LR-N03-0225, April 2003 Monthly Operating Report for Hope Creek Generating Station

From kanterella
Jump to navigation Jump to search
April 2003 Monthly Operating Report for Hope Creek Generating Station
ML031420564
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 05/14/2003
From: Waldinger L
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-N03-0225
Download: ML031420564 (3)


Text

I PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 MAY 1 4 2003 O PSEG Nuclear LLC LR-N03-0225 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

MONTHLY OPERATING REPORT HOPE CREEK GENERATING STATION DOCKET NO. 50-354 In compliance with Section 6.9, Reporting Requirements for the Hope Creek Technical Specifications, the operating statistics for April 2003 are being forwarded.

Sincerely, Lon Waldinger Operations Director JCN Attachments C Distribution

-- 9 1tl 95-2168 RIEV. 7/99

z. .

z

-i t

DOCKET NO.: 50-354 UNIT: Hope Creek

! DATE: 5/5/03 COMPLETED BY: F. Todd TELEPHONE: (856) 339-1316 Reporting Period April 2003 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 1083 Maximum Dependable Capacity (MWe-Net) 1049 Month Year-to-date Cumulative No. of hours reactor was critical 356 2316 123431 l No. of hours generator was on line (service 355 2230 121048 hours)

Unit reserve shutdown hours 0 0 0 Net Electrical Energy (MWH) 352710 2272677 122751368 UNIT SHUTDOWNS NO. DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION/

F=FORCED (HOURS) (1) SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2) 1 4/15/03 S 364 C 1 Refueling Outage (RF 1) 4/31/03 (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H- Other

DOCKET NO.: 50-354 UNIT: HoDe Creek DATE: 5/5/03 COMPLETED BY: J. Nagle TELEPHONE: (856) 339-3171 Summary Of Monthly Operatina Exnerience

  • On April 15h, the unit was taken offline for the planned refueling outage