Text
PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 FEB 1 7 2004 LR-N04-0059 0A PSEG Nuclear LLC U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 MONTHLY OPERATING REPORT HOPE CREEK GENERATING STATION DOCKET NO.60-354 In compliance with Section 6.9, Reporting Requirements for the Hope Creek Technical Specifications, the operating statistics for January 2004 are being forwarded.
Sincerely, Homes C. Hutton tope Creek Plant Manager Attachments C Distribution 7
6-11
95-2168 REV. 7/99
- -*i j DOCKET NO.:
UNIT:
, DATE:
COMPLETED BY:
TELEPHONE:
50-354 Hope Creek 2/10/04 F. Todd (856) 339-1316 Reporting Period January 2004 OPERATING DATA REPORT Design Electrical Rating (MWe-Net)
Maximum Dependable Capacity (MWe-Net)
No. of hours reactor was critical No. of hours generator was on line (service hours)
Unit reserve shutdown hours Net Electrical Energy (MWH) 1083 III __I
________S 1049 Month Year-to-date Cumulative 659 659 129184 628 1628 126585 0
0 0
617530 617530 128356802 UNIT SHUTDOWNS NO.
DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION!
F=FORCED (HOURS)
(1)
SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2) 1 1/12/04 F
116 hrs.
B 2
PCIG Initiation due to RMS failure during 1/17/04 testing. See LER 354/2004-001.
(1) Reason (2) Method A-Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F -Administrative G - Operational Error (Explain)
H - Other 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)
DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 2/10/04 COMPLETED BY: R. Ritzman TELEPHONE: (856) 339-1445 Summary Of Monthly Operating Experience
- The unit entered the month at 100% reactor power.
- On January 10, Hope Creek performed a planned power reduction to approximately 68% for maintenance on the switchyard and on a reactor feed pump.
- On January 12, the unit was manually scrammed due to Primary Containment Instrument Gas isolation following a Radiation Monitoring System failure. The plant was placed back on-line on January 17, reaching 100% power on January 19.
- On January 31, the power was reduced to approximately 61% for planned suppression testing and deep shallow rod swap.
- At the end of the month, Hope Creek completed 14 days of continuous on-line operation.