LR-N04-0446, September 2004 Monthly Operating Report for Hope Creek Generating Station
| ML043010242 | |
| Person / Time | |
|---|---|
| Site: | Hope Creek |
| Issue date: | 10/15/2004 |
| From: | Hutton J Public Service Enterprise Group |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| LR-N04-0446 | |
| Download: ML043010242 (3) | |
Text
PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 OCT 1 5 2004 LR-N04-0446 o PSEG NuclearLLC U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 MONTHLY OPERATING REPORT HOPE CREEK GENERATING STATION DOCKET NO. 50-354 In compliance with Section 6.9, Reporting Requirements for the Hope Creek Technical Specifications, the operating statistics for September 2004 are being forwarded.
Sincerely, aJrames A. Hutton Hope Creek Plant Manager Attachments C Distribution
--Creole 1_1;
95-2168 REV. 7d99
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-354 Hope Creek 10/6/04 F. Todd (856) 339-1316 Reporting Period September 2004 OPERATING DATA REPORT Design Electrical Rating (MWe-Net)
Maximum Dependable Capacity (MWe-Net)
No. of hours reactor was critical No. of hours generator was on line (service hours)
Unit reserve shutdown hours Net Electrical Energy (MWH) 1083 1049 W
Month Year-to-date Cumulative 720 6027 134553 720 5889 131845 0
0 0
723027 5800719 133539991 UNIT SHUTDOWNS NO.
DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION/
F=FORCED (HOURS)
(1)
SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2)
(1) Reason (2) Method A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)
H - Other 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)
DOCKET NO.: 50-354 UNIT: Hone Creek DATE: 10/6/04 COMPLETED BY: R. Ritzman TELEPHONE: (856) 339-1445 Summary Of Monthly Operating Experience
- Hope Creek entered the month at approximately 100% reactor power.
- On September 4, there was a planned power reduction to approximately 69%
to repair a Feedwater Heater Steam Supply Valve. Power was returned to 100% on September 5.
- On September 16, power was reduced to approximately 50% due to a 500kv line outage. Power was returned to 100% on September 19.
- At the end of the month, Hope Creek completed 170 days of continuous on-line operation.