LR-N03-0392, August 2003 Monthly Operating Report for Hope Creek

From kanterella
Jump to navigation Jump to search
August 2003 Monthly Operating Report for Hope Creek
ML032670971
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 09/12/2003
From: Hutton J
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-N03-0392
Download: ML032670971 (3)


Text

PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 SEP 1 2 2003 o PSEG NuclearLLC LR-N03-0392 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

MONTHLY OPERATING REPORT HOPE CREEK GENERATING STATION DOCKET NO. 50-354 In compliance with Section 6.9, Reporting Requirements for the Hope Creek Technical Specifications, the operating statistics for August 2003 are being forwarded.

Sincerely, K

Oames at Dutton

,v perations Director Attachments C Distribution 111.4A 96-2168 REV. 7199

DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-354 Hope Creek 9/9/03 F. Todd (856) 339-1316 Reporting Period August 2003 OPERATING DATA REPORT Design Electrical Rating (MWe-Net)

Maximum Dependable Capacity (MWe-Net)

No. of hours reactor was critical No. of hours generator was on line (service hours)

Unit reserve shutdown hours Net Electrical Energy (MWH) 1083 1049 wMonth Tear-to-aate 1umulauve 744 4985 126101 744 4852 123670 0

0 0145 781856 14972809 1125451500 UNIT SHUTDOWNS NO.

DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION!

F-FORCED (HOURS)

(1)

SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2)

=~~~~~~~~~

(1) Reason (2) Method A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator TraininglLicense Examination F - Administrative G - Operational Error (Explain)

H - Other 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4-Continuation 5 - Other (Explain)

DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 9/9/03 COMPLETED BY: R. Ritzman TELEPHONE: (856) 339-1445 Summary Of Monthly Operating Experience The unit entered the month at approximately 100% reactor power and operated throughout the month with no significant power reductions.

At the end of the month, Hope Creek completed 109 days of continuous on-line operation.