LR-N05-0450, August 2005 Monthly Operating Report for Hope Creek Generating Station
| ML052630393 | |
| Person / Time | |
|---|---|
| Site: | Hope Creek |
| Issue date: | 09/12/2005 |
| From: | Massaro M Public Service Enterprise Group |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| LR-N05-0450 | |
| Download: ML052630393 (3) | |
Text
PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 SEP 1 2 2005 O PSEG N~uclear LLC LR-N05-0450 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 MONTHLY OPERATING REPORT HOPE CREEK GENERATING STATION DOCKET NO. 50-354 In compliance with Section 6.9, Reporting Requirements for the Hope Creek Technical Specifications, the operating statistics for August 2005 are being forwarded.
Sincerely, Michael J. Massaro Hope Creek Plant Manager Attachments C Distribution
.f (R aq 95-2168 REV. 7199
DOCKET NO.:
UNIT:
- DATE:
COMPLETED BY:
TELEPHONE:
50-354 Hope Creek 9/7/05 K. Hight (856) 339-3887 Reporting Period August 2005 OPERATING DATA REPORT Design Electrical Rating (MWe-Net)
Maximum Dependable Capacity (MWe-Net)
No. of hours reactor was critical No. of hours generator was on line (service hours)
Unit reserve shutdown hours Net Electrical Energy (MWH) 1083 1049 Month
==I AII Year-to-date Cumulative 665 4882 139669 665 4552 136631 0
0 0
703030 4683905 138472043 UNIT SHUTDOWNS
-NO.
DATE "TYPE DURATION REASON METHOD OF CORRECTIVE ACTION!
F=FORCED (HOURS)
(1)
SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2) 6 8/28/05 F
78.7 A
1 B Torus To Drywell Vac Breaker failed to close.
8/31/05 (1) Reason (2) Method A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D-Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)
H - Other 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-354 Hope Creek 9/7/05 R. Ritzman (856) 339-1445 Summary Of Monthly Operating Experience The unit entered the month.at 100% power.
- On August 28, the unit was manually shutdown due to the inability to maintain one of the Torus to Drywell Vacuum Breakers in a closed position.
- At the end of the month, the unit remained in the maintenance outage.