LR-N05-0207, March 2005 Monthly Operating Report for Hope Creek Generating Station

From kanterella
Jump to navigation Jump to search
March 2005 Monthly Operating Report for Hope Creek Generating Station
ML051160221
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 04/14/2005
From: Massaro M
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-N05-0207
Download: ML051160221 (3)


Text

PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236

'APR 1 4 2005 §I PSEG Au clear LLC LR-N05-0207 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 MONTHLY OPERATING REPORT HOPE CREEK GENERATING STATION DOCKET NO. 50-354 In compliance with Section 6.9, Reporting Requirements for the Hope Creek Technical Specifications, the operating statistics for March 2005 are being forwarded.

Sincerely,

  • Michael J. Massaro Hope Creek Plant Manager Attachments C Distribution 95-2168 REV. 7/99

DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 4/8/05 COMPLETED BY: S. Wright TELEPHONE: (856) 339-1027 Reporting Period March 2005 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 1083 Maximum Dependable Capacity (MWe-Net) 1049 Month Year-to-date LIumulative I No. of hours reactor was critical 647 1651 136438 No. of hours generator was on line (service 618 1415 133494 hours)

Unit reserve shutdown hours 0 0 0 Net Electrical Energy (MWH) 672283 1383584 135171722 UNIT SHUTDOWNS NO. DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION/

F=FORCED (HOURS) (1) SHUTTING COMMENT S=SCHEDULED DOWN THE

_ l_ _ lREACTOR (2) 4 3/26/05 S 126 B 1 Drywell Leakage Due to Recirculation Piping 3/31/05 ____ Leak 4- t 4- 4- 4 (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other

DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 4/8/05 COMPLETED BY: R. Ritzman TELEPHONE: (856) 339-1445 Summary Of Monthly Operating Experience

  • Hope Creek began the month at approximately 100% power.
  • On March 26, the unit was taken offline for a planned outage to identify and repair drywell leakage. It was manually shutdown on March 27. The outage continued through the end of the month.