LR-N03-0392, August 2003 Monthly Operating Report for Hope Creek
| ML032670971 | |
| Person / Time | |
|---|---|
| Site: | Hope Creek |
| Issue date: | 09/12/2003 |
| From: | Hutton J Public Service Enterprise Group |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| LR-N03-0392 | |
| Download: ML032670971 (3) | |
Text
PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 SEP 1 2 2003 o PSEG NuclearLLC LR-N03-0392 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
MONTHLY OPERATING REPORT HOPE CREEK GENERATING STATION DOCKET NO. 50-354 In compliance with Section 6.9, Reporting Requirements for the Hope Creek Technical Specifications, the operating statistics for August 2003 are being forwarded.
Sincerely, K
Oames at Dutton
,v perations Director Attachments C Distribution 111.4A 96-2168 REV. 7199
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-354 Hope Creek 9/9/03 F. Todd (856) 339-1316 Reporting Period August 2003 OPERATING DATA REPORT Design Electrical Rating (MWe-Net)
Maximum Dependable Capacity (MWe-Net)
No. of hours reactor was critical No. of hours generator was on line (service hours)
Unit reserve shutdown hours Net Electrical Energy (MWH) 1083 1049 wMonth Tear-to-aate 1umulauve 744 4985 126101 744 4852 123670 0
0 0145 781856 14972809 1125451500 UNIT SHUTDOWNS NO.
DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION!
F-FORCED (HOURS)
(1)
SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2)
=~~~~~~~~~
(1) Reason (2) Method A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator TraininglLicense Examination F - Administrative G - Operational Error (Explain)
H - Other 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4-Continuation 5 - Other (Explain)
DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 9/9/03 COMPLETED BY: R. Ritzman TELEPHONE: (856) 339-1445 Summary Of Monthly Operating Experience The unit entered the month at approximately 100% reactor power and operated throughout the month with no significant power reductions.
At the end of the month, Hope Creek completed 109 days of continuous on-line operation.