PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236
'APR 1 4 2005 LR-N05-0207
§I PSEG Au clear LLC U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 MONTHLY OPERATING REPORT HOPE CREEK GENERATING STATION DOCKET NO. 50-354 In compliance with Section 6.9, Reporting Requirements for the Hope Creek Technical Specifications, the operating statistics for March 2005 are being forwarded.
Sincerely,
- Michael J. Massaro Hope Creek Plant Manager Attachments C Distribution 95-2168 REV. 7/99
DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 4/8/05 COMPLETED BY: S. Wright TELEPHONE: (856) 339-1027 Reporting Period March 2005 OPERATING DATA REPORT Design Electrical Rating (MWe-Net)
Maximum Dependable Capacity (MWe-Net)
No. of hours reactor was critical No. of hours generator was on line (service hours)
Unit reserve shutdown hours Net Electrical Energy (MWH) 1083 1049 Month Year-to-date LIumulative I
647 1651 136438 618 1415 133494 0
0 0
672283 1383584 135171722 UNIT SHUTDOWNS NO.
DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION/
F=FORCED (HOURS)
(1)
SHUTTING COMMENT S=SCHEDULED DOWN THE l_
lREACTOR (2) 4 3/26/05 S
126 B
1 Drywell Leakage Due to Recirculation Piping 3/31/05 Leak 4-t 4-4-
4 (1) Reason (2) Method A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)
H - Other 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)
DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 4/8/05 COMPLETED BY: R. Ritzman TELEPHONE: (856) 339-1445 Summary Of Monthly Operating Experience
- Hope Creek began the month at approximately 100% power.
- On March 26, the unit was taken offline for a planned outage to identify and repair drywell leakage. It was manually shutdown on March 27. The outage continued through the end of the month.