)
DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 01/09/06 COMPLETED BY: F. Possessky TELEPHONE: (856) 339-1160 SummarO~f Mont:hly Operating Experience
- The unit entered th month at -99% power.
On December 07, power was raised to 100%.
- At the end of the m nth, the unit remained at 100% and completed 118 days of continuous n-line operation.