February 2005 Monthly Operating Report for Hope Creek Generating Station
ML050810419
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 03/14/2005
From: Massaro M
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-NO5-0144
Download: ML050810419 (3)


Text

PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 MAR 1 4 2005 LR-N05-0144

§ PSEG ATuclearLLC U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 MONTHLY OPERATING REPORT HOPE CREEK GENERATING STATION DOCKET NO. 50-354 In compliance with Section 6.9, Reporting Requirements for the Hope Creek Technical Specifications, the operating statistics for February 2005 are being forwarded.

Sincerely, Michael J. Massaro Hope Creek Plant Manager Attachments C Distribution Pines11 4

95-2168 REV. 7/99

- DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-354 Hone Creek 3/7/05 F. Todd (856) 339-1316 Reporting Period February 2005 OPERATING DATA REPORT Design Electrical Rating (MWe-Net)

Maximum Dependable Capacity (MWe-Net)

No. of hours reactor was critical No. of hours generator was on line (service hours)

Unit reserve shutdown hours Net Electrical Energy (MWH) 1083 1049 A-Month Year-to-date Cumulative 672 1004 135791 672 796 -

132875 0

0 0

686602 711301 134499439 UNIT SHUTDOWNS NO.

DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION/

F=FORCED (HOURS)

(1)

SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2)

I t

I 1-1 t

(1) Reason (2) Method A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)

H - Other 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)

DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 3/7/05 COMPLETED BY: R. Ritzman TELEPHONE: (856) 339-1445 Summary Of Monthly Operatinq Experience

  • Hope Creek entered the month in power ascension following an outage, reaching 100% reactor power on February 8.
  • Hope Creek operated throughout the month without experiencing a power change that exceeded 20% of reactor power.
  • At the end of the month, Hope Creek completed 29 days of continuous on-line operation.