February 2005 Monthly Operating Report for Hope Creek Generating Station
ML050810419
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 03/14/2005
From: Massaro M
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-NO5-0144
Download: ML050810419 (3)


Text

PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 MAR 1 4 2005 § PSEG ATuclearLLC LR-N05-0144 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 MONTHLY OPERATING REPORT HOPE CREEK GENERATING STATION DOCKET NO. 50-354 In compliance with Section 6.9, Reporting Requirements for the Hope Creek Technical Specifications, the operating statistics for February 2005 are being forwarded.

Sincerely, Michael J. Massaro Hope Creek Plant Manager Attachments C Distribution Pines11 4 95-2168 REV. 7/99

- DOCKET NO.: 50-354 UNIT: Hone Creek DATE: 3/7/05 COMPLETED BY: F. Todd TELEPHONE: (856) 339-1316 Reporting Period February 2005 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 1083 __

Maximum Dependable Capacity (MWe-Net) 1049 _ A-Month Year-to-date Cumulative No. of hours reactor was critical 672 1004 135791 No. of hours generator was on line (service 672 796 - . 132875 hours)

Unit reserve shutdown hours 0 0 0 Net Electrical Energy (MWH) 686602 711301 134499439 UNIT SHUTDOWNS NO. DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION/

F=FORCED (HOURS) (1) SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2)

I t I 1- 1 t (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other

DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 3/7/05 COMPLETED BY: R. Ritzman TELEPHONE: (856) 339-1445 Summary Of Monthly Operatinq Experience

  • Hope Creek entered the month in power ascension following an outage, reaching 100% reactor power on February 8.
  • Hope Creek operated throughout the month without experiencing a power change that exceeded 20% of reactor power.
  • At the end of the month, Hope Creek completed 29 days of continuous on-line operation.