LR-N04-0404, August 2004 Monthly Operating Report for Hope Creek Generating Station

From kanterella
Jump to navigation Jump to search
August 2004 Monthly Operating Report for Hope Creek Generating Station
ML042660081
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 09/13/2004
From: Hutton J
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-N04-0404
Download: ML042660081 (3)


Text

PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 SEP 1 3 2004 LR-N04-0404 o PSEG Nuclear LLC U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 MONTHLY OPERATING REPORT HOPE CREEK GENERATING STATION DOCKET NO. 50-354 In compliance with Section 6.9, Reporting Requirements for the Hope Creek Technical Specifications, the operating statistics for August 2004 are being forwarded.

Sincerely, Jmes. Hutton Cope Creek Plant Manager Attachments C Distribution 95-2168 REV. 7/99

DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-354 Hone Creek 9/7/04 F. Todd (856) 339-1316 Reporting Period August 2004 OPERATING DATA REPORT Design Electrical Rating (MWe-Net)

Maximum Dependable Capacity (MWe-Net)

No. of hours reactor was critical No. of hours generator was on line (service hours)

Unit reserve shutdown hours Net Electrical Energy (MWH) 1083 I

1049 Month Year-to-date Cumulative 744 5307 133833 744 5169 131125 0

o 0

740863 5077692 132816964 UNIT SHUTDOWNS NO.

DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION/

F=FORCED (HOURS)

(1)

SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2)

(1) Reason (2) Method A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)

H - Other 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)

DOCKET NO.: 50-354 UNIT: Hope Creek DATE: 9/7/04 COMPLETED BY: R. Ritzman TELEPHONE: (856) 339-1445 Summary Of Monthly Operating Experience

  • Hope Creek entered the month at approximately 100% reactor power.
  • On August 2, power was reduced to approximately 79% due to a Feedwater heater trip.

Power was restored to approximately 98.6% on August 3.

  • On August 7, power was reduced to approximately 79% power to perform planned scram time testing and a deep shallow rod swap. Power was returned to approximately 98.6% on August 8.
  • On August 21, power was reduced to approximately 59% power for planned repairs on the feedwater heater steam supply valve. Power was returned to approximately 98.6% on August 22.
  • At the end of the month, Hope Creek completed 140 days of continuous on-line operation.